r
-
-
.'
.
In Reply Refer To:
JUL 25 96
Dockets: 50-313/86-17
50-368/86-18
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P. O. Box 551
Lii.i.le Rock, Arkansas 72200
Gentlemen:
This refers to the inspection conducted by Mr. J. 'R. Boardman of this office
and three consultants during the period May 19-23, 1986, of activities
'
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. J. M.. Levine, and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included the licensee maintenance program,
maintenance program implementation, electrical maintenance and instrumentation
maintenance.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors. The inspection findings are documented in the
enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We are concerned by the generic implications of the problem identified in the
attached Notice of Violation. Your response to the Notice of Violation should
specifically address action that has been taken or is planned to assure that,
for all safety-related equipment, the preventative maintenance activities
recommended by the applicable vendor is incorporated in the preventative
maintenance program and associated procedure, or an engineering evaluation has
been prepared to justify not including the specific vendor recommendations in
the program.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
W the Paperwork Reduction Act of 1980, PL 96-511.
C:0Sh
C:RA '
C:RSB
C:RPB2
RIV:05
JRBoarcma :lc DMHunnicutt
DRHunt r
TFWesterman
JEGagl
1 W /86
1 W /86
M /d /86
1 /4 /86
W4
r
- 8607310064 860725
hoi
DR
ADOCK 0500
3
1
,
. . .
- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
O
Arkansas Power & Light
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
0:O.at 3&as zy
J. E. Gagliardo. Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/86-17
50-368/86-18
cc w/ enclosures:
J. M. Levine, Director
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- D. Weiss, LFitB (AR-2015)
- RIV File
DRSP
- RSB.
- MIS SYSTEM
- RSTS Operator
- J. R. Boardman