Text

" *

, Southern Nuclear Operating Company Post Offics Box 1295

. Bemingham. Al*bama 35201 Telephe ne (205) 868-5131 L k o... uor.y Southern Nudear Operating Company Vice President Farley Pro}ect the Southem electhC System June 12,1996 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthlv Ooerating Reoort Gentlemen:

Attached are the May 1996 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

l Respectfully submitted, 1 Dave Morey RWC:(mor)

Attachments I

cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross 1

l

. i i l i

l 1700'75 i

i I 9606180355 960531  ;

' PDR .ADOCK 05000348 R PDR .

k )i 1 m

1 3

Joseph M. Farley Nuclear Plant

' Unit I

{ Narrative Summary of Operations May 1996 I At 2200 on May 3,1996, with the unit operating in mode 1 at 100% reactor i i power, the unit was shut down for a scheduled maintenance outage to  ;

replace the 1 A Control Rod Drive Mechanism Cooling Fan motor and the I i 1 A Reactor Cavity Cooling Fan motor. The shutdown was to enhance the j unit's reliability.

1 ,

j a  !

In response to NRC Bulletin 96-01 " Control Rod Insertion Problems", 9 l the unit was manually tripped from 2% reactor power and all rods j' inserted satisfactorily. Rod drop time testing was' completed satisfactorily after the reactor was shutdown.
All repairs were completed and the unit was returned to 100% reactor power at 1137 on May 7,1996.

l The following safety related maintenance was performed during the month: )

1.- A tube leak was repaired on the IB Containment Cooler.

[ 2.: Performed 9 month,18 month, and 5 year preventative maintenance

j. and repairs on the 1-2A diesel generator. Included in the repairs

! were replacement of the intercooler heat exchanger tube bundle,

{

rework of the diesel exhaust system, replacement of the diesel

governor and eddy current testing of all heat exchangers.

l i

1 i

4 L

4

OPERATING DATA REPORT DOCKET NO. 50-348 DATE June 5,1996 COMPLETED BY M. W. McAnuity TELEPilONE (334) 899-5156, ext.3640 QPERATING_ STAT _US

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: May 1996 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe) _, 855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative
11. Hours in Reporting Period 744.0 3,647.0 162,167.0
12. Number Of Hours Reactor Was Critical 715.3 3,618.3 130,307.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-line 700.0 3,603.0 128,278.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Genercted (MWH) _ 1,798,798.6 9,397,566.3 330,151,939.2
17. Gross Electrical Energy Generated (MWH) 584,013.0 3,092,953.0 106,585,107.0
18. Net Electrical Energy Generated (MWH) 552,709.0 2,938,067.0 100,677,719.0
19. Unit Service Factor 94.1 98.8 79.1
20. Unit Availability Factor 94.1 98.8 79.1
21. Unit Capacity Factor (Using MDC Net) 91.5 99.2 76.5
22. Unit Capacity Factor (Using DER Net) 89.6_ 97.2 74.9
23. Unit Forced Outage Rate 0.0 0.0 5.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

4 DOCKET NO. 50-348 l UNIT 1 DATE- June 5,1996 i

COMPLETED BY M. W. McAnulty

! TELEPIIONE (334) 899-5156 ext 364 i

MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

)

832 822

) ;

1 17 2 831 18 822 1 3 811 19 821 i

4 51 20 821 j 5 0 21 822 i

6 188 22 815 s

7 638 23 820

. 8 822 24 816 i l 9 823 25 819 10 822 26 817 11 823 27 817 i

12 831 28 823 l 13 830 29 821 14 829 30 818 4

15 824 31 822 16 822 l

l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

= . . . _ - - . - . . . . - _ . ._ .. .

UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE June 5,1996 COMPLETED BY M. W. McAnulty REPORT MONT May TELEPHONE (334) 899-5156, ext.3640 j R M E E s j

T A T Y l

j Y s 11 sC P O O TO CAUsE AND CORRECrlVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURs) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE l002 960503 S 44 B 1 N/A CD, MO At 2200 on 960503, with the unit operating VA in mode 1 at 100% reactor power, the unit was shut down for a scheduled maintenace

! outage to replace the 1 A Control Rod Drive -

Mechanism Cooling Fan motor and the 1 A

, Reactor Cavity Cooling Fan motor. This

! outage was scheduled to enhance the unit's

! reliability for the upcoming Olympic Games.

I In response to NRC Bulletin 96-01 " Control Rod Insertion Problems", the unit was manually tripped from 2% reactor power.

All rods fully inserted satisfactorily and rod drop time testing was performed satisfactorily

-; after shutdown.

s 1

l All repairs were completed and the unit was i returned to 100% reactor power at 1137 on 960507.

l 1: 2: 3: EVENrs REPORTED F: Forced Reason Method INVOLVE A s: scheduled A Equipment Failure (Explain) 1 - Manual GREATER TilAN 20%

11. Maintenance or Test 2 Manualscram REDUCTION IN C Refueling 3 Automatic scram AVERAGE DAILY D Regulatory Restriction 4 - Other (Explain) POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24 F- Administrative llOURs.

G Operational Error (Explain)

!! Other(Explain)

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations May 1996 At 2205 on May 24,1996, with the unit operating in mode I at 100% reactor power, the unit was ramped down to 15% reactor power to perform a chemistry flush of the steam generators. ,

Flushing was completed and the unit was returned to 100% reactor power at 0032 on May 27,1996. .

There was no major safety related maintenance performed during the month.

1 b

f i

l S

OPERATING DATA REPORT DOCKET NO. 50-364 DATE _, June 5,1996 COMPLETED BY M. W. McAnulty TELEPflONE [334) 899-5156, ext.3640 OITRATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: May 1996 1) Cumulative data since 07-30-81,

]

3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.

. 4. Nameplate Rating (Gross MWe): 860

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe) 863.6
7. Maximum Dependable Capacity (Net MWe): 822 .
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A 4
9. Power Level To Which Restricted, if Any (Net MWe): N/A i 10. Reasons For Restrictions,if Any: N/A This Month Yr.to Date Cumulative
11. IIours in Reporting Period 744.0 3,647.0 130,080.0_
12. Number OfIlours Reactor Was Critical 744.0 3,647.0 112,550.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 l
14. Hours Generator On-line 744.0 3,647.0 110,857.2 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1,880,612.8 9,285,288.6 282,259,079.0 l
17. Gross Electrical Energy Generated (MWH) 612,276.0 3,059,686.0 92,522,165.0 j
18. Net Electrical Energy Generated (MWH) 581,700.0 2,910,066.0 87,723,717.0_ l
19. Unit Service Factor 100.0 100.0 85.2 j
20. Unit Availability Factor 100.0 100.0 85.2
21. Unit Capacity Factor (Using MDC Net) 95.1 97.1 82.3
22. Umi Capacity Factor (Using DER Net) 94.3 96.3 81.3 j
23. Unit Forced Outage Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for October 12,1996 with a duration of 47 days

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81 j

DOCKET NO. 50-364 UNIT 2 DATE June 5,1996 COMPLETED HY M. W. McAnulty TELEPilONE (334) 899-5156 ext 364 MONTH May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 838 17 825 2 835 18 825 3- 828 19 824 4 824 20 825 5 824 21 824 6 825 22 821 1

7 827- 23 823 8 827 24 809 9 827 25 84 10 826 26 204 i

11 827 27 818 12 833 28 822 l l

13 836 29 823  !

14 833 30 823 l 15 828 31 826 16 827 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

1

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE June $,1996 COMPLETED BY M. W. McAnuity REPORT MONT May TELEPHONE (334) 899-5156, ext.3640 R M E E S T A T Y Y S 11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACTION TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE 008 960524 S 0 B 4 N/A AB SG At 2205 on 960524, with the unit in mode 1 operating at 100% reactor power, the unit .

was ramped down to 15% reactor power tO perform a chemistry flush of the Steam Generators.

Flushing waS completed and the unit waS l returned tO 100% reactor power at 0032 ,

1 on 960527, i

1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explam) 1 Manual GREATER TilAN 20%

B Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3 Automatic Scram AVERAGE DAILY

! D - Regulatory Restriction 4 Other(Explain) POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24 l F Administrative llOURS.

G Operational Error (Explain)

l. II- Other (Explain)

+

.