Advises That Util 890616 Response to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs, Acceptable
ML20034A098
Person / Time
Site: Vogtle  
Issue date: 04/12/1990
From: Tim Reed
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
IEB-89-001, IEB-89-1, TAC-73217, TAC-73218, NUDOCS 9004200050
Download: ML20034A098 (2)


Text

<

[

April 12, 1990 Docke'ts Nos. 50-424 DISTRIBUTION:

50-425

-tDocket Filed NRC PDR Local PDR PDII-3 R/F.

Vogtle R/F SVarga GLaines DMatthews Mr. W. G. Hairston, III Ring ram Treed Senior Vice President -

OG O4" EJordan Nuclear Operations AC' tG O)

LEngle Geoisia Power Company P.O. Box 1295-Birmingham, Alabama 35201

Dear Hr. Hairston:

SUBJECT:

CLOSE0VT OF NRC BULLETIN 89-01, " FAILURE OF WESTINGHOUSE STEAM t

GENERATOR BJBE MECHANICAL PLUGS," FOR V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 '(TAC NOS. 73217/73218).

Your letter of June 16,1989 (ELV-00615) responded to NRC Bulletin 89-01,

" Failure of Westinghouse Steam Generator Tube Mechanical Plugs," for the Vogtle Electric Generating Plant (VEGP), Units I and 2.

Your response. stated that:

1.

Georgia Power Conpany (GPC) has verified that no plugs from heat nunbers 3279, 3513, 3962, and 4523 are installed in any VEGP steam generators.

2.

GPC will not install any Westinghouse nechanical plugs from the subject heats in the VEGP steam generators.

3.

GPC will examine, on a sample basis for primary water stress: corrosion cracking (PWSCC), nochanical plugs removed from VEGP steam generators regardless of heat nunter.

The records of these PWSCC examinations will be maintair.ed and the results provided to Westinghouse.

The above stated actions adequately address the NRC Bulletin requirenents and provide a sufficient basis for closure of NRR's review of this licensing issue.

Further NRC review, if any, will be pursued through the inspection or audit process.

Sincerely,

Timothy A. Reed, Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II-t Office of Nuclear Reactor Regulation cc:

See next page OFFICIAL RECORD COPY Document Name: V0GTLE 73217/73 h r

' f Af PM:Ph.

k

I 4\\RIngg/

TARedd:ms D t : thews-1

- 03/6G 90 03/$/90 0$/ /90'

{8g42ggggggggyg4 w

,d

i 4.

1

(

Mr..W. G. Hairston, III Georgia Power Company

..Vogtle Electric' Generating PlantL g

L

-cc:

h

'Mr. J. A. Bhiley" Mr. J. Leonard Ledbetter, Director Manager - Licensing-Environmental Protection Division-

~ Georgia Power Company Department of Natural Resources

~

LP.O.. Box 12951 205 Butler Street, S.E., Suite 1252 Birmingham, Alabama 35201

' Atlanta, Georgia 30334-.

Mr.-G.:Bockhold,-Jr.-_

Law Department 1 eneral Manager, Vogtle Electric.

. Attorney _ General

'i 0

Generating Plant!

132 Judicial Building l

P.O. Box 1600-Atlanta', Georgia -30334-L Waynesboro,; Georgia 30830 I

- Mr. Alan R. Herdt-L Regional Administrator, Region-II

- Project Branch #3 U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission J

.101 Marietta Street, N.W., Suite 2900

- 101.Marietta Street, NW, Suite 2900 Atlanta,: Georgia 30323 Atlanta, Georgia'_ 30323 l

Office of the County Comissioner-Burke County Commission i

' Waynesboro, Georgia. 30830 l

Office of Planning and Budget Room 615B 270 Washington Street, S.W.

LAtlanta,~ Georgia 30334 4

Mr. C. K. McCoy Vice Presient - Nuclear, Vogtle Project

' Georgia Power Company P.O. Box 1295 -

Birmingham,_. Alabama 35201 Resident Inspector-Nuclear Regulatory Comission P.O. Box 572 Waynesboro, Georgia 30B30 Mr. R. P. Mcdonald Executive Vice President -

Nuclear Ope. rations Georgia Power Company P. O.-Box 1295 i

Birmingham,: Alabama 35201 w

3 r

.m p

O

\\

h a-1

,