Text
@Q(
!
,
,
. .
.
1
'*
.
April 10, 1990
.
,
Docket Nos. 50-424, 50-425
l
,
>
!
Georgia Power Company
i
ATTN:
Mr. W. G. Hairston, III
,
Senior Vice President -
6
-;
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
'I
l
SUBJECT:
NRC INSPECTION REPORT NOS. 50-424/90-07 AND 50-425/90-07
i
!
This refers to the Nuclear Regulatory Commission-(NRC) inspection conducted by
' ;
R.
Newsome on March 12-16, 1990.
The inspection included a - review .of-
'
activities authorized for your Vogtle 1 and 2 facility.
At the conclusion _of
the inspection, the findings were discussed with those members of your staff
'
identified in the enclosed Inspection Report.
l
Areas examined during the inspection are identified in the report.
Within
!
~
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, violations or deviations were not
identified.
,
l
In accordance with 10 CFR 2.790(a), a copy of this letter 6.sa its enclosures
will be placed in the NRC Public Document Room.
-
Should you have any questions concerning this letter, please' contact us.
Sincerely,
Original Signed by
Caudie A. Julian-
'
Caudie A. Julian,. Chief.
Engineering Branch
Division of Reactor Safety
7
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
'
'
9004230517 900410
ADOCK 0500
4
O
I[I
1 50;.
--
___
l
.
.
,-
,
.
Georgia Power Company
2
April 10, 1990
(ce w/ enc 1 cont'd)
R. P. Mcdonald
Executive Vice President-Nuclear
Operations
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
C. K. McCoy
Vice President-Nuclear
Georgia Power Company
P. 0, 1295
Birmingham, AL 35201
G. Bockhold, Jr.
General Manager Nuclear Operations
Georgia Power Company
P. O. 1600
Waynesboro, GA 30830
J. A. Bailey
Manager-Licensing
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
Ernest L. Blake, Esquire
Shaw, Pittman, Potts and
Trowbridge
2300 N Street, NW
Washington, D. C.
20037
J. E. Joiner, Esquire
Troutman, Sanders, Lockerman, and
Ashmore
1400 Candler Building
127 Peachtree Street, NE
Atlantu, GA 30303
D. Kirkland, III, Counsel
Office of the Consumer's
Utility Council
Suite 225, 32 Peachtree Street, NE
Atlanta, GA _30302
Office of Planning and Budget
Room 615B
270 Washington Street, SW
Atlanta, GA 30334
(cc w/ enc 1 cont'd - See page 3)
i
'$
S
-
.
<
.
.
Georgia Power Company
3
April 10, 1990
(ccw/encicont'd)
Office of the County Connissioner
Burke County Connission
Waynesboro, GA 30830
J. Leonard Ledbetter, Diroctor
Environmental Protection Division
Department of Natural Resources
205 Butler Street, SE Suite 1252
Atlanta, GA 30334
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
State of Georgia
bec w/ encl:
E. Reis, OGC
J. Hopkins, NRR
K. Brockman, RII
A. Herdt, RII
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
P. O. Box 572
Waynesboro, GA 30830
E. Herschoff
K. Brockman
J. Blake
R. Newsome
RII:0RS
)S
RII:
N
o
RNewsome
,,s Bla e
K
kman
03/7tf90
/ 030,t/90
/ /90'
t
.