ML20043G448
| ML20043G448 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/12/1990 |
| From: | Merschoff E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20043G449 | List: |
| References | |
| NUDOCS 9006200309 | |
| Download: ML20043G448 (5) | |
See also: IR 05000424/1990008
Text
w
,
,
.
x
!
June 12, 1990
,
1
Docket Nos. 50-424, 50-425 -
,
Georgia Power Company.
ATTN:
Mr. W. G. Hairston, III
-
Senior Vice President -
- [
Nuclear Operations
'
P. 0' Box 1295
Birmingham, AL 35201
e
- Gentlemen:
.
SUBJECT:
NRC INSPECTION REPORT NOS. 50-424/90-08 AND 50-425/90-08
An NRC team inspection of emergency procedures at your Vogtle facility was
-
conducted on May 7-18, 1990 The inspection consisted of selective examinations
of procedures for control of the Vogtle facility during an emergency. Mr. Lawyer,
NRC, lead the inspection.
His report is enclosed.
At the conclusion of the
.
inspection',- the -findings were discussed with those members of 'your staff-
'
identified in-the: enclosed report.
Within - the scope of this inspection, no violations or deviations ' were
identified.
Although procedures were found to be. adequate to support safe
emergency operations, numerous deficiencies were identified. The number and
nature of. these deficiencies place burdens on operators which could reduce-
,
their capability of responding to emergencies. The enclosed inspection report
!
documents our understanding of your intended follow-up to these deficiencies.
These follow-up actions were discussed during the exit meeting.
If your
understanding of these actions differs from the report statements, please
. inform this office.promptly.
To clearly define Georgia Power Company's plans for corrective action to resolve
y
inspection. findings, we request that GPC respond -in writing to this report
within:30' days of the date of this letter. Please respond with a statement of
intended corrective actions, to remedy th'e weaknesses identified with failure
l
to develop .-one ERG procedure,- procedural inaccuracies, poor verification and
validation, lack of r.ules of usage, inadequate step deviation documents and lack
of detai.1 in procedures. Also, please include your schedules and the dates by
which, your review and corrective action will be completed for all of the
findings from this inspection.
This inspection report itemizes a large number of individual step deficiencies
withyour emergency procedures.
Your corrective actions need to include a
,
review of the E0Ps and AOPs for additional similar deficiencies that may exist
'
as well as a review of your verification and validation program that allowed
them to occur.
In accordance nith Section 2.790 of the NRC's " Rules of Practice, "Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will' be placed in the NRC Public Document Room.
9006200309 900612
,
ADOCK 05000424
\\
O
f6k
-
-
k
i
e
,
,
.
Georgia Power Company
2-
June 1.2, 1990
'
p
h
>
h
The responses requested by this~ letter an'd its enclosure are not subject to the
!
L
clearance procedures of the Office of Management and Budget as required by the
h
Paperwork Reduction Act of'1980, Pub. L. No.96-511.
_i
.
s.
- Should you have any questions concerning this-letter, please contact us.
Sir.cerely,
%
>
'(0RIGINAL SIGNED BY E. W. MERSCH0FF)
+
r
,j,
Ellis W. Merschoff, Acting Director
'
Division of Reactor Safety
Enclosure
NRC Inspection Report
q
cc w/ encl:
i
R. P. Mcdonald
Executive Vice President-Nuclear
a
. Operations
Georgia Power Company
P. O. Box 1295-
W
Birmingham, AL: 35201
,
n
C.-K. McCoy
,
Vice President-Nuclear
Georgia Power Company
P. O. 1295
Birmingham, AL 35201
,
i."
G. Bockhold, ~Jr. -
-
t-
General Manager, Nuclear Operations-
' Georgia Power Company
P O.1600
<
Waynesboro, GA 30830
i A. Bailey
' Manager-Licensing-
Georgia Power Company
P. O. Box 1295
g
Birmingham, AL 35201
Ernest.L..Blake, Esquire
Shaw, Pittman,' Potts.and
'
Trowbridge
2300 N Street, NW
Washington, D. C.
20037
(cc w/enci cont'd - See page 3)
+
i
'k
.
I
_
6.
-
L
.
.%
lGeorgiaPowerCompany-
3
June 12, 1990
,
,
-(cc w/enci cont'd)
~
- J. E. Joiner, Esquire
.Troutman, Sanders, Lockerman, and
-L
- Ashmore
,
1400 Candler Building
127 Peachtree' Street, NE.
Atlanta, GA 30303
&
.
.
,
D. Kirkland, Ill, Counsel
i
Office of the Consumer's
!
Utility Council
> Suite 225, 32 Peachtree Street, NE
Atlanta, GA 30302
Office of Planning and Budget
!
Room 615B
i
270 Washington W wt, SW
i
.
Atlanta, GA 303;
Office of the County Commissioner
!
Burke County Commission
Waynesboro, GA 30830-
J. Leonard Ledbetter, Director
Environmental Protection Division
'
Department of Natural Resources
i
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
l
Attorney General'
4
Law Department
!
132 Judicial Building
Atlanta, GA. 30334
- State of Georgia
!
I
bec w/ encl:
E. Reis, OGC
J. Hopkins, NRR
.K. Brockman. RII
H
-Ay erdt, RII
{pocumentControlDesk
!
-(bec w/enci cont'd - See page 4)
!
~
-
.
.
.
'
4
June 12, 1990
Georgia Power Company _
'*
i
(bec w/ encl cont d)
NRC Resident 1 Inspector
o
.U.S. Nuclear: Regulatory Commission
P.'0. Box 572-
Waynesboro, GA 30830
'l
I
q
l
,
I
'I
-;
i
l
!
I
-)
!
l
'*FOR PREVIOUS CONCURRENCE --SEE ATTACHED COPY
,.
RII:DRS
RII:DRS
RII:DRS
RII:DRS
RII:DRS
- LLawyer.
- RSchin
- RBaldwin
- PKellogg
- TPeebles
06/ /90
06/ /90
06/ /90
06/ /90
06/ /90
RII:DRP
R
S
,
!
'
- KBrockman
se ff
06/ /90
/ /90
..
e
.
!
_
'
..
-<
..:
,
,,
l % ','
!
h
Georgia _ Power Company
4
June 12 1990-
h
,
'
(bec w/enci cont'd)
p
-'
,
, NRC Resident Inspector
.
-
~U.S. Nuclear Regulatory Commission
P,. O Box 572.
Waynesboro, GA' 30830.
'
4
,
s
s
3
.
.
.(
- -
,
, f '.
[
n.
RII:D 5^
RII:DRS
RII:DRS
RII: RS
RII:DRS
,LLawyer.
MR hin.
O4 R idwin
PKellogg
s,
y
06/t /90
06/.i /90
06/f/90
06/f/90
'..g/j//90
. . .
RII-
RII:DRS
7
KB
kman
.EWMerschoff
/ /90
06/ /90
'
. .