Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20203A265
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/31/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9902090322
Download: ML20203A265 (6)


Text

-

~-

y Dave Morey SIuthern Nucirr Vice President Operating Company Farley Project P.O. Box 1295 Birming%tn. Alabama 35201 Tel 205.932.5131 c.

February 2, 1999 SOUTHERN h COMPANY Docket Nos.:

50-348

'"" U " " 'Y'" # "

50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk

)

Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

i Enclosed are the January 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant I

Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

$N bl Dave Morey RWC:mor

Enclosures:

1. January Monthly Operating Report for Plant Farley Unit 1
2. January Monthly Operating Report for Plant Farley Unit 2 i

W 9902090322 990131 PDR ADOCK 05000349?

i R

PDR

p.

~ _._ -.....

.~..

- e.

i

(.

. PEge 2 l

- U. S. Nuclear Regulatory Commission.

.t.

l l

'cc:

Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager i

f j

U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. J. I. Zimmerman, Licensing Project Manager - Farley i

J U. S. Nuclear Regulatory Commission, Region II l

Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley -

r

?

l' 1

- i i

1 1

-1 1

l l

3 '

s 1

Y i

1 i

t

OPERATING DATA REPORT

)

DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - UnitI DATE:

February 1,1999 COMPLETED BY:

W. L. Marlar l

TELEPIIONE:

(334) 814-4554 OPERATING 3TATUS 1.

Reporting Period:

JANUARY 1999 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

847 l

1 I

This31onth Yeatto_Date Cumulative 4.

Number Of Hours Reactor Was Critical:

744.0 744.0 149,647.2 5.

Ho"rs Generator On-line:

744.0 744.0 147,503.7 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

_ _ 615,159.0 615,159.0 116,149,476.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Iag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I

{

El-1

e UNIT SHUTDOWNS DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

February 1,1999

.n.

COMPLETED BY:

W. L. Marlar REPORTING PERIOD: JANUARY _1999 TELEPHONE:

(3341814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date s: scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

0) KLAdvN.

g) MLinuu.

A - Equipment Failure (Explain) 1 Manual B MaintenanceorTest 2 - Manual Trip / scram C Refueling 3 Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - Operator Trainios/ License Examination 5 -other (Explain)

F-Administrative G - Operational Error (Explain)

II Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS.

NARRATIVE REPORT On 990101 at 0001 the Unit was on hold at 48Io power following a Normal Refueling Outage.

On 990103 at 2000 the Unit achieved 100% power.

On 990109 at 0300 the Unit was ramped down to 52% power to repair a Main Generator Isophase Bus Duct Cooling Unit Fan Bearing. The Unit returned to 100% power on 990109 at 2205.

El-2

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

February 1,1999 COMPLETED BY:

W. L. Marlar t

TELEPHONE:

(334) 814-4554 L

OPERATING _ STATUS 1.

Reporting Period:

JANUARY 1999 2.

Design Electrical Rating (Net MWe):

829 3.

Maximum Dependable Capacity (Net MWe):

852 This31onth Yeatto_Date Cumulative 4.

Number Of Hours Reactor Was Critical:

744.0 744.0 133,212.4 5.

Hours Generator On-line:

744.0 744.0 131,389.4 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

631,301.0 631,301.0 104,730,587.0 i

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES

""Date i I ag No.

I Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

1 1,"

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

February 1,1999 COMPLETED BY:

W. L. Marlar REPORTING PERIOD: JANUARYl999 TELEPHONE:

(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

- Date s: scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns 1

during the month.

1 l

l i

i 1

4 (4) KLA5UN.

(2) Mt.ittuu.

A-Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 - Manual Trip / scram C-Refueling 3 AutomaticTrip/ scram D-Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 -Other (Explain)

F Administrative o-Operational Error (Explain)

II-Other (Explain) i CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990113 at 0501 the Unit was ramped dovmT80% power to make repairs to an off site transmission line.

On 990113 while at 79% power the 2A Reheat Swp Valve failed to reopen during governor valve testing. The valve was repaired and the Unit was returned to 100% power on 990114 at 2110.

E2-2 l

I