{{#Wiki_filter:
{{#Wiki_filter:r            -        -
      .'                *
  .
                                        *
            In Reply Refer To:                  JUL 25 96
            Dockets: 50-313/86-17
                          50-368/86-18
            Arkansas Power & Light Company
            ATTN: Mr. Gene Campbell
                      Vice President, Nuclear
                        Operations
            P. O. Box 551
            Lii.i.le Rock, Arkansas 72200
            Gentlemen:
            This refers to the inspection conducted by Mr. J. 'R. Boardman of this office
    '
            and three consultants during the period May 19-23, 1986, of activities
            authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
            Units 1 and 2, and to the discussion of our findings with Mr. J. M.. Levine, and
            other members of your staff at the conclusion of the inspection.
            Areas examined during the inspection included the licensee maintenance program,
            maintenance program implementation, electrical maintenance and instrumentation
            maintenance.
            Within these areas, the inspection consisted of selective examination of
            procedures and representative records, interviews with personnel, and
            observations by the inspectors. The inspection findings are documented in the
            enclosed inspection report.
            During this inspection, it was found that certain of your activities were in
            violation of NRC requirements. Consequently, you are required to respond to
            this violation, in writing, in accordance with the provisions of Section 2.201
            of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
            Regulations. Your response should be based on the specifics contained in the
            Notice of Violation enclosed with this letter.
            We are concerned by the generic implications of the problem identified in the
            attached Notice of Violation. Your response to the Notice of Violation should
            specifically address action that has been taken or is planned to assure that,
            for all safety-related equipment, the preventative maintenance activities
            recommended by the applicable vendor is incorporated in the preventative
            maintenance program and associated procedure, or an engineering evaluation has
            been prepared to justify not including the specific vendor recommendations in
            the program.
            The response directed by this letter and the accompanying Notice is not subject
            to the clearance procedures of the Office of Management and Budget as required
            W the Paperwork Reduction Act of 1980, PL 96-511.
            RIV:05              C:0Sh        C:RA '        C:RSB          C:RPB2
            JRBoarcma      :lc DMHunnicutt  DRHunt r      TFWesterman    JEGagl
            1 W /86            1 W /86    M /d /86        1 /4 /86      W4              r
    - 8607310064 860725 3
        DR    ADOCK 0500
                                                                                        hoi
                                                          1
 
          - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
,
    . . .
  O
          Arkansas Power & Light                                      -2-
          Should you have any questions concerning this inspection, we will be pleased to
          discuss them with you.
                                                                      Sincerely,
                                                                            0:O.at 3&as zy
                                                                      J. E. Gagliardo. Chief
                                                                      Reactor Projects Branch
            Enclosures:
            1.        Appendix A - Notice of Violation
            2.        Appendix B - NRC Inspection Report
                            50-313/86-17
                            50-368/86-18
            cc w/ enclosures:
            J. M. Levine, Director
                Site Nuclear Operations
            Arkansas Nuclear One
            P. O. Box 608
            Russellville, Arkansas 72801
            Arkansas Radiation Control Program Director
            bec to DMB (IE01)
            bec distrib. by RIV:
            *RPB                                  * Resident Inspector            R. D. Martin, RA
            *R&SPB                                *Section Chief (RPB/B)        *D. Weiss, LFitB (AR-2015)
            *RIV File                              DRSP                          *RSB.
            * MIS SYSTEM                          *RSTS Operator                *J. R. Boardman
            *w/766~
}}
}}

Latest revision as of 20:55, 31 December 2020

Forwards Insp Repts 50-313/86-17 & 50-368/86-18 on 860519-23 & Notice of Violation.Response Should Address Actions Taken to Assure That Preventative Maint Activities Recommended by Vendor Incorporated Into Maint Program
ML20203F418
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/25/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20203F425 List:
References
NUDOCS 8607310064
Download: ML20203F418 (2)


See also: IR 05000313/1986017

Text

r - -

.' *

.

In Reply Refer To: JUL 25 96

Dockets: 50-313/86-17

50-368/86-18

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P. O. Box 551

Lii.i.le Rock, Arkansas 72200

Gentlemen:

This refers to the inspection conducted by Mr. J. 'R. Boardman of this office

'

and three consultants during the period May 19-23, 1986, of activities

authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

Units 1 and 2, and to the discussion of our findings with Mr. J. M.. Levine, and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included the licensee maintenance program,

maintenance program implementation, electrical maintenance and instrumentation

maintenance.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspectors. The inspection findings are documented in the

enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We are concerned by the generic implications of the problem identified in the

attached Notice of Violation. Your response to the Notice of Violation should

specifically address action that has been taken or is planned to assure that,

for all safety-related equipment, the preventative maintenance activities

recommended by the applicable vendor is incorporated in the preventative

maintenance program and associated procedure, or an engineering evaluation has

been prepared to justify not including the specific vendor recommendations in

the program.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

W the Paperwork Reduction Act of 1980, PL 96-511.

RIV:05 C:0Sh C:RA ' C:RSB C:RPB2

JRBoarcma :lc DMHunnicutt DRHunt r TFWesterman JEGagl

1 W /86 1 W /86 M /d /86 1 /4 /86 W4 r

- 8607310064 860725 3

DR ADOCK 0500

hoi

1

- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

,

. . .

O

Arkansas Power & Light -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

0:O.at 3&as zy

J. E. Gagliardo. Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-313/86-17

50-368/86-18

cc w/ enclosures:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB * Resident Inspector R. D. Martin, RA
  • R&SPB *Section Chief (RPB/B) *D. Weiss, LFitB (AR-2015)
  • RIV File DRSP *RSB.
  • MIS SYSTEM *RSTS Operator *J. R. Boardman
  • w/766~