ML20154K919

From kanterella
Revision as of 21:20, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Rev 12 to Plant Industrial Security Plan,As Transmitted by Util 871102 & 880408 Ltrs,Consistent W/ Provisions of 10CFR50.54(p) & Acceptable
ML20154K919
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/20/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8805310089
Download: ML20154K919 (2)


Text

' '

MAY 2 01988 In Reply Refer To:

Dockets: 50-313 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

This is to acknowledge receipt of your letters dated November 2,1987, and April 8, 1988, which transmitted changes identified as Revision 12 to the Arkansas Nuclear One, Units 1 and 2, Industrial Security Plan under provisions l of 10 CFR 50.54(p).

We have reviewed the submitted changes as transmitted in your November 2, 1987, letter and the removal of Section 3.1.2.1 from Revision 12 as transmitted in your April 8, 1988, letter. We have determined that with the removal of the l change to Section 3.1.2.1 from Revision 12 that the submitted changes are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable. '

The enclosures to your letter of November 2, 1987, contain Safeguards l Informatica of a type specified in 10 CFR 73.21 and are being withheld from public disclosure. 2 Sincerely, 1

Original Signed By A. B. Beach L. J. Callan, Director Division of Reactor Projects CC:

Arkansas Nuclear One

. ATTN: J. M. Levine, Director Site Nuclear Operations P.O. Box 608 Russellville, Arkansas 72801 I l

Arkansas Radiation Control Program Director bec: (see next page) e j)0 RIV:RPSB C:PS C:RPSB DRP/A D:D Casework Nos:

RCaldwell RJEv t JMurray 0 Chamberlain LJC lan 50/313/07-XA h//88 6/h/88 t /, /88 y//T/88 $ M /88 50-368/06-XA 88053100098$00h013 \

DR ADOCK O PM D

< b Arkansas Power & Light Co. bec w/o letter dated 11/2/87 and 4/8/88:

DMB (RG01) bec distributed by RIV w/ letter from licensee:

R. D. Martin, RA DRP R. L. Bangart, DRSS Branch Chief, RPSB Security Inspector Section. Chief, PSS:RPSB Section Chief DRP/A Resident Inspector P. A. Starcher, RSGB/NRR RITS Coordinator 50.54(p) Book PSS:RPSB Security File Physical Security File RPSB RIV File R. E. Hall, DRSS Project Engineer, DRP/A DRS MIS G. Dick, NRR Project Manager i

l l

l 1

l

i ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. AAKANSAS 72203 [501) 377 4000 November 2, 1987 9 r rS~~ ' '

N(W 5 08i 0CAN118703 -~

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

SUBJECT:

Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Revision 12 to the ANO Industrial Security Plan k ntlemen:

In accordance with 10 CFR 50.54(p), attiched is the original plus three copies (copy Nos. 1-4) of Revision 12 to the Arkansas Nuclear One Industrial Security Plan. A brief description of the changes made in this revision and the revised pages to the plan are attached. It was determined by Arkansas Power & Light Company that these changes do not decrease the safeguards i effectiveness of the plan and, therefore, were made without prior NRC approval.

(

The attachment contains Safeguards Information of the type specified in l 10CFR73.21 and, therefore, should be withheld from public disclosure. '

Very truly yours, i

. Ted Enos, Manager j Nuclear Engineering and Licensing )

1 JTE:SAB:mb Attachments:

Safeguards Information Copy Nos.1 Document Control Desk Copy Nos. 5 Mr. Robert D. Martin ENCL'Osb;R5[CMA'IM -

cc: Mr. Robert D. Martin SAFEGDARDS IOfQRMA 10N' ' '

UPON siEM#kn0KTJ "

PAGE IV DMUNTkON i

, f = =

-/0v f '

MEMBRA M'OOLE sov7M utilities system j

.,-% o

?? }@Q&$

8

~

'Ui II l APR 141988 ARKANSAS POWER & LIGHT COMPANY . - -

POST OFFICE BOX 551 LITTLE ROCK AAKANSAS 72203 [501) 377-49nn April 8, 1988 OCAN048807 U. S. Nuclear Regulatory Commission )

Region IV l 611 Ryan Plaza Drive  ;

Suite 1000 Arlington, TX 76011 1 1

ATTN: Mr. Larry A. Yandell, Chief Radiological Protection and Safeguards Branch

SUBJECT:

Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Revision 12 to the AN0 Industrial Security Plan

Dear Mr. Yandell:

1 Our letter of November 2, 1987 (0CAN118703) submitted Revision 12 to the ANO j Industrial Security Plan. Included in that revision were changes to Section i 3.1.2.1 to correct the inadvertent inclusion of changes proposed by Arkansas l Power & Light Company (AP&L) to address the Miscellaneous Amendment  !

revisions to 10CFR50 and 73 published in the August 4, 1986 Federal  !

Register. As these changes have now been submitted under 10CFR50.90 in I AP&L's letters of December 2, 1986 (0CAN128603) and February 24, 1988 )

(OCAN028803) it is no longer necessary that our Revision 12 changes to Section 3.1.2.1 be processed per 10CFR50.54(p). This information has been discussed with Ron Caldwell of your staff.

Very truly yours, lsy Dan R. Howard Manager, Licensing DRH/DEJ/de l

G im t n i! m - -_ L ,

, y r~ 'j -

Jd l 4 MEMBE A MOOLE Soutw Utilities system

_ _ _ _ . _ _ _ _ . _ _ _ . _ _