Text
[~
I l
e l
Dave M: rey S:uthern Nuclear l
Vice President.
Op:r ting C:mpa y l
f artey Project P,0. Box 1295 Birmingham. Alabama 35201 Tel 205 992.5131 k
SOUTHERN h April 9, 1998 COMN Energy ro Serve YourWorld' Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission i
ATIN: Document Control Desk Washington, D C 20555 i
1 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the March 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
if you have any questions, please advise.
Respectfully submitted, h ??l4Hf Dave Morey [
l RWC:(mor)
Enclosures El - March Monthly Operating Report for Plant Farley Unit I
/
E2 - March Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region 11 Administrator
/
Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector
/
)
9804150348 980331 PDR ADOCK 05000348 R
OPERATING DATA REPORT
_ _ 50-34_8_.
DOCKET NO.:
UNIT NAME:
J. M._Farley - Unit 1 DATE:
_ _ April 3,1998 COMPLETED HY:
_ __ A.L. Robinson _._ _
TELEPilONE:
_ 334) 899-5156, cxt. 3_627_
(
OPERATING STATUS 1.
Reporting Period:
March 1998._
2.
Design Electrical Rating (Net MWe):
._ ___. _ 829_.
3.
Maximum Dependable Capacity (Net MWe):
822_
This Month Year to Date Cumulative 4.
Number OfIlours Reactor Was Critical:
. _.,_ 744.0
_ _ _ _2.160.0_
._.. ___. _144,441.6 5.
Ifours Generator On line:
744.0 2,160.0 142,379.4 6.
Unit Reserve Shutdown llours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWil):
~ -618,100 5
~
~ 38Kd35.0~
II2,D853678
~
1 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date t Tag No.
t Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
UNIT SIIUTDOWNS e
DOCKET NO.:
. _.... _ _ 5 0-3_4 8 _ _
UNIT NAME:
J. M. Farley - Unit 1 DATE:
_ April 3,1998 COMPLETED IlY:
A.L. Robinson REPORTING PERIOD: March 1998 TELEPilONE:
(33_4[8j9-5156, ext. 3627 Type i
Method of l
F: Forced Duration l ReasonShutting Down {
Cause/ Corrective Actions No.
Date S: Scheduled (llours) l (1)
(2)
Comments There were no unit shutdowns during the month.
l ti) KI AMJN,
(2) Mt.IIRJL).
A 1:quipment failure (Explain) 1 Manual 11 Maintenance or Test 2 - Manual Trip / Scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain) f F Administrative G - Operational I:rror (Explain)
!! other(Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS 4
NARRATIVE REPORT There were no significant power reductions or major safety related maintenance during the month.
i r
El-2 l
1
OPERATING DATA REPORT DOCKET NO.:
_ _ 5_0-_3 54_ _ _...
UNIT NAME:
_.J. hj. Failey.- Unit 2 DATE:
_._ April 3,1998_
COMPLETED llY:
_ A.L. Robinson _ _ _
TELEPilONE:
(334) 899-5156, ext. 3627_
OPERATING STATUS 1.
Reporting Period:
. _ March 1998..
2.
Design Electrical Rating (Net MWe):
___ _.___829 I
3.
Maximum Dependable Capacity (Net MWe):. _ _..
_828 f
This Month Year to Date Cumulative 4.
Number OfIlours Reactor Was Critical:
_ _649_.4
_. _ _ _ 2,065.4 126,982_4..
5.
Ilours Generator On-line:
. _ _ 649. l.
2,065.l_
_ _ _ 125,196 0_.
6.
Unit Reserve Shutdown Ilours:
0.0
_ _.__. _ 0.0_
_ __ _ _ _ _ _ _ 0 0_
7.
Net Electrical Er rgy Generated (MWil):
541,708.0 1,735 62_8.0_
_ _ _ 99,566.992.0_
l CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date I ag No.'
i Event Description
,i l
There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
i I
i E2-1
I UNIT SIIUTDOWNS DOCKET NO.:
._ 5 0.- 3 64 _ _ _
UNIT NAME:
..J. M. Farley -_U_ nit 2 DATE:
April 3,1998 COMPLETED BY:
A.L. Robinson REPORTING PERIOD: March 1998 TELEPilONE:
(334) 899-5156, ext. 3627 j
l Type l
l Method of j
F: Forced Duration ' Reason iShutting Down Cause/ Corrective Actions No.
Date l S: Scheduled (llours)
(1) l (2)
Comments 001
- 980328 S
95 l
C 1
5\\t 0106, on 980328, the unit was f
j taken offline for the twelfth l
refueling outage.
I 1
I i
(1) KI ANUN.
W) Mk.IllutA A l'quipment l'ailure (lisplain) 1 Maiual l
n Maintenruice or Test 2 - Manual Trip /Sc am C - Refueling 3 - Automatic Trip Scram D - Regulatory Restriction 4 - Continuation E Opcrator Training /l.icense I xamination 5 Other(Explain?
I l'- Administrative I
O - Operatiocal 1:rror (Explain)
II-(hher (I:xplain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The unit was ramped down and taken offline at 0106 on 980328 for the twelfth refueling outage. After the reactor was shutdown, control rod K-2 dropped due to a blown fuse in a rod control cabinet and the reactor trip breakers were opened to insert the remaining control rods.
E2-2