IR 05000295/1997002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20141D778
| number = ML20217G788
| issue date = 06/13/1997
| issue date = 10/06/1997
| title = Confirms Plans to Conduct Predecisional Enforcement Conference on 970703 in Lisle,Illinois to Discuss Apparent Violations Identified in NRC Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02
| author name = Grant G
| author name = Vegel A
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Mueller J
| addressee name = Brons J
| addressee affiliation = COMMONWEALTH EDISON CO.
| addressee affiliation = COMMONWEALTH EDISON CO.
| docket = 05000295, 05000304
| docket = 05000295, 05000304
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 50-295-97-02, 50-295-97-07, 50-295-97-2, 50-295-97-7, 50-304-97-02, 50-304-97-07, 50-304-97-2, 50-304-97-7, EA-97-222, EA-97-223, NUDOCS 9706270336
| document report number = 50-295-97-02, 50-295-97-2, 50-304-97-02, 50-304-97-2, NUDOCS 9710140220
| title reference date = 07-11-1997
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:IUIdCC.
 
<
Ic-o)
+
october 6, 1997 Mr. Acting Site Vme President Zion Station-Commonwealth Edison Company -
101 Shiloh Boulevard Zion,IL 60099
, SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50 295/97002(DRP);
l 50-304/97002(DRP))
 
==Dear Mr. Brons:==
l This will acknowledge receipt of your letter dated July 11,1997, in response to our letter l
; dated June 4,1997, transmitting a Notice of Violation associated with inspection Report Nos.
 
50-295/97002(DRP); 50 304/97002(DRP). We have reviewed your corrective actions and have  1 no further questions at this time. These corrective actions will be examined during future inspections.
 
Sincerely,
,
    /s/ T. Vegel Anthony Ve9el, Acting Chief Reactor Projects Branch 2 -
Docket Nos.- 50-295; 50-304
' SEE ATTACJiED DISTRIBUTj.Qil    !g DOCUMENT NAME: R:\LTRS2LIC\ CECO \ ZION \ZIO97002.TKU To receive a copy of this document, indicate in the box "C" = Copy without attach /enci"E" = Copy with attach /enci "N" = No copy OFFICE Rill 6 Rill M NAME Hills /co PT Ve9el h DATE 10/ C. /97 10/ 4 /97 OFFICIAL RECORD COPY 1400?8 9710140220 971006 ADOCK 050002 5 gDR
        !
  ~
 
- - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
      . .. . . .
i e- cc: - R. J. Manning, Executive Vice President, Generation M. Wallace, Senior Vice President, Corporate Services H. G. Stanley, Vice President PWR Operations Ualson Officer, NOC-BOD D. A. Sager, Vice President, Generation Support D. Farrar, Nuclear Regulatory Services Manager
'
l. Johnson, Ucensing Operations Manager Document Control Desk Ucensing R. Starkey, Plant General Manager R. Godley, Regulatory Assurance Supervisor Richard Hubbard l    Nathan Schloss, Economist Office of the Attomey General Mayor, City of Zion State Walson Officer
    - State Usison Officer, Wisconsin Chairman, Illinois Commerce
        .
Commission Distribution:
Docket File -  DRP OC/LFDCB  TSS PUBLIC IE-01  DRS A. Beach  R;ll PRR Deputy RA  Rlli Enf. Coord.
 
SRI Zion. Project Mgr., NRR
<
}}
}}

Latest revision as of 02:36, 18 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02
ML20217G788
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/06/1997
From: Anton Vegel
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brons J
COMMONWEALTH EDISON CO.
References
50-295-97-02, 50-295-97-2, 50-304-97-02, 50-304-97-2, NUDOCS 9710140220
Download: ML20217G788 (2)


Text

IUIdCC.

<

Ic-o)

+

october 6, 1997 Mr. Acting Site Vme President Zion Station-Commonwealth Edison Company -

101 Shiloh Boulevard Zion,IL 60099

, SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50 295/97002(DRP);

l 50-304/97002(DRP))

Dear Mr. Brons:

l This will acknowledge receipt of your letter dated July 11,1997, in response to our letter l

dated June 4,1997, transmitting a Notice of Violation associated with inspection Report Nos.

50-295/97002(DRP); 50 304/97002(DRP). We have reviewed your corrective actions and have 1 no further questions at this time. These corrective actions will be examined during future inspections.

Sincerely,

,

/s/ T. Vegel Anthony Ve9el, Acting Chief Reactor Projects Branch 2 -

Docket Nos.- 50-295; 50-304

' SEE ATTACJiED DISTRIBUTj.Qil !g DOCUMENT NAME: R:\LTRS2LIC\ CECO \ ZION \ZIO97002.TKU To receive a copy of this document, indicate in the box "C" = Copy without attach /enci"E" = Copy with attach /enci "N" = No copy OFFICE Rill 6 Rill M NAME Hills /co PT Ve9el h DATE 10/ C. /97 10/ 4 /97 OFFICIAL RECORD COPY 1400?8 9710140220 971006 ADOCK 050002 5 gDR

!

~

- - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. .. . . .

i e- cc: - R. J. Manning, Executive Vice President, Generation M. Wallace, Senior Vice President, Corporate Services H. G. Stanley, Vice President PWR Operations Ualson Officer, NOC-BOD D. A. Sager, Vice President, Generation Support D. Farrar, Nuclear Regulatory Services Manager

'

l. Johnson, Ucensing Operations Manager Document Control Desk Ucensing R. Starkey, Plant General Manager R. Godley, Regulatory Assurance Supervisor Richard Hubbard l Nathan Schloss, Economist Office of the Attomey General Mayor, City of Zion State Walson Officer

- State Usison Officer, Wisconsin Chairman, Illinois Commerce

.

Commission Distribution:

Docket File - DRP OC/LFDCB TSS PUBLIC IE-01 DRS A. Beach R;ll PRR Deputy RA Rlli Enf. Coord.

SRI Zion. Project Mgr., NRR

<