Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20203A265
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/31/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9902090322
Download: ML20203A265 (6)


Text

- - - - .- - - . .-- ~-

.,; y Dave Morey SIuthern Nucirr Vice President Operating Company Farley Project -

P.O. Box 1295 ,

Birming%tn. Alabama 35201 Tel 205.932.5131

c. .

February 2, 1999 SOUTHERN h Docket Nos.: 50-348 COMPANY 50-364 '"" U " " 'Y'" # "

U. S. Nuclear Regulatory Commission ,

ATTN: Document Control Desk )

Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report ,

Ladies and Gentlemen: i Enclosed are the January 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant  !

I Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

$N bl Dave Morey RWC:mor

Enclosures:

1. January Monthly Operating Report for Plant Farley Unit 1
2. January Monthly Operating Report for Plant Farley Unit 2 i

W 9902090322 990131 PDR ADOCK 05000349?

i R PDR

~ _ ._ -. . . .. .~.. .. . .- - . . . _. . - _ . . ._.- .

p.

- e. #,  ;..

i ..

(. . PEge 2 l - U. S. Nuclear Regulatory Commission .

.t. .---

l l 'cc: Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager i

f #

j U. S. Nuclear Regulatory Commission, Washington, D. C. I Mr. J. I. Zimmerman, Licensing Project Manager - Farley  ;

i .

J U. S. Nuclear Regulatory Commission, Region II l Mr. L. A. Reyes, Regional Administrator l Mr. T. P. Johnson, Senior Resident Inspector - Farley - -

r

?

. l l'

1

-i i

1 l

1

-1 1

l l

3 '

s 1

Y i

1 i

', OPERATING DATA REPORT

) DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - UnitI DATE:

{

February 1,1999  ;

l COMPLETED BY: W. L. Marlar l TELEPIIONE: (334) 814-4554 OPERATING 3TATUS  !

1. Reporting Period: JANUARY 1999
2. Design Electrical Rating (Net MWe): 829
3. Maximum Dependable Capacity (Net MWe): 847 l

l 1

I I

This31onth Yeatto_Date Cumulative

4. Number Of Hours Reactor Was Critical: 744.0 744.0 149,647.2
5. Ho"rs Generator On-line: 744.0 744.0 147,503.7
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): _ _ 615,159.0 615,159.0 116,149,476.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES )

1 Date i Iag No.  ; Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I

{

El-1

e UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1

.n. .

DATE: February 1,1999 COMPLETED BY: W. L. Marlar I REPORTING PERIOD: JANUARY _1999 TELEPHONE: (3341814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions '

No. Date s: scheduled (Hours) (1) (2) Comments There were no unit shutdowns  ;

during the month.  !

0) KLAdvN. g) MLinuu.

A - Equipment Failure (Explain) 1 Manual B MaintenanceorTest 2 - Manual Trip / scram C Refueling 3 Automatic Trip / Scram D- Regulatory Restriction 4 - Continuation E - Operator Trainios/ License Examination 5 -other (Explain)

F- Administrative G - Operational Error (Explain)

II Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS.

NARRATIVE REPORT On 990101 at 0001 the Unit was on hold at 48Io power following a Normal Refueling Outage.

On 990103 at 2000 the Unit achieved 100% power.

On 990109 at 0300 the Unit was ramped down to 52% power to repair a Main Generator Isophase Bus Duct Cooling Unit Fan Bearing. The Unit returned to 100% power on 990109 at 2205.

El-2

', OPERATING DATA REPORT

, DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2

. .. DATE: February 1,1999 COMPLETED BY: W. L. Marlar t TELEPHONE: (334) 814-4554 L

OPERATING _ STATUS

1. Reporting Period: JANUARY 1999
2. Design Electrical Rating (Net MWe): 829
3. Maximum Dependable Capacity (Net MWe): 852 This31onth Yeatto_Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 744.0 133,212.4
5. Hours Generator On-line: 744.0 744.0 131,389.4
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): __,

631,301.0 631,301.0 104,730,587.0 i

CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES

""Date i I ag No. I Event Desenption There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I E2-1

1

1," UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2

,_, ,. , DATE: February 1,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JANUARYl999 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. - Date s: scheduled (Hours) (1) (2) Comments

! There were no unit shutdowns 1 during the month.

1 l

l l

i 1

i 1

4

(4) KLA5UN. (2) Mt.ittuu.

A- Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 - Manual Trip / scram C- Refueling 3 AutomaticTrip/ scram D- Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 -Other (Explain)

F Administrative o-Operational Error (Explain)

II- Other (Explain) i CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990113 at 0501 the Unit was ramped dovmT80% power to make repairs to an off site transmission line.

On 990113 while at 79% power the 2A Reheat Swp Valve failed to reopen during governor valve testing. The valve was repaired and the Unit was returned to 100% power on 990114 at 2110.

E2-2 l

I