APR  8 SB6 Docket No. 50-416                                              DISTRIBUTION kW NRC PDR BGrimes JPartlow 1
Mr. Oliver D. Kingsley, Jr.                                    Local PDR        LKintner  !
Vice President, Nuclear Operations                            PD#4 Reading-    M0'Brien Mississippi Power & Light Company                              RBernero        ACRS (10)
P.O. Box 23054                                                Young, OELD Jackson, Mississippi 39205                                    Edordan
 
==Dear Mr. Kingsley:==
 
==SUBJECT:==
GRAND GULF UNIT 1, PROCESS CONTROL PROGRAM (PCP) REVISION 1 By {{letter dated|date=August 31, 1984|text=letter dated August 31, 1984}}, Mississippi Power & Light Company transmitted as Attachment II a revised reference document entitled, " Process Control Program Description, Revision 1," dated February 1984, for Grand Gulf Nuclear Station, Unit 1. Revision 1 to the PCP addresses requirements in 10 CFR 61, dewatering, and controls to ensure a contractor performs solidification / dewatering, services I
properly.
The NRC staff has reviewed this submittal and finds that Revision 1 to the PCP complies with current NRC criteria and, therefore, is acceptable on an interim basis for use with Grand Gulf Technical Specification 6.13. A copy of the staff's safety evaluation is enclosed. Attachment I to the safety evaluation is a request for additional information which should be addressed within six months of the date of this letter.
The acceptability of Revision 1 to the PCP is based on currently available NRC guidelines, but a future revision should address full compliance with 10 CFR 61 when revised guidance becomes available from the NRC. This guidance is scheduled for development in 1987.
1                                            Sincerely, pristnal signed by Walter R. Butler, Director i
BWR Project Directorate No. 4
-                                            Division of BWR Licensing l 
 
==Enclosure:==
 
l  As stated l  cc: See next page
            /
PD# / M (
                                    \
PD#4/D LKintner:lb    WButler 04/[/86        04/[/86 8604170313 860408 PDR    ADOCK 05000416 P                PDR        ,
 
  '/*        ~%    .                      UNITED STATES E          %              NUCLEAR REGULATORY COMMISSION O          E                      WASHINGTON, D. C. 20555 APR  8 IIB 6 Docket No. 50-416 Mr. Oliver D. Kingsley, Jr.
Vice President, Nuclear Operations Mississippi Power & Light Company P.O. Box 23054 Jackson, Mississippi    39205
 
==Dear Mr. Kingsley:==
 
==SUBJECT:==
GRAND GULF UNIT 1, PROCESS CONTROL PROGRAM (PCP) REVISION 1 By {{letter dated|date=August 31, 1984|text=letter dated August 31, 1984}}, Mississippi Power & Light Company transmitted as Attachment II a revised reference document entitled, " Process Control Program Description, Revision 1," dated February 1984, for Grand Gulf Nuclear Station, Unit 1. Revision 1 to the PCP addresses requirements in 10 CFR 61, dewatering, and controls to ensure a contractor performs solidification / dewatering services
!    properly.
The NRC staff has reviewed this submittal and finds that Revision 1 to the PCP complies with current NRC criteria and, therefore, is acceptable on an interim basis for use with Grand Gulf Technical Specification 6.13. A copy of the staff's safety evaluation is enclosed. Attachment 1 to the safety evaluation is a request for additional information which should be addressed within six months
~
of the date of this letter.
The acceptability of Revision 1 to the PCP is based on currently available
;    NRC guidelines, but a future revision should address full compliance with
:    10 CFR 61 when revised guidance becomes available from the NRC. This guidance i
is scheduled for development in 1987.                                                              l Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
 
==Enclosure:==
 
As stated cc:    See next page                                                                                l
__m      . ,-.<
 
..                                                                                                                                                                                              l Mr. Oliver D. Kingsley, Jr.
l          Mississippi Power & Light Company                                                            Grand Gulf N.uclear Staiton i          cc:
Robert B. McGehee, Esquire                                                                  The Honorable William J. Guste, Jr.
;          Wise, Carter, Child, Steen and Caraway                                                      Attorney General                                                              .
Department of Justice P.O. Box 651 i          Jackson, Mississippi 39205                                                                    State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire
{          Bishop Liberman, Cook, Purcell                                                              Office of the Governor and Reynolds                                                                              State of Mississippi 1200 17th Street, N.W.                                                                      Jackson, Mississippi 39201 Washington, D. C. 20036 Mr. Ralph T. Lally                                                                          Gartin Building Manager of Quality Assurance                                                                Jackson, Mississippi            39205 Middle South Services, Inc.
P.O. Box 61000                                                                              Mr. Jack McMillan, Director j          New Orleans, Louisiana 70161                                                                  Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director                                                                      Resources                                                                          l j          Nuclear Licensing and Safety                                                                  Bureau of Pollution Control i          Mississippi Power & Light Company                                                            Post Office Box 10385
]          P.O. Box 23054                                                                              Jackson, Mississippi            39209
]
Jackson, Mississippi 39205 Alton B. Cobb, M.D.                                                                    ;
Mr. R. W. Jackson, Project Engineer                                                          State Health Officer i          Bechtel Power Corporation                                                                    State Board of Health 4
15740 Shady Grove Road                                                                        P.O. Box 1700 l          Gaithersburg, Maryland 20877-1454                                                            Jackson, Mississippi            39205 Mr. Ross C. Butcher                                                                          President
!          Senior Resident Inspector                                                                    Claiborne County Board of Supervisors j          U.S. Nuclear Regulatory Commission                                                            Port Gibson, Mississippi 39150
;          Route 2, Box 399                                                                                          i l          Port Gibson, Mississippi, 39150                                                              Mr. Ted H. Cloninger                                                                  ;
;                                                                                                        Vice President Nuclear Engineering i
Regional Administrator, Region II                                                                and Support
.          U.S. Nuclear Regulatory Commission,                                                          Mississippi Power & Light Company                                                    ,
101 Marietta Street, N.W., Suite 2900                                                        Post Office Box 23054
+
Atlanta, Georgia 30323                                                                        Jackson, Mississippi 39205 Mr. J. E. Cross                                                                                                                                                                    '
l        Grand Gulf Nuclear Station Site Director l          Mississippi Power & Light Company i          P.O. Box 756
;          Port Gibson, Mississippi 39150 J
i          Mr. C. R. Hutchinson                                                                                                                                                                l GGNS General Manager                                                                                                                                                                l Mississippi Power & Light Company                                                                                                                                                    ,
Post Office Box 756                                                                                                                                                                  l
)          Port Gibson, Mississippi 39150 i                                                                                                                                                                                              l 1
        -,          .,-----....._.w,.- ,,-.y,  - - - . . . ---..---,,----.-.,.,,.,.,.--+y....,,~_-.-,--,<w                    v.,-,    . ~ , . - - - . , - - , . - - , . - ~ . , - - - -
                                                                                                                                                                                            , ,}}

Latest revision as of 22:44, 9 December 2021

Forwards Safety Evaluation Supporting Rev 1 to Process Control Program on Interim Basis for Use W/Tech Spec 6.13. Request for Addl Info Re Process Control Program Encl. Response Requested within 6 Months of Ltr Date
ML20155D379
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/08/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20155D382 List:
References
NUDOCS 8604170313
Download: ML20155D379 (3)


Text

. .

APR 8 SB6 Docket No. 50-416 DISTRIBUTION kW NRC PDR BGrimes JPartlow 1

Mr. Oliver D. Kingsley, Jr. Local PDR LKintner  !

Vice President, Nuclear Operations PD#4 Reading- M0'Brien Mississippi Power & Light Company RBernero ACRS (10)

P.O. Box 23054 Young, OELD Jackson, Mississippi 39205 Edordan

Dear Mr. Kingsley:

SUBJECT:

GRAND GULF UNIT 1, PROCESS CONTROL PROGRAM (PCP) REVISION 1 By letter dated August 31, 1984, Mississippi Power & Light Company transmitted as Attachment II a revised reference document entitled, " Process Control Program Description, Revision 1," dated February 1984, for Grand Gulf Nuclear Station, Unit 1. Revision 1 to the PCP addresses requirements in 10 CFR 61, dewatering, and controls to ensure a contractor performs solidification / dewatering, services I

properly.

The NRC staff has reviewed this submittal and finds that Revision 1 to the PCP complies with current NRC criteria and, therefore, is acceptable on an interim basis for use with Grand Gulf Technical Specification 6.13. A copy of the staff's safety evaluation is enclosed. Attachment I to the safety evaluation is a request for additional information which should be addressed within six months of the date of this letter.

The acceptability of Revision 1 to the PCP is based on currently available NRC guidelines, but a future revision should address full compliance with 10 CFR 61 when revised guidance becomes available from the NRC. This guidance is scheduled for development in 1987.

1 Sincerely, pristnal signed by Walter R. Butler, Director i

BWR Project Directorate No. 4

- Division of BWR Licensing l

Enclosure:

l As stated l cc: See next page

/

PD# / M (

\

PD#4/D LKintner:lb WButler 04/[/86 04/[/86 8604170313 860408 PDR ADOCK 05000416 P PDR ,

'/* ~% . UNITED STATES E  % NUCLEAR REGULATORY COMMISSION O E WASHINGTON, D. C. 20555 APR 8 IIB 6 Docket No. 50-416 Mr. Oliver D. Kingsley, Jr.

Vice President, Nuclear Operations Mississippi Power & Light Company P.O. Box 23054 Jackson, Mississippi 39205

Dear Mr. Kingsley:

SUBJECT:

GRAND GULF UNIT 1, PROCESS CONTROL PROGRAM (PCP) REVISION 1 By letter dated August 31, 1984, Mississippi Power & Light Company transmitted as Attachment II a revised reference document entitled, " Process Control Program Description, Revision 1," dated February 1984, for Grand Gulf Nuclear Station, Unit 1. Revision 1 to the PCP addresses requirements in 10 CFR 61, dewatering, and controls to ensure a contractor performs solidification / dewatering services

! properly.

The NRC staff has reviewed this submittal and finds that Revision 1 to the PCP complies with current NRC criteria and, therefore, is acceptable on an interim basis for use with Grand Gulf Technical Specification 6.13. A copy of the staff's safety evaluation is enclosed. Attachment 1 to the safety evaluation is a request for additional information which should be addressed within six months

~

of the date of this letter.

The acceptability of Revision 1 to the PCP is based on currently available

NRC guidelines, but a future revision should address full compliance with
10 CFR 61 when revised guidance becomes available from the NRC. This guidance i

is scheduled for development in 1987. l Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc: See next page l

__m . ,-.<

.. l Mr. Oliver D. Kingsley, Jr.

l Mississippi Power & Light Company Grand Gulf N.uclear Staiton i cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General .

Department of Justice P.O. Box 651 i Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire

{ Bishop Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20036 Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director j New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources l j Nuclear Licensing and Safety Bureau of Pollution Control i Mississippi Power & Light Company Post Office Box 10385

] P.O. Box 23054 Jackson, Mississippi 39209

]

Jackson, Mississippi 39205 Alton B. Cobb, M.D.  ;

Mr. R. W. Jackson, Project Engineer State Health Officer i Bechtel Power Corporation State Board of Health 4

15740 Shady Grove Road P.O. Box 1700 l Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President

! Senior Resident Inspector Claiborne County Board of Supervisors j U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150

Route 2, Box 399 i l Port Gibson, Mississippi, 39150 Mr. Ted H. Cloninger  ;
Vice President Nuclear Engineering i

Regional Administrator, Region II and Support

. U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company ,

101 Marietta Street, N.W., Suite 2900 Post Office Box 23054

+

Atlanta, Georgia 30323 Jackson, Mississippi 39205 Mr. J. E. Cross '

l Grand Gulf Nuclear Station Site Director l Mississippi Power & Light Company i P.O. Box 756

Port Gibson, Mississippi 39150 J

i Mr. C. R. Hutchinson l GGNS General Manager l Mississippi Power & Light Company ,

Post Office Box 756 l

) Port Gibson, Mississippi 39150 i l 1

-, .,-----....._.w,.- ,,-.y, - - - . . . ---..---,,----.-.,.,,.,.,.--+y....,,~_-.-,--,<w v.,-, . ~ , . - - - . , - - , . - - , . - ~ . , - - - -

, ,