Text

.

  • 1

', OPERATING DATA REPORT DOCKET No. 50-364 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes

1. Unit Names- -Joseph H. Farley - Unit 2 1) Cumulative data since
2. Reporcing Period: Februhry 1990 7-30-81, date of

-3.-Licensed Thermal Power (HWt): 2,65E' commercial operation.

4.-Nameplate Rating (Gross HWe): 860

5. Design Electrical Rating (Net HWe): 829
6. Maximum Dependable Capacity (Gross HWe): 868.6
7. Maximum Dependable Capacity (Net HWe): 828.2
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net HVe): N/A +
10. Reasons For Restrictions, If Any: N/A This Month Tr-to-Date Cumulative
11. Hours In Reporting Period 672 1,416 75,265
12. Number Of Hours Reactor Vas Critical 672.0 1,416 65,299.1 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 672.0 1,416.0 _ 64,488.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross' Thermal Energy Generated (MVH) 1,631,313 3,601,619 163,857,886
17. Gross Electrical Energy Generated (MVH) 537,460 1,192,390 _53,858,932
18. Net Electrical Energy Generated (HVH) 509,660 1,134,424 51,077,814
19. Unit Service Factor 100.0 100.0 85.7
20. Unit Availability Factor 100.0 100.0 85.7

.21. Unit Capacity Factor (Using HDC Net) 91.6 96.7 83.0

22. Unit Capacity Factor (Using DER Net) 91.5 96.6 81.9 l> :23. Unit Forced Outage Rate 0 0.0 4.5 l1 24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each):

L .N/A

=

25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved l

INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 i Form 2/30 9007190159 900711 DR ADOCK0500g4