MONTHYEARIR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. 2024-08-09
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903042005-04-0808 April 2005 March 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0508903502005-03-11011 March 2005 February 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0505302232005-02-0909 February 2005 January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant ML0501902012005-01-0707 January 2005 December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant ML0436303412004-12-10010 December 2004 November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0432203622004-11-10010 November 2004 October 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0428804842004-10-0808 October 2004 September 2004 Monthly Report for R E Ginna Nuclear Power Plant ML0426600732004-09-10010 September 2004 August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0423105522004-08-10010 August 2004 July 2004 Monthly Operating Report for R E Ginna ML0420803112004-07-0909 July 2004 June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0417406162004-06-10010 June 2004 May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0413404292004-05-10010 May 2004 April 2004 Monthly Operating Report, R. E. Ginna Nuclear Power Plant ML0411305012004-04-0909 April 2004 March 2004 Monthly Operating Report for Ginna Nuclear Power Plant ML0407607272004-03-0909 March 2004 February 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0404905182004-02-0909 February 2004 January 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0402104802004-01-0909 January 2004 December 2003 Monthly Operating Report for R E Ginna Nuclear Power Plant ML0335002382003-12-0909 December 2003 November 2003 Monthly Operating Report for R.E. Ginna ML0332400652003-11-10010 November 2003 October 2003 Monthly Report for R. E. Ginna Nuclear Power Plant ML0328804542003-10-0909 October 2003 September 2003 Monthly Operating Report for R. E. Ginna ML0326610622003-09-10010 September 2003 August 2003 Monthly Operating Report Ginna Nuclear Power Plant ML0322704182003-08-0707 August 2003 July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0319804382003-07-10010 July 2003 June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0316812672003-06-10010 June 2003 May 2003 Monthly Operating Report for R.E. Ginna ML0314006772003-05-0909 May 2003 April 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0314005802003-05-0909 May 2003 September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0310704452003-04-10010 April 2003 March 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0307704542003-03-10010 March 2003 February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0305202172003-02-10010 February 2003 January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0301706072003-01-10010 January 2003 December 2002 Monthly Operating Report for R. E. Ginna ML0235205042002-12-0909 December 2002 November 2002 Monthly Operating Report for R.E. Ginna ML0231900622002-11-0808 November 2002 October 2002 Monthly Operating Report for R.E. Ginna ML0229000102002-10-0909 October 2002 September 2002 Monthly Operating Report for R.E. Ginna ML0226006432002-09-10010 September 2002 August 2002 Monthly Operating Report for R. E. Ginna ML0223102702002-08-0707 August 2002 July 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0221203692002-07-12012 July 2002 June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0217101442002-06-10010 June 2002 May 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant, Revision ML0215004232002-05-17017 May 2002 April 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0214204182002-05-0606 May 2002 April 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0210904432002-04-10010 April 2002 March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0208604272002-03-0808 March 2002 February 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0205802142002-02-11011 February 2002 January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0203504532002-01-10010 January 2002 December 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML18142B3881976-02-0909 February 1976 R. E. Ginna - Forwards Revised (Item #6) Operating Data Report for Month of January 1976 ML18142B3891976-02-0606 February 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976 ML18142B3901976-01-0808 January 1976 R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975 ML18142B3911976-01-0808 January 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975 ML18142B3921975-12-0404 December 1975 R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975 ML18142B3931975-11-0606 November 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975 ML18142B3941975-10-0202 October 1975 R. E. Ginna - Forwards Operating Status Information for Month of September 1975 ML18142B3951975-09-0505 September 1975 R. E. Ginna - Forwards Operating Status Information for Month of August 1975 2005-04-08
[Table view] |
Text
s MONTHLY REPOI (POR GRAY BOOK PREPARATION)
NRC DISTRIBUTION FOR PART 50 DOCKET'ATERIAL (TEMPO RA R Y FO R M)CONTROL NO: '54 FILE MONTHLY REPORT FILE , FROM.Rochester Gas&Elec, Co Rochester, N.Y.14649 Cha'ries E.Platt PDATE OF DOC 1<<8-76 DATE R EC'D LTR TWX 1-12>>76 RPT OTHER TO: NRC CLASS UNCLASS PROP INFO.D ESC R I PTI ON: ORIG 1 si ned INPUT CC OTHER 9 NO CYS REC'D 10 ENCLOSURES:
SENT LOCAL PDR DOCKET NO: 50-244 XX Ltr t:rans the following:
Monthly Repor t for Dec.1975 Plant&Component Operability
&Availability This Report to be used in preparing Gray Book by Plans&Operations.
NUMBER OF COPIES REC'D: 10 PLANT NAME: R.E.Ginna Pla'nt s FOR ACTION/INFORMATION DHL 1-13-76 BUTLER (L)W/Copies CLARK (L)W/Copies PARR (L)W/Copies KNIEL (L)W/Co'pies SCHWENCER (L)W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies~PURPLE (L)W/copies ZIEMANN (L)REGAN (E)W/Copies W/Copies DICKER (E)LEAR (L)W/Copies W/Copies KNIGHTON (E),SPE LS W/Copies W/Copies YOUNGBLOOD (E)~MIPC/PE W/Copies W,4 Copies INTERNAL DISTRIBUTION EG Fl OGC, ROOM P-506A.GOSSI CK/STAFF CASE GIAMBUSSO BOYD MOORE (L)DEYOUNG (L)SKOVHOLT (L)GOLLER (L)(Ltr)P.COLLINS DENISE REG OPR Fl I.E 5 REGION (2)STEELE TECH REVIEW SCHROEDER MACCARY KNIGHT PAW LI CK I SHAO STELLO HOUSTON ,NOVA K ROSS IPPOLITO TED ESCO J.COLLINS LAINAS BENAROYA VOLLMER DENTON G R IMES GAMMI LL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIG HTON YOUNG B LOOD REGAN PROJECT LDR HAR LESS LIC ASST R.DI GGS (L)H.GEAR IN (L)E.GOULBOURNE (L)P.KREUTZER (E)J.LEE (L)M.RUBH3ROOK (L)S.REED (E)M.SERVICE (L)g.SHEPPARD (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)V: WILSON (L)R.INGRAM (L)M DUNCA E A/T IND~BRAITMAN SALTZMAN MiE LTZ PLANS<<MCDONALD<<CHAPMAN DUBE (Ltr)E.COUPE PETERSON HARTFIELD (2)KLECKER E ISENHUT WIGGINTON EXTERNAL DISTRIBUTION
~1-LPPAL PPH~Locs N Y--Ro.ch.ester, N.Y.~1-TIC (ABERNATHY)
(1)(2)('10)
-NATIONAL LABS~1-NSIC (BUCHANAN) 1-W.PENNINGTON, Rrn E-201 GT 1-ASLB 1-CONSULTANTS 1-Newton Anderson NEWMAR K/8 LUME/AG BAB I AN-ACRS HOLDING/SENT 1-PD R-SAN/LA/N Y 1-BROOKHAVEN NAT LAB 1-G.ULRIKSON, ORNL 1-AGMED (RUTH GUSSMAN)Rm B-127 GT 1-J~D.RUNKLES, Rm E-201 GT s 4~~~
0 AHD regulatory Docket Elle I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 Ag cy~4NS'Z.mug
@q'ELEPHONE AREA cooE TIE 546-2700 Ginna Station January 8, 1976 Director, Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 8Jy~~Pjp
Subject:
Monthly Report for December, 1975 Operating Status Information R.E.Ginna Nuclear Power Plant Unit'No.Docket No.50-244 Gentlemen:
Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna Station for the month of December, 1975.Also, ten additional copies of the attachment are enclosed.Very truly yours, C zP Charles E.Platt Superintendent CEP:fah Attachments cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2)
J r.
A4 OPERATING DATA REPORT~6(egu1atory Docket File DOCKET NO.50 2~4 OPERATING STATUS g3g4NX%'~.;..
UNIT Pl Ginna Station DATE January 6, 1976 COMPLETED RY~Andgev E.MCNamara, perat ons~TELEPHONE Ext.291-214, At Ginna 1.REPORTING PERIOD: GROSS HOURS IN REPORTING PERIODE 744 1520 3.POWER LEVEL To WHICH RESTRICTED (IF AHY)(MWe&et): 4, REASONS FOR RESTRICTION (IF ANY): THIS MONTH YR TO DATE CUMULATIVE'.
NUMBER OF HOURS REACTOR WAS CRITICAL.......'..
~..,, 700.28 6 850.24 41,168.70 6~REACTOR RESERVE SHUTDOWN HOURS.7.HOURS GENERATOR OH LINE.~0 700.25 292.13 292.13*6 710.5 39,912.63 8.UNIT RESERVE SHUTDOWN HOURS 0 8.5 8.5*9.GROSS THERMAL RHERGY GEHERATED IMWH)........,.....1~036 2 6 10.GROSS ELECTRICAL ENERGY GENERATED (MWH)11.HET ELECTRICAL ENERGY GEHERATED (MWH)....28,548 0 12.REACTOR SERVICE FACTOR...~...13.REACTOR AYAII.ABILITY FACTOR........~.~14.UNIT SERVICE FACTOR.94.12%94.1%1$.UNIT AVAILABILITY FACTOR~.~~.~~~~~~7~~~~~~~~~~~~~~~16.UNIT CAPACITY FACTOR (Uelne MDC)A~..~~~~~~~~~A~1~3~9~17 UNIT CAPACITY FACTOR (UEIn0 DeeIgn MWe)~~~~~~~~~~~~p~18.UNIT FORCED OUTAGE RATE 9 706 555 3,199,043 50 370,874 16,805,861 78.19%81.53%76.6%76.7%73.9%76.45%77.0%74.68%74.69%67.32%67.32%8.9%3,041,203 15,892,3)5 19.SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH);'0.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE January 7, 1976 21.UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*Cumulative data commencing January 1, 1975.40 88 RRVA 10/75 l t wo lt 4 AVERAGE DAILY UNIT POWER LEVEL.DOCKET NO..50 244 UNIT III@irma Station Ja ua.1 76 COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE Rxt.291-214, At Ginna MON TH December, 1975 DAY AVERAGE DAILY POWER LEVEL (M We-N et)DAY.AVERAGE DAILY POWER LEVEL (MWe-Net)10 12 13 14 15 16 482 481 480 480 481 480 479 480 434 479 11 18 20 21 22 23 24 25 26 21 28 2$30 31 480 480 480 479 370 477 351 479 480 482 482 482 475 55 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day iri the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month..Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may,',be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.4 k s I i N~
DOCKET NO.50-244 The reactor power levels averaged 99%during the period.The major exceptions were the power reduc-tions and Outage II14 detailed below.REpoRT MQNTH December 1 75 UNIT NAME GINNA STATI ONE UNIT 01 DATE January 6, 1976 COMPLETED BY~~'ndrew E.McNamara, Operations Ai e TELEPH0NE 1-716-546-2700 Ext.291-214, at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS
/AA DATE P 75 12 13 TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COMMENTS Reactor power level reduction to~47%to perform T-18B, Turbine Main Steam Stop Valves Test.N/AA 75 12 21 Reactor power level reduction to m47%to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon./AA 75 12 23 Reactor power level reduction to~47%to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon.14 75 12 30 43.75 (See Note)A"B" Steam Generator-Tube Leak NOTE: Uni.t remained shutdown through the end of report month.(I)REASON: A-EQUIPMENT FAILURE (EXPLAIN)8-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)(2)METHOD: I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM 4-OTHER (EXPLAIN)*Power reductions were not previously reported.DataaaMt>aw~ilabM.89 Commencing January 1, 1976, this data will be reported.
'a t'l r!4