Confirms 900606 Telcon Granting Regional Waiver of Compliance from Tech Spec 4.3.2.2 Which Requires That Each ESFAS Function Response Time Be Demonstrated to Be within Limit at Least Once Per 18 Months
ML20043H027
Person / Time
Site: Vogtle  
Issue date: 06/07/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 9006210464
Download: ML20043H027 (3)


Text

v gl l

"b JUN 07 1990

?

i Docket Nos. 50-424 and 50-425 License Nos.--NPF-68 and NPF-81 6

Georgia Power Company ATTN: Mr. W. G. Hairston, III Senior Vice President -

~

Nuclear Vice President

'P.O. Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

REGIONAL WAIVER OF COMPLIANCE - V0GTLE UNIls 1 AND 2 L

This letter confirms the telephone conversation between Mr. C. K. McCoy, of your staff and Mr. K. E. Drockman, of my staff on June 6,1990, granting a Regional Waiver of Compliance for Vogtle Units 1 and 2.

Our action was based V

on your verbal request of June 6,1990, as documented in your letter issued on the same date.

b Technical Specification 4.3.2.2 requires that each Engineered Safety Features System (ESFAS) function response tine be demonstrated to be within its limit at least once per 18 months.

In order to obtain a complete response time actuation for the Control Room Emergency Filtration System (CREFS), the diesel generator sequence loading delays and the fan response times have to be measured.

Procedural inadequacies have been identified by your staff which indicate that these parts of response time testing had not been adequately 1

demonstrated.

~

'The measurement of the diesel generator sequencer loading delays can be L

accomplished within the provisions of the Technical. Specifications; however, j

in order to measure the response time of the CREFS fans, the two operating CREFS trains would have to be shut down. This would preclude you from meeting the requirements of the Limiting Condition for Operation Action Statement and necessitate entry into Technical Specification 3.0.3.

W y

The waiver allowed relief from the requirements of Action Statement 27 of Technical: Specification 3.3.2 for a period of six hours.

This would allow Georgia Power adequate time to accomplish the required portion of the response L'

time testing and perform any troubleshooting or evaluation which could occur during the conduct of the tests.

It is recognized that the CREFS could be manually restarted at any time during the test, if the need arose.

It is 1

~

.also recognized that this waiver and the procedures developed to c)nduct the terJ. have been reviewed by the Plant Review Board and determined t> be proper andi appropriate. ' This is a one-time waiver of compliance based upon the t

justification provided in your request letter dated June 6, 1990, p

n

\\.

g6210464900607 ID p

ADock c5000424 QCf V

PDC Y

,e s

e X

s Georgia Power Company 2

JUN 07 issu Should you have any questions concerning this letter, please contact us.

Sincerely, V

Stewart D. Ebneter i-Regional Administrator cc:

R. P. Mcdonald Executive Vice President-Nuclear Operations Georgia Power Company P. 0. Box 1295 l

Sirmingham, AL 35201

\\

C. K. McCoy i

Vice President-Nuclear Georgia Power Company P. O. 129E i

Birmingham. AL 35201 G. Bockhold, Jr.

General Manager, Nuclear Operations Georgia Power Company P. O. 1600 Waynesboro, GA 30830 J. A. Bailey Manager-Licensing Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 i

Ernest L. Blake, Esquire Shaw, Pittman, Potts and

.Trowbridge 2300'N. Street, NW Washington, D. C.

20037 J. E. Joiner, Esquire Troutman, Sanders, Lockerman, and Ashmore 1400 Candler Building 127 Peachtree Street, NE Atlanta, GA 30303 (cc cont'd - see page 3)

F

,i.1&

~

(

c o,

Georgia Power Company 3

)ggg cc:

(Continued)

D. Kirkland, III, Counsel

')ffice of the Consumer's Utility Council Suite 225, 32 Peachtree Street, NE Atlanta, GA 30302 Office of Planning and Budget Room 615B 270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 J. Leonard Ledbetter Director Environmental Protection Division Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 State of Georgia bec: E. Reis. 0GC J. Hopkins, NRR K. Brockman, RII A. Herdt, RII Document Control Desk NRC Resident Inspector U.S. Iluclear Regulatory Connission P. O. Box 572 Waynesboro, GA 30830

/

RII RII RI RII I

W h

N t

]

gg P KBrockman AHerdt yes DMatthews i hoan 6q/90 6/1 /90