y Dave Morey SIuthern Nucirr Vice President Operating Company Farley Project P.O. Box 1295 Birming%tn. Alabama 35201 Tel 205.932.5131 c.
February 2, 1999 SOUTHERN h COMPANY Docket Nos.:
50-348
'"" U " " 'Y'" # "
50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk
)
Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
i Enclosed are the January 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant I
Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
$N bl Dave Morey RWC:mor
Enclosures:
- 1. January Monthly Operating Report for Plant Farley Unit 1
- 2. January Monthly Operating Report for Plant Farley Unit 2 i
W 9902090322 990131 PDR ADOCK 05000349?
i R
p.
~ _._ -.....
.~..
- e.
i
(.
. PEge 2 l
- U. S. Nuclear Regulatory Commission.
.t.
l l
'cc:
Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager i
f j
U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. J. I. Zimmerman, Licensing Project Manager - Farley i
J U. S. Nuclear Regulatory Commission, Region II l
Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley -
r
?
l' 1
- i i
1 1
-1 1
l l
3 '
s 1
Y i
1 i
t
OPERATING DATA REPORT
)
DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - UnitI DATE:
February 1,1999 COMPLETED BY:
W. L. Marlar l
TELEPIIONE:
(334) 814-4554 OPERATING 3TATUS 1.
Reporting Period:
JANUARY 1999 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
847 l
1 I
This31onth Yeatto_Date Cumulative 4.
Number Of Hours Reactor Was Critical:
744.0 744.0 149,647.2 5.
Ho"rs Generator On-line:
744.0 744.0 147,503.7 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
_ _ 615,159.0 615,159.0 116,149,476.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES Date i Iag No.
- Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
I
{
El-1
e UNIT SHUTDOWNS DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
February 1,1999
.n.
COMPLETED BY:
W. L. Marlar REPORTING PERIOD: JANUARY _1999 TELEPHONE:
(3341814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date s: scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
- 0) KLAdvN.
g) MLinuu.
A - Equipment Failure (Explain) 1 Manual B MaintenanceorTest 2 - Manual Trip / scram C Refueling 3 Automatic Trip / Scram D-Regulatory Restriction 4 - Continuation E - Operator Trainios/ License Examination 5 -other (Explain)
F-Administrative G - Operational Error (Explain)
II Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS.
NARRATIVE REPORT On 990101 at 0001 the Unit was on hold at 48Io power following a Normal Refueling Outage.
On 990103 at 2000 the Unit achieved 100% power.
On 990109 at 0300 the Unit was ramped down to 52% power to repair a Main Generator Isophase Bus Duct Cooling Unit Fan Bearing. The Unit returned to 100% power on 990109 at 2205.
El-2
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
February 1,1999 COMPLETED BY:
W. L. Marlar t
TELEPHONE:
(334) 814-4554 L
OPERATING _ STATUS 1.
Reporting Period:
JANUARY 1999 2.
Design Electrical Rating (Net MWe):
829 3.
Maximum Dependable Capacity (Net MWe):
852 This31onth Yeatto_Date Cumulative 4.
Number Of Hours Reactor Was Critical:
744.0 744.0 133,212.4 5.
Hours Generator On-line:
744.0 744.0 131,389.4 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
631,301.0 631,301.0 104,730,587.0 i
CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES
""Date i I ag No.
I Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
1 1,"
UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
February 1,1999 COMPLETED BY:
W. L. Marlar REPORTING PERIOD: JANUARYl999 TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
- Date s: scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns 1
during the month.
1 l
l i
i 1
4 (4) KLA5UN.
(2) Mt.ittuu.
A-Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 - Manual Trip / scram C-Refueling 3 AutomaticTrip/ scram D-Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 -Other (Explain)
F Administrative o-Operational Error (Explain)
II-Other (Explain) i CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990113 at 0501 the Unit was ramped dovmT80% power to make repairs to an off site transmission line.
On 990113 while at 79% power the 2A Reheat Swp Valve failed to reopen during governor valve testing. The valve was repaired and the Unit was returned to 100% power on 990114 at 2110.
E2-2 l
I