ML20141C864: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20141C864
| number = ML20141C864
| issue date = 04/02/1986
| issue date = 04/02/1986
| title = Advises That Review of Records Indicates No Response from Region IV to Util 841109 Response to NRC 841011 Ltr & Notice of Violation,Per Insp Rept 50-445/84-22.Corrective Actions Will Be Inspected as Part of IE Bulletin 79-14 Followup
| title = Advises That Review of Records Indicates No Response from Region IV to Util 841109 Response to NRC & Notice of Violation,Per Insp Rept 50-445/84-22.Corrective Actions Will Be Inspected as Part of IE Bulletin 79-14 Followup
| author name = Johnson E
| author name = Johnson E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)

Latest revision as of 13:55, 12 December 2021

Advises That Review of Records Indicates No Response from Region IV to Util 841109 Response to NRC & Notice of Violation,Per Insp Rept 50-445/84-22.Corrective Actions Will Be Inspected as Part of IE Bulletin 79-14 Followup
ML20141C864
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/02/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20141C868 List:
References
IEB-79-14, NUDOCS 8604070331
Download: ML20141C864 (2)


See also: IR 05000445/1984022

Text

-

,

N,.

In Reply Refer To:

Docket: 50-445/84-22

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

A review of our records indicates that Region IV has not responded to your

letter of November 9,1984, which was in response to our October 11, 1984,

letter and Notice of Violation.

We have previously inspected your responses to Items A, B, and C and have no

further questions. In regard to Item D, we have no further question and will

inspect your corrective actions as a part of the IE Bulletin 79-14 followup.

Sincerely,

edgn31 stred ey

E. h. Mrtm

E. H. Johnson, Director

Division of Reactor Safety

and Projects

cc:

Texas Utilities Electric Company

ATTN: J. W. Beck, Vice President Licensing

Quality Assurance and Nuclear Fuels

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548

Austin, Texas 76711

Texas Radiation Control Program Director

RIV: CPG DRSP

TFWesterman:gb EHJohn

44 / / / 8 6 i/v/86

8604070331 860402

PDR

G

ADOCK 05000445

PM

[@[ l

j

l

l

_ ._

n- 2n-

'

.- .

DISTRIBUTION:

,

'bec to_DMB (IE01)

bec'distrib. by RIV:

  • RPB * MIS System
  • RRI-OPS *RSTS Operator
  • RRI-CONST *R&SPB-

-*T.~ F. Westerman, CPTG .DRSP  ;

V. Nconan, NRR R. Martin, RA *

S. Treby, ELD *RSB l

'

  • RIV File .1. Taylor IE
  • D. Weiss, LFMB (AR-2015) R. Heishman, IE
  • w/766

.

1

  • E

f

ap=