ML18142B391

From kanterella
Revision as of 18:31, 11 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975
ML18142B391
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/08/1976
From: Platt C E
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B391 (10)


Text

s MONTHLY REPOI (POR GRAY BOOK PREPARATION)

NRC DISTRIBUTION FOR PART 50 DOCKET'ATERIAL (TEMPO RA R Y FO R M)CONTROL NO: '54 FILE MONTHLY REPORT FILE , FROM.Rochester Gas&Elec, Co Rochester, N.Y.14649 Cha'ries E.Platt PDATE OF DOC 1<<8-76 DATE R EC'D LTR TWX 1-12>>76 RPT OTHER TO: NRC CLASS UNCLASS PROP INFO.D ESC R I PTI ON: ORIG 1 si ned INPUT CC OTHER 9 NO CYS REC'D 10 ENCLOSURES:

SENT LOCAL PDR DOCKET NO: 50-244 XX Ltr t:rans the following:

Monthly Repor t for Dec.1975 Plant&Component Operability

&Availability This Report to be used in preparing Gray Book by Plans&Operations.

NUMBER OF COPIES REC'D: 10 PLANT NAME: R.E.Ginna Pla'nt s FOR ACTION/INFORMATION DHL 1-13-76 BUTLER (L)W/Copies CLARK (L)W/Copies PARR (L)W/Copies KNIEL (L)W/Co'pies SCHWENCER (L)W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies~PURPLE (L)W/copies ZIEMANN (L)REGAN (E)W/Copies W/Copies DICKER (E)LEAR (L)W/Copies W/Copies KNIGHTON (E),SPE LS W/Copies W/Copies YOUNGBLOOD (E)~MIPC/PE W/Copies W,4 Copies INTERNAL DISTRIBUTION EG Fl OGC, ROOM P-506A.GOSSI CK/STAFF CASE GIAMBUSSO BOYD MOORE (L)DEYOUNG (L)SKOVHOLT (L)GOLLER (L)(Ltr)P.COLLINS DENISE REG OPR Fl I.E 5 REGION (2)STEELE TECH REVIEW SCHROEDER MACCARY KNIGHT PAW LI CK I SHAO STELLO HOUSTON ,NOVA K ROSS IPPOLITO TED ESCO J.COLLINS LAINAS BENAROYA VOLLMER DENTON G R IMES GAMMI LL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIG HTON YOUNG B LOOD REGAN PROJECT LDR HAR LESS LIC ASST R.DI GGS (L)H.GEAR IN (L)E.GOULBOURNE (L)P.KREUTZER (E)J.LEE (L)M.RUBH3ROOK (L)S.REED (E)M.SERVICE (L)g.SHEPPARD (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)V: WILSON (L)R.INGRAM (L)M DUNCA E A/T IND~BRAITMAN SALTZMAN MiE LTZ PLANS<<MCDONALD<<CHAPMAN DUBE (Ltr)E.COUPE PETERSON HARTFIELD (2)KLECKER E ISENHUT WIGGINTON EXTERNAL DISTRIBUTION

~1-LPPAL PPH~Locs N Y--Ro.ch.ester, N.Y.~1-TIC (ABERNATHY)

(1)(2)('10)

-NATIONAL LABS~1-NSIC (BUCHANAN) 1-W.PENNINGTON, Rrn E-201 GT 1-ASLB 1-CONSULTANTS 1-Newton Anderson NEWMAR K/8 LUME/AG BAB I AN-ACRS HOLDING/SENT 1-PD R-SAN/LA/N Y 1-BROOKHAVEN NAT LAB 1-G.ULRIKSON, ORNL 1-AGMED (RUTH GUSSMAN)Rm B-127 GT 1-J~D.RUNKLES, Rm E-201 GT s 4~~~

0 AHD regulatory Docket Elle I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 Ag cy~4NS'Z.mug

@q'ELEPHONE AREA cooE TIE 546-2700 Ginna Station January 8, 1976 Director, Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 8Jy~~Pjp

Subject:

Monthly Report for December, 1975 Operating Status Information R.E.Ginna Nuclear Power Plant Unit'No.Docket No.50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna Station for the month of December, 1975.Also, ten additional copies of the attachment are enclosed.Very truly yours, C zP Charles E.Platt Superintendent CEP:fah Attachments cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2)

J r.

A4 OPERATING DATA REPORT~6(egu1atory Docket File DOCKET NO.50 2~4 OPERATING STATUS g3g4NX%'~.;..

UNIT Pl Ginna Station DATE January 6, 1976 COMPLETED RY~Andgev E.MCNamara, perat ons~TELEPHONE Ext.291-214, At Ginna 1.REPORTING PERIOD: GROSS HOURS IN REPORTING PERIODE 744 1520 3.POWER LEVEL To WHICH RESTRICTED (IF AHY)(MWe&et): 4, REASONS FOR RESTRICTION (IF ANY): THIS MONTH YR TO DATE CUMULATIVE'.

NUMBER OF HOURS REACTOR WAS CRITICAL.......'..

~..,, 700.28 6 850.24 41,168.70 6~REACTOR RESERVE SHUTDOWN HOURS.7.HOURS GENERATOR OH LINE.~0 700.25 292.13 292.13*6 710.5 39,912.63 8.UNIT RESERVE SHUTDOWN HOURS 0 8.5 8.5*9.GROSS THERMAL RHERGY GEHERATED IMWH)........,.....1~036 2 6 10.GROSS ELECTRICAL ENERGY GENERATED (MWH)11.HET ELECTRICAL ENERGY GEHERATED (MWH)....28,548 0 12.REACTOR SERVICE FACTOR...~...13.REACTOR AYAII.ABILITY FACTOR........~.~14.UNIT SERVICE FACTOR.94.12%94.1%1$.UNIT AVAILABILITY FACTOR~.~~.~~~~~~7~~~~~~~~~~~~~~~16.UNIT CAPACITY FACTOR (Uelne MDC)A~..~~~~~~~~~A~1~3~9~17 UNIT CAPACITY FACTOR (UEIn0 DeeIgn MWe)~~~~~~~~~~~~p~18.UNIT FORCED OUTAGE RATE 9 706 555 3,199,043 50 370,874 16,805,861 78.19%81.53%76.6%76.7%73.9%76.45%77.0%74.68%74.69%67.32%67.32%8.9%3,041,203 15,892,3)5 19.SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH);'0.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE January 7, 1976 21.UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*Cumulative data commencing January 1, 1975.40 88 RRVA 10/75 l t wo lt 4 AVERAGE DAILY UNIT POWER LEVEL.DOCKET NO..50 244 UNIT III@irma Station Ja ua.1 76 COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE Rxt.291-214, At Ginna MON TH December, 1975 DAY AVERAGE DAILY POWER LEVEL (M We-N et)DAY.AVERAGE DAILY POWER LEVEL (MWe-Net)10 12 13 14 15 16 482 481 480 480 481 480 479 480 434 479 11 18 20 21 22 23 24 25 26 21 28 2$30 31 480 480 480 479 370 477 351 479 480 482 482 482 475 55 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day iri the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month..Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may,',be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.4 k s I i N~

DOCKET NO.50-244 The reactor power levels averaged 99%during the period.The major exceptions were the power reduc-tions and Outage II14 detailed below.REpoRT MQNTH December 1 75 UNIT NAME GINNA STATI ONE UNIT 01 DATE January 6, 1976 COMPLETED BY~~'ndrew E.McNamara, Operations Ai e TELEPH0NE 1-716-546-2700 Ext.291-214, at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS

/AA DATE P 75 12 13 TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COMMENTS Reactor power level reduction to~47%to perform T-18B, Turbine Main Steam Stop Valves Test.N/AA 75 12 21 Reactor power level reduction to m47%to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon./AA 75 12 23 Reactor power level reduction to~47%to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon.14 75 12 30 43.75 (See Note)A"B" Steam Generator-Tube Leak NOTE: Uni.t remained shutdown through the end of report month.(I)REASON: A-EQUIPMENT FAILURE (EXPLAIN)8-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)(2)METHOD: I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM 4-OTHER (EXPLAIN)*Power reductions were not previously reported.DataaaMt>aw~ilabM.89 Commencing January 1, 1976, this data will be reported.

'a t'l r!4