ML20235G731: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
| project =  
| project = TAC:65725
| stage = Approval
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:_ _ - _ _ _ _ _ _ _              _  _
{{#Wiki_filter:_ _ - _ _ _ _ _ _ _
1 Docket No.:           50-424 l
1 Docket No.:
Mr. James P. O'Reilly Senior Vice President - Nuclear Operations             SEP 2 21987 Georgia Power Company P. O. Box 4545                                                                                 i Atlanta, Georgia 30302
50-424 l
Mr. James P. O'Reilly SEP 2 21987 Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545 i
Atlanta, Georgia 30302


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
==Subject:==
==Subject:==
Staff Acceptance of the Inservice Testing Program, Revision 2                       l for Vogtle Unit 1 (TAC 65725)                                                       ;
Staff Acceptance of the Inservice Testing Program, Revision 2 l
I By. letter dated June 25, 1987, as amended by letter dated August 27, 1987, Georgia Power Company (GPC) submitted for NRC review and approval its pro-posed Revision 2 of the Inservice Testing (IST) Program for Vogtle Unit 1.
for Vogtle Unit 1 (TAC 65725)
I By. {{letter dated|date=June 25, 1987|text=letter dated June 25, 1987}}, as amended by {{letter dated|date=August 27, 1987|text=letter dated August 27, 1987}}, Georgia Power Company (GPC) submitted for NRC review and approval its pro-posed Revision 2 of the Inservice Testing (IST) Program for Vogtle Unit 1.
The revision includes cold shutdown valve testing justifications and addi-tional relief requests not included in the approved IST program addressed in Supplement 6 to the Vogtle Safety Evaluation Report.
The revision includes cold shutdown valve testing justifications and addi-tional relief requests not included in the approved IST program addressed in Supplement 6 to the Vogtle Safety Evaluation Report.
The staff, with technical assistance from EG&G, Idaho, Inc. , has completed its review of the proposed IST program changes and finds those changes acceptable. The bases for the findings are provided in the enclosed staff evaluation and the associated contractor's report.
The staff, with technical assistance from EG&G, Idaho, Inc., has completed its review of the proposed IST program changes and finds those changes acceptable. The bases for the findings are provided in the enclosed staff evaluation and the associated contractor's report.
Sincerely, t
Sincerely, t
Melanie A. Miller, Project Manager Project Directorate II-3 Division of Reactor Projects, I/II                   )
Melanie A. Miller, Project Manager Project Directorate II-3 Division of Reactor Projects, I/II
)
i Ericlosures: As stated cc: See next page DISTRIBUTION:
i Ericlosures: As stated cc: See next page DISTRIBUTION:
U6cTer7TTe-           JHuang                                                                   l TSullivan NRC PDR Local PDR             LMagleby, EG&G PRC System             HP,ockhold, EG&G PD#23 . Reading MDuncan                                                                                           j MMiller             e7093001e9 e70922                                                             J JPartlow           PDR   ADOCK 05000424                                                         j P                   PDR EJordan OGC-Bethesda                                                                                       !
U6cTer7TTe-JHuang l
ACRS (10)
NRC PDR TSullivan Local PDR LMagleby, EG&G PRC System HP,ockhold, EG&G PD#23. Reading MDuncan j
PD/y l'     P-1/II   PD#p-fDRP-I/II       PD#II-3/DRP-I/II MMiO@u"r/mac           MDun'chri             KJabbour, Acting PD                                   )
MMiller e7093001e9 e70922 J
09/.3g/87             09/f)/87             09/ g /87 f\                                                                                             i i
JPartlow PDR ADOCK 05000424 j
EJordan P
PDR OGC-Bethesda ACRS (10)
PD/y l' P-1/II PD#p-fDRP-I/II PD#II-3/DRP-I/II MMiO@u"r/mac MDun'chri KJabbour, Acting PD
)
09/.3g/87 09/f)/87 09/ g /87 f\\
i i
1
1
_ . . _ _ _ _ _ _}}
_}}

Latest revision as of 05:36, 3 December 2024

Advises That Rev 2 to Inservice Testing Program,Submitted on 870625 & Amended on 870827,acceptable.Rev Includes Cold Shutdown Valve Testing Justifications & Addl Relief Requests Not Included in Approved Program.Safety Evaluation Encl
ML20235G731
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/22/1987
From: Mark Miller
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20235G734 List:
References
TAC-65725, NUDOCS 8709300189
Download: ML20235G731 (1)


Text

_ _ - _ _ _ _ _ _ _

1 Docket No.:

50-424 l

Mr. James P. O'Reilly SEP 2 21987 Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545 i

Atlanta, Georgia 30302

Dear Mr. O'Reilly:

Subject:

Staff Acceptance of the Inservice Testing Program, Revision 2 l

for Vogtle Unit 1 (TAC 65725)

I By. letter dated June 25, 1987, as amended by letter dated August 27, 1987, Georgia Power Company (GPC) submitted for NRC review and approval its pro-posed Revision 2 of the Inservice Testing (IST) Program for Vogtle Unit 1.

The revision includes cold shutdown valve testing justifications and addi-tional relief requests not included in the approved IST program addressed in Supplement 6 to the Vogtle Safety Evaluation Report.

The staff, with technical assistance from EG&G, Idaho, Inc., has completed its review of the proposed IST program changes and finds those changes acceptable. The bases for the findings are provided in the enclosed staff evaluation and the associated contractor's report.

Sincerely, t

Melanie A. Miller, Project Manager Project Directorate II-3 Division of Reactor Projects, I/II

)

i Ericlosures: As stated cc: See next page DISTRIBUTION:

U6cTer7TTe-JHuang l

NRC PDR TSullivan Local PDR LMagleby, EG&G PRC System HP,ockhold, EG&G PD#23. Reading MDuncan j

MMiller e7093001e9 e70922 J

JPartlow PDR ADOCK 05000424 j

EJordan P

PDR OGC-Bethesda ACRS (10)

PD/y l' P-1/II PD#p-fDRP-I/II PD#II-3/DRP-I/II MMiO@u"r/mac MDun'chri KJabbour, Acting PD

)

09/.3g/87 09/f)/87 09/ g /87 f\\

i i

1

_