Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2
ML20136G473
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/28/1997
From: Mcanulty M, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703180050
Download: ML20136G473 (9)


Text

a - - -. - -a x. - .w x . - . ~ -. 2 .-... --s - -- s.

, Dave Morey Souther 2 Nuclxt

., Vice President Operating Compuy Farley Project P0. Box 1295 Birmingham. Alabama 35201

. Tel 205 992.5131 SOUTHERN L March 11, 1997 COMPANY Energy to Serve YourWorld" i

Docket Nos. 50-348 50-364  ;

U. S. Nuclear Regulatory Commission ]

' ATTN: Document Control Desk i Washington, D C 20555 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

4 1 Attached are the February 1997 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

l 1

If you have any questions, please advise.

Respectfully submitted, .

1 I

Y' hl.cy.

Dave Morey l

RWC:(mor)

Attachments cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, FNP Sr. Resident inspector

-re $

9703180050 970228 PDR ADOCK 05000348 R.

- ~. v , ,,

PDR -

e e a

. _ _. ._ . ._ _ _. __. . . .m . - .

1 e-

-, Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations February 1997 There were no unit shutdowns or major power reductions during the month.

The design change to convert the "B" Train control room air conditioning unit from a water cooled to an air cooled unit was completed. The control room air conditioners are shared between units 1 and 2.

I l

l

e- OPERATING DATA REPORT DOCKET NO. 50-348 DATE March 6,1997 COMPLETED BY M. W. McAnuity TELEPIIONE (334) 899-5156, ext.3640 OPERATING _ STAT _US

1. Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: February 1997 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 866
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A l

This Month Yr. to Date Cumulative l

11. Hours in Reporting Period 672.0 1,416.0 168,720.0
12. Number Of Hours Reactor Was Critical 672.0 1,416.0 136,860.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0 l
14. Hours Generator On-line 672.0 1,416.0 134,831.7 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1,782,144.0 3,623,878.2 347,342,884.6 l
17. Gross Electrical Energy Generated (MWH) 584,063.0 1,186,250.0 112,197,828.0 l
18. Net Electrical Energy Generated (MWH) 555,163.0 1,125,336.0 106,007,292.0 l
19. Unit Service Factor 100.0 100.0 79.9 l
20. Unit Availability Factor 100.0 100.0 79.9 I
21. Unit Capacity Factor (Using MDC Net) 100.5 96.7 77.1
22. Unit Capacity Factor (Using DER Net) 99.7 95.9 75.8
23. Uni: Forced Outage Rate 0.0 0.0 5.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage scheduled for March 15,1997 with a duration of 56 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

,- DOCKET NO. 50-348 UNIT I DATE March 6,1997 COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 827 17 830 2 824 18 826 3 823 19 822 4 823 20 818 5 824 21 818 6 830 22 824 7 827 23 831 8 827 24 830 9 831 25 829 10 830 26 824 _

11 832 27 817 12 832 28 815 13 829 29 N/A 14 830 _

30 N/A 15 830 31 N/A 16 830 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

,- UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE March 6,1997 COMPLETED BY M. W. McAnulty REPORT MONTH February _ TELEPiiONE (334) 899-5156, ext.3640 i

R M l E E S T A T Y Y S  !! SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENr ACrlON TO l

NO. DATE (1) (IIOURS) (2) (3) LER # ME CODE ($) PREVENT RECURRENCE l There were no Shutdowns or power reductions during the month.

l i

l 1

l l

l i

1; 2: 3: EVENTS REPORTED

. F: Forced Reason Method INVOLVE A S: Scheduled A - Equipment Failure (Explain) 1 - Manual GREATER TIIAN 20%

B - Maintenance or Test 2 - Manual Scram REDUCTION IN C Refueling 3 Automatic Scram AVERAGE DAILY D - Regulatory Restriction 4 -Other (Explain) POWER LEVEL FOR E - Operstor Training & License Examination TIIE PRECEDING 24 F Administrative IIOURS, O Operational Error (Explain)

II- Other(Explain)

. 7 ..

i -

a

. Joseph M. Farley Nuclear Plant 1

Unit 2

! Narrative Summary ofOperations i February 1997 2

. At 2145 on January 31,1997 with the unit operating in mode 1 at 100% reactor j power, the unit was ramped down to 15% reactor power to perform a chemistry

. flush of the steam generators.

Flushing was completed and the unit was returned to 100% reactor power at 0615 on February 3,1997.

There was no major safety related maintenance performed during the month.

1

-t K

1 4

i z

I

l I

. OPERATING DATA REPORT DOCKET NO. 50-364 ,

DATE March 6,1997 COMPLETED BY M. W. McAnuity )

TELEPIIONE (334) 899-5156, ext.3640 l

l I

OPERATING STATUS 1

1. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: February 1997 1) Cumulative data since 07-30-81, j
3. Licensed Thermal Power (MWt): 2,652 date ofcommercial operation. I
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Smce Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 672.0 1,416.0 136,633.0
12. Number Of Hours Reactor Was Critical 672.0 1,416.0 117,533.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-line 672.0 1,416.0 115,786.9  ;
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,688,501.9 3,661,430.8 295,109,525.0 l
17. Gross Electrical Energy Generated (MWH) 560,3391 1,218,630.0 96,732,928.0
18. Net Electrical Energy Generated (MWH) 533,027.0 1,161,054.0 91,711,510.0
19. Unit Service Factor 100.0 100.0_ 84.7
20. Unit Availability Factor 100.0 100.0 84.7 ,
21. Unit Capacity Factor (Using MDC Net) 96.5 99.8 81.8 l
22. Unit Capacity Factor (Using DER Net) 95.7 98.9 81.0 l
23. Unit Forced Outage Rate 0.0 0.0 3.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each) l
25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A ,
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 Commercial Operation 08/01/81 07/30/81

DOCKET NO. 50-364 UNIT 2 DATE March 6,1997  :

COMPLETED BY M. W. McAnulty TELEPHONE (334) 899-5156 ext 3640 MONTH February '

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I (MWe-Net) (MWe-Net) 1 201 17 846 2 169 18 843 3 783 19 838 4 839 20 832 5 843 21 831

)

6 848 22 841 I 7 845 23 847 8 844 24 845 9 847 25 845 10 847 26 839 11 848 27 832 12 847 28 828 13 844 29 N/A 14 846 30 N/A 15 846 31 N/A 16 847 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

,. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364

, . UNIT NAME J. M. Farley - Unit 2 I DATE March 6,1997 1

COMPLETED BY M. W. McAnulty l REPORT MONT11 February _ TELEPilONE (334) 899-5156, ext.3640 R M '

E E S T A T Y Y S 11 SC P O O TO CAUSE AND CORRECTIVE E DURATION N D ED COMPONENT ACrlON TO NO. DATE (1) (llOURS) (2) (3) LER # ME CODE (5) PREVENT RECURRENCE 001 97U2UI s 0 B 4 N/A AB SG At 2145 on 970131, with the unit operating in mode 1 at 100% reactor power, the unit was ramped down to 15% reactor power i to perform a chemistry flush of the Steam l Generators.

Chemistry flush was completed and the unit was retumed to 100% reactor power at 0615 on 970203.

1 1: 2: 3: EVENTS REPORTED F: Forced Reason Method INVOLVE A S: Scheduled A Equipment Failure (Explain) 1 Manual GREATER TilAN 20%

B - Maintenance or Test 2. Manual Scram REDUCrlON IN C Refueling 3. Automatic Scram AVERAGE DAILY D Regulatory Restriction 4.Other (Explain) POWER LEVEL FOR E Operator Training & License Examination Tile PRECEDING 24 F- Administrative IIOURs.

G . Operational Error (Explain)

II Other(Explain)