ML20033G743
| ML20033G743 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/29/1990 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hairston W Georgia Power Co |
| References | |
| NUDOCS 9004120052 | |
| Download: ML20033G743 (3) | |
Text
5.
SAFEGUARDS INFORMATION NAR 2 91990 Georgia Power Company ATTN: Mr. W. G. Hairston, !!!
KD e>g%RDS WOR'NM Senior Vice President -
Nuclear Operations P. O. Box 1295 l
birmingham, AL 35201 Gentlemen:
SUBJECT:
DOCKET NOS. 50-424 AND 50-425 This acknowledges the receipt of your letter of March 12, 1990, which transmitted Revision 16 to the Vogtle Electric Generating Plant Physical Security and Contingency Plan.
Additional information is required before we can agree that portions of this plan revisich are consistent with the requirements of 10 CFR 50.54(p).
The area requiring clarificel'on is discussed in the enclosure to this letter.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, William E. Cline, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
Enclosure:
l Security Plan Coninents (SafeguardsInformation) cc w/ encl:
R. P. Mcdonald i
Executive Vice President-Nuclear Operations Georgia Power Company P. O. Box 1.*
i Birmingham, AL 35201 j
0 (cc w/ encl cont'd - See page 2)
ADOCKoDOe'g'4 h
900412o052 900 e
DR Document trommitted bewth SAFEGUARDS INFORMATION
- ONOU*"
,, -- t, e-4
h SAFEGOARDS.lNFORMATION' Georgia Power Company
'2.
NI8 %
(ccw/encicont'd)
C. K..McCoy Vice President-Nuclear Georgia Power Company P. O. Box 1295 Birmingham. AL 35201 G. Bockhold, Jr.
General Manager Nuclear. Operations Georgio Power Company P. O. 1600 Waynesboro, GA 30830 J. A. Bailey Manager-Licensing Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 cc w/o enc 1:
Ernest L. Blake, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW Washington, D. C.
20037 J. E. Joiner, Esq.
Troutman, Sanders, Lockerman, & Ashmore 1400 Candler Building 127 Peachtree Street, NE Atlanta, GA 30303 D. Kirkland, III, Counsel Office of the Consumer's Utility Council Suite 225, 32 Peachtree Stricet, NE Atlanta, GA 30302 Office of Planning and Budget Room 615B 270 Washingten Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Commission Waynesborc, GA 30830 J. Leonard Ledbetter, Director Environmental Protection Division i
Department of Natural Resources
]
205 Butler Street, SE, Suite 1252 4
Atlanta, GA 30334 Docurperit transmitted Wrew2 (cc w/o enci cont'd - Su gg g "
a
s'
" ~
SAFEGUARDS INFORMATION Georgia Power Company 3
E28%
(cc w/o enci cont'd)
I Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 State of Georgia bec w/ encl:
Chief, Safeguards Branch, NRR, 90-24 Region II Licensing File (50-424),
(19VA), TAB 2 bec w/o encl:
Document Control Desk (RG01), 42-P NRC Resident Inspector E. Reis, OGC' J. Hopkins, NRR K. Brockman, RII A. Herdt, RII l
1 RII:pRSS p
)p33 0 mfhh
.g'cguire,. GUARDS /T*6RMATl0N
._E#E000*c,,,.a b
X an i
C
.n-
=
a