CAC:001028, (Approved, Closed) EPID:L-2022-LLA-0228, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2021 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20049A082, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20121A272, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287... further results
|
MONTHYEARML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20128J2922020-04-27027 April 2020, 28 April 2020 International, Submittal of Responses to Nrc,S 1st Round RAIs for HI-STORM 100 Amendment Number 15 Project stage: Request 2020-03-05
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML22214A1182022-10-11011 October 2022 Hb ISFSI Amendment 5 SNM-2514 Technical Specifications Changed Pages (LAR 21-02) ML20161A0282020-06-10010 June 2020 Technical Specifications - SNM-2514 Renewal ML15090A3392016-05-0404 May 2016 Letter to Halpin, Amendment to Humboldt Bay License Approving the License Termination Plan ML15218A5572015-09-22022 September 2015 License Amnd 4 for Humboldt Bay ISFSI ML1013101962010-07-23023 July 2010 Humbolt Bay, Unit 3, Technical Specifications ML0800802672008-02-14014 February 2008 License Amendment, Issuance of Amendment Deletion of Operational and Administrative Requirements HBL-06-002, Revision of Technical Specification Section 3.1.2. Spent Fuel Pool Load Restrictions, and Section 5.2.2., Facility Staff2006-01-19019 January 2006 Revision of Technical Specification Section 3.1.2. Spent Fuel Pool Load Restrictions, and Section 5.2.2., Facility Staff ML0232502032002-11-18018 November 2002 Humbolt Bay Power Plant Unit 3, Technical Specifications (Ts), Converting Current TS to Set of Permanently Defueled Technical Specifications Based on Format Consistent with Standard Technical Specifications (NUREG-1430 Through NUREG-1434) 2022-10-11
[Table view] |
Text
Humboldt Bay ISFSI Amendment 5 Technical Specification Page Changes Remove Page Insert Revised Page Table of Contents Table of Contents 3.1-2 3.1-2 3.1-6 3.1-6 4.0-2 4.0-2 5.0-1 5.0-1 5.0-2 5.0-2
TABLE OF CONTENTS 1.0 USE AND APPLICATION ..........................................................................................................1.1-1 1.1 Definitions ........................................................................................................................1.1-1 1.2 Logical Connectors ..........................................................................................................1.2-1 1.3 Completion Times ............................................................................................................1.3-1 1.4 Frequency ........................................................................................................................1.4-1 2.0 APPROVED CONTENTS ..........................................................................................................2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY .........................................3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ........................................................3.0-2 3.1 Spent Fuel Storage Cask (SFSC) Integrity ......................................................................3.1-1 3.1.1 Multi-Purpose Canister (MPC-HB)...................................................................................3.1-1 3.1.2 Overpack Heat Removal System.....................................................................................3.1-3 3.1.3 Deleted.............................................................................................................................3.1-6 4.0 DESIGN FEATURES.................................................................................................................4.0-1 4.1 Design Features Significant to Safety..............................................................................4.0-1 4.1.1 Criticality Control .............................................................................................................4.0-1 4.2 Codes and Standards ......................................................................................................4.0-1 4.2.1 Alternatives to Design Codes, Standards, and Criteria....................................................4.0-1 4.3 Cask Handling..................................................................................................................4.0-2 4.3.1 Cask Transporter .............................................................................................................4.0-2 4.3.2 Storage Capacity .............................................................................................................4.0-2 4.3.3 SFSC Load Handling Equipment .....................................................................................4.0-2 5.0 ADMINISTRATIVE CONTROLS................................................................................................5.0-1 5.1 Administrative Programs..................................................................................................5.0-1 5.1.1 Technical Specifications (TS) Bases Control Program ....................................................5.0-1 5.1.2 Radioactive Effluent Control Program..............................................................................5.0-1 5.1.3 Deleted.............................................................................................................................5.0-1 5.1.4 ISFSI Operations Program...............................................................................................5.0-2 5.1.5 Cask Transportation Evaluation Program ........................................................................5.0-2 5.1.6 Deleted.............................................................................................................................5.0-2 5.1.7 Quality Assurance Program Changes..............................................................................5.0-2 HUMBOLDT BAY ISFSI T of C Renewed License Amendment 5
MPC-HB 3.1.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. MPC-HB helium leak rate limit C.1 Perform an engineering 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for vent and drain port cover evaluation to determine the plate welds not met. impact of increased helium leak rate on heat removal capacity.
AND C.2 Develop and initiate corrective 7 days actions necessary to return the MPC-HB to an analyzed condition.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify MPC-HB cavity vacuum drying pressure is 3 torr for Once, prior to 30 min. TRANSPORT OPERATIONS.
OR While recirculating helium through the MPC-HB cavity, verify that the gas temperature exiting the demoisturizer is 21F for 30 min or the dew point of the gas exiting the MPC is < 22.9F for 30 min.
SR 3.1.1.2 Verify MPC-HB helium backfill pressure is 45.2 psig and 48.8 Once, prior to psig at a reference temperature of 70F. TRANSPORT OPERATIONS.
SR 3.1.1.3 Verify that the total helium leak rate through the MPC-HB vent Once, prior to and drain port cover plate welds is 1.0E-7 atm-cc/sec (He). TRANSPORT OPERATIONS.
HUMBOLDT BAY ISFSI 3.0 Renewed License Amendment 5 3.1-2
3.1 SFSC INTEGRITY 3.1.3 Deleted HUMBOLDT BAY ISFSI 3.0 Renewed License Amendment 5 3.1-6
Design Features 4.0 4.0 DESIGN FEATURES (continued) 4.3 Cask Handling 4.3.1 Cask Transporter A cask transporter is used to transport the SFSC. The requirements for the cask transporter are as follows:
- a. TRANSPORT OPERATIONS shall be conducted using the cask transporter.
- b. The cask transporter fuel tank shall not contain 50 gallons of diesel fuel at any time.
- c. The cask transporter shall be designed, fabricated, inspected, maintained, operated, and tested in accordance with the applicable guidelines of NUREG-0612.
- d. The cask transporter lifting towers shall have redundant drop protection features.
4.3.2 Storage Capacity The Humboldt Bay ISFSI can accommodate up to 400 spent fuel assemblies. The ISFSI storage capacity can accommodate up to six SFSCs.
4.3.3 SFSC Load Handling Equipment Lifting of a SFSC shall be performed with load handling equipment that is designed, fabricated, inspected, maintained, operated and tested in accordance with the applicable guidelines of NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants.
HUMBOLDT BAY ISFSI 4.0 Renewed License Amendment 5 4.0-2
Administrative Controls 5.0 5.0 ADMINISTRATIVE CONTROLS 5.1 Administrative Programs The following programs shall be established, implemented, and maintained:
5.1.1 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these TS.
- a. Changes to the TS Bases shall be made under appropriate administrative controls and reviews.
- b. Changes to the TS Bases may be made without prior NRC approval in accordance with the criteria in 10 CFR 72.48.
- c. The TS Bases Control Program shall contain provisions to ensure that the TS Bases are maintained consistent with the Humboldt Bay ISFSI SAR.
- d. Proposed changes that do not meet the criteria of 5.1.1.b above shall be reviewed and approved by the NRC prior to implementation. Changes to the TS Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 72.48 (d) (2).
5.1.2 Radioactive Effluent Control Program
- a. This program is established and maintained to implement the requirements of 10 CFR 72.44 (d) or 72.126, as appropriate. There are no radioactive gaseous or liquid effluents released from the Humboldt Bay Independent Spent Fuel Storage Installation (ISFSI) during operation. Therefore, a radioactive effluent monitoring system is not required, routine monitoring for effluents is not performed, and the licensee is exempted from the reporting requirements under 10 CFR 72.44(d)(3).
- b. Deleted 5.1.3 Deleted (continued)
HUMBOLDT BAY ISFSI 5.0 Renewed License Amendment 5 5.0-1
Administrative Controls 5.0 5.0 ADMINISTRATIVE CONTROLS (continued) 5.1.4 ISFSI Operations Program This program will implement the Humboldt Bay ISFSI SAR requirements for ISFSI operations. It will include criteria to be verified and controlled:
- a. SFSC cask storage location.
- b. Design features listed in Section 4.0 and design basis ISFSI parameters consistent with the Humboldt Bay ISFSI SAR analysis.
5.1.5 Cask Transportation Evaluation Program This program will evaluate and control the transportation of loaded SFSCs. Included in this program will be pre-transport evaluation and control during transportation of the following:
Transportation route road surface conditions.
Onsite hazards along the transportation route.
Security, including control of the 100 meter boundary.
Transporter control functions and operability.
Offsite marine hazards from barge transport.
Severe weather.
5.1.6 Deleted 5.1.7 Quality Assurance Program Changes
- a. Changes to the Quality Assurance Program shall be reviewed and approved in accordance with administrative procedures.
- b. Changes may be made to the Quality Assurance Program without prior NRC approval provided the changes do not:
- Reduce the commitments in the quality assurance program previously approved by the NRC.
- Involve a change to the Humboldt Bay ISFSI License or Technical Specifications.
- c. Changes made to the Quality Assurance Program without prior NRC approval shall be submitted to the NRC consistent with the frequency in 10 CFR 72.70(c)(6).
- d. Proposed changes which do not meet the criteria in 5.1.7.b shall be approved by the NRC prior to implementation.
HUMBOLDT BAY ISFSI 5.0 Renewed License Amendment 5 5.0-2
ML22214A115; ML22214A118
- via email OFFICE NMSS/DFM/STLB NMSS/DFM/STLB NMSS/DFM/CTCFB OEDO NAME DHabib DH WWheatley WW JSolis JS ARivera-Varona AR DATE Aug 8, 2022 Aug 10, 2022 Aug 15, 2022 Aug 17, 2022 OGC/GCHA/AGCOR OFFICE NMSS/DFM/CTCFB NMSS/DFM/STLB
/NLO*