I l

e l

Dave M: rey S:uthern Nuclear l

Vice President.

Op:r ting C:mpa y l

f artey Project P,0. Box 1295 Birmingham. Alabama 35201 Tel 205 992.5131 k

SOUTHERN h April 9, 1998 COMN Energy ro Serve YourWorld' Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission i

ATIN: Document Control Desk Washington, D C 20555 i

1 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the March 1998 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

if you have any questions, please advise.

Respectfully submitted, h ??l4Hf Dave Morey [

l RWC:(mor)

Enclosures El - March Monthly Operating Report for Plant Farley Unit I

/

E2 - March Monthly Operating Report for Plant Farley Unit 2 cc: Mr. L. A. Reyes, Region 11 Administrator

/

Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector

/

)

9804150348 980331 PDR ADOCK 05000348 R

PDR

OPERATING DATA REPORT

_ _ 50-34_8_.

DOCKET NO.:

UNIT NAME:

J. M._Farley - Unit 1 DATE:

_ _ April 3,1998 COMPLETED HY:

_ __ A.L. Robinson _._ _

TELEPilONE:

_ 334) 899-5156, cxt. 3_627_

(

OPERATING STATUS 1.

Reporting Period:

March 1998._

2.

Design Electrical Rating (Net MWe):

._ ___. _ 829_.

3.

Maximum Dependable Capacity (Net MWe):

822_

This Month Year to Date Cumulative 4.

Number OfIlours Reactor Was Critical:

. _.,_ 744.0

_ _ _ _2.160.0_

._.. ___. _144,441.6 5.

Ifours Generator On line:

744.0 2,160.0 142,379.4 6.

Unit Reserve Shutdown llours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWil):

~ -618,100 5

~

~ 38Kd35.0~

II2,D853678

~

1 CilALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date t Tag No.

t Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

UNIT SIIUTDOWNS e

DOCKET NO.:

. _.... _ _ 5 0-3_4 8 _ _

UNIT NAME:

J. M. Farley - Unit 1 DATE:

_ April 3,1998 COMPLETED IlY:

A.L. Robinson REPORTING PERIOD: March 1998 TELEPilONE:

(33_4[8j9-5156, ext. 3627 Type i

Method of l

F: Forced Duration l ReasonShutting Down {

Cause/ Corrective Actions No.

Date S: Scheduled (llours) l (1)

(2)

Comments There were no unit shutdowns during the month.

l ti) KI AMJN,

(2) Mt.IIRJL).

A 1:quipment failure (Explain) 1 Manual 11 Maintenance or Test 2 - Manual Trip / Scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain) f F Administrative G - Operational I:rror (Explain)

!! other(Explain) l CAUSE/ CORRECTIVE ACTION / COMMENTS 4

NARRATIVE REPORT There were no significant power reductions or major safety related maintenance during the month.

i r

El-2 l

1

OPERATING DATA REPORT DOCKET NO.:

_ _ 5_0-_3 54_ _ _...

UNIT NAME:

_.J. hj. Failey.- Unit 2 DATE:

_._ April 3,1998_

COMPLETED llY:

_ A.L. Robinson _ _ _

TELEPilONE:

(334) 899-5156, ext. 3627_

OPERATING STATUS 1.

Reporting Period:

. _ March 1998..

2.

Design Electrical Rating (Net MWe):

___ _.___829 I

3.

Maximum Dependable Capacity (Net MWe):. _ _..

_828 f

This Month Year to Date Cumulative 4.

Number OfIlours Reactor Was Critical:

_ _649_.4

_. _ _ _ 2,065.4 126,982_4..

5.

Ilours Generator On-line:

. _ _ 649. l.

2,065.l_

_ _ _ 125,196 0_.

6.

Unit Reserve Shutdown Ilours:

0.0

_ _.__. _ 0.0_

_ __ _ _ _ _ _ _ 0 0_

7.

Net Electrical Er rgy Generated (MWil):

541,708.0 1,735 62_8.0_

_ _ _ 99,566.992.0_

l CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date I ag No.'

i Event Description

,i l

There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

i I

i E2-1

I UNIT SIIUTDOWNS DOCKET NO.:

._ 5 0.- 3 64 _ _ _

UNIT NAME:

..J. M. Farley -_U_ nit 2 DATE:

April 3,1998 COMPLETED BY:

A.L. Robinson REPORTING PERIOD: March 1998 TELEPilONE:

(334) 899-5156, ext. 3627 j

l Type l

l Method of j

F: Forced Duration ' Reason iShutting Down Cause/ Corrective Actions No.

Date l S: Scheduled (llours)

(1) l (2)

Comments 001

980328 S

95 l

C 1

5\\t 0106, on 980328, the unit was f

j taken offline for the twelfth l

refueling outage.

I 1

I i

(1) KI ANUN.

W) Mk.IllutA A l'quipment l'ailure (lisplain) 1 Maiual l

n Maintenruice or Test 2 - Manual Trip /Sc am C - Refueling 3 - Automatic Trip Scram D - Regulatory Restriction 4 - Continuation E Opcrator Training /l.icense I xamination 5 Other(Explain?

I l'- Administrative I

O - Operatiocal 1:rror (Explain)

II-(hher (I:xplain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT The unit was ramped down and taken offline at 0106 on 980328 for the twelfth refueling outage. After the reactor was shutdown, control rod K-2 dropped due to a blown fuse in a rod control cabinet and the reactor trip breakers were opened to insert the remaining control rods.

E2-2