Category:CONTRACTED REPORT - RTA
MONTHYEARML20211K7681999-07-30030 July 1999 Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30
[Table view] Category:QUICK LOOK
MONTHYEARML20211K7681999-07-30030 July 1999 Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20211K7681999-07-30030 July 1999 Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20211K7681999-07-30030 July 1999 Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30
[Table view] |
Text
. !
,' TER-C5506-590
~
f APPENDIX D EVALUATION OF LICENSEE-REPORTED REVISIONS TO ' PCP P
lt I
t l
I I
i FRANKLIN RESEARCH CENTER OfVi$10N OF ARVIN/ CAL 5 PAN 20th & RACE STREETS.PI,4tLADELPHIA.PA 19103 8604170490 DR 860408 ADOCK 05000416 PDR 9
c
' TER-C5506-590 e
i I
D.2. EVALUATION OF LICENSEE-REPORTED REVISIONS TO PCP i
The Licensee has made several changes to the PCP that was issued by the Licensee on April 27, 1982 and approved by NRC on November 19, 1982.* These I
changes appeared as Revision 1 to the PCP in the first 6-month Semiannual Radioactive Effluent Report of 1984, but no changes were made in the subse-quent two semiannual reports in 1984 and 1985.
It is Revision 1 of the PCP that has been reviewed for this report. The result of the evaluation is intended to be a standalone document, and is given in the following attachment as Supplement B to Appendix D. j
- Letter from A. Schwencer (NRC/DL) to J. P. McGaughy, Jr. (MP&L), November 16, 1982.
D-1
l l
SUPPLEMENT B {'
l to l APPENDIX D ,
l 4!
EVALUATION OF LICENSEE-REPORTED REVISIONS TO PCP l
l i
, I l
1 i
I f
I l
l FRANKLIN RESEARCH CENTER OlVISION OF ARVIN/CALSPAN 20th & RACE STREET 1. PHILADELPHIA,PA 19105 l
l
) 1. INTRODUCTION.
j 3
}- 1.1 PURPOSE OF REVIEW 4
- j The purpose of this document is to review and evaluate the Process Control f
i Program (PCP), updated through June 30, 1985, as revised by the Grand Gulf
' Nuclear Station Unit i since April 27, 1982 when the PCP was issued by the
?
Licensee as Revision 0 (1) and was subsequently approved by the NRC (2].
The PCP is a supplementary document for implementing the Radiological i Effluent Technical Specifications (RETS) in compliance with Standard Review a
{ Plan 11.4 (3] and Branch Technical Position ETSB-11-3 (4].
1 1.2 SCOPE OF REVIEW As specified in NURE-0472 (5) and NUREG-0473 (6], the PCP is to be f developed by the Licensee to document the current formula, sampling, analyses, j tests, and determinations to be made to ensure that the processing and t
i packaging of solid radwastes are accomplished. As a minimum, the PCP should
- provide commitments and information regarding the following topics (7)
,f i o Processing and packaging of liquid wet wastes o Processing and packaging of other wet wastes Treatment of oily wastes I l o
- o Block diagram sketches of these systems ,
! o Considerations of ALARA.
t i
1 l 1.3 PLANT-SPECIFIC BACKGROUND I
I On behalf of Grand Gulf Nuclear Station Unit 1, the Mississippi Power and l Light Company submitted changes to the existing PCP (1) in the Semiannual j Radioactive Effluent Release Reports issued by the Licensee. The Licensee issued Revision 1 of the PCP in the first 6 months of 1984 (8]. No changes to t
.j PCP were made by the Licensee in the second 6-month period of 1984 (9] and the first 6-month period of 1985 (10).
l c
I
{ ,
- 1J I
?
4 D-13 1l i
I
. . TER-C5506-590 The Licensee's Semiannual Reports and the changes of the PCP were transmitted to an independent review team at the Franklin Research Center (FRC) for review. The review was subsequently conducted by FRC, and the results and conclusions of the PCP evaluation are presented in Sections 3 and 4 of this document.
't 9
+
D-14 g i
J
- 2. REVIEW CRITERIA NUREG-0472 (5] and NUREG-0473 (6] specify that the Licensee develop a PCP to ensure that the processing and packaging of solid radioactive wastes will -
be accomplished in compliance with 10CFR20 (11], 10CFR71 (12], and other federal and state regulations or requirements governing the offsite disposal of the low-level radioactive waste.
The PCP is not intended to concain a set of detailed procedures: rather, it is the source of basic criteria for the detailed procedures to be developed by the Licensee. The criteria used for the PCP are to address only current NRC guidelines (7] and do not include new criteria required by 10CFR61 (13]. .
The PCP should include, but is not limited to, the following:
o A commitment that all liquid wet wastes shall be solidified prior to shipment offsite.
o A commitment'that containers, shipping casks, and methods of .
packaging for liquid wet wastes meet applicable Federal regulations, !
e.g., 10CFR Part 71. !
i o A commitment that radioactive wastes will be shipped to a licensed burial site in accordance with applicable Commission, Department of Transportation, and State regulations, including the burial site regulation requirement.
o A general description of the laboratory mixing of a sample of waste to arrive at process parameters prior to commencing the solidification process.
o A general description of the solidification process including type of solidification agent, process control parameters, parameter boundary conditions, proper waste form properties, and assurance that the solidification systems are operated within the established process parameters.
o A general description of sampling of at least one representative sample from every tenth batch to ensure solidification and the action to be taken if the sample fails to verify solidification.
o The provisions to verify the absence of free liquid.
o The provisions to reprocess containers in which free liquids are detected.
o If the solidification process is exothermic, what process control parameters must be met prior to capping the container?
D-15
. . TER-C5506-590 1
4 o Appropriate statements similar to those for liquid waste should be included for other wet wastes which could include filter sludge, spent powdered resins, spent bead resins, and spent cartridge filter elements.
o A general description of the dewatering technique and control a 6 parameters for other wet wastes. ;
o Provisions to reprocess the other wet wastes through the dewatering system if excess free water is observed should be included.
o A general description for treatment of oily wastes which are to be transported offsite for burial should be included.
o Sketches of the above systems.
o A statement that ALARA considerations were addressed in all phases of ,
the solidification process.
l J
f I
1 L
- .Y l
l t
I i
l' l
l l
0 1
D-16 l
Y .,
f
, . TER-C5506-590 t
- 3. TECHNICAL EVALUATION The Licensee has made a commitment to process all liquid wet wastes prior to shipment offsite and a commitment to comply with Federal regulaticns on shipping and packaging. These commitments satisfy the current NRC guidance.
The Licensee has not made an explicit commitment that radioactive wastes will be shipped to a licensed burial site. Although it may be implied in the Licensee's commitment to employ vendors approved by the NRC, the commitment to ship the radioactive wastes should be clearly stated in.the PCP.
The Licensee has provided a description of a waste stream sample prior to commencing the solidification process. The Licensee has also included a general description of the solidification process including types of solidi-fication agent, process control parameters, parameter boundary conditions, proper waste form properties, and assurance that the solidification systems are operated within established process parameters. The Licensee's descrip-tions are satisfactory and meet the current NRC criteria.
Under the subject of sampling for verification of solidification in the Licensee's PCP, a commitment has been made to verify the solidification on at least every tenth batch of waste. Should trends indicate the possibility of l changing parameters, which may have an effect on the methods and materials i used for solidification, more frequent sampling may be required. The Licensee's commitment to waste solidification meets the NRC criteria.
~
Provisions included in the Licensee's PCP to verify the solidification have, in part, addressed the verification of free-standing liquids. The Licensee has listed a step-by-step procedure for verification of solidifica-tion. For batches of miscellaneous wastes, the Licensee has commited to take a grab sample and follow the verification procedures as stated. The Licensee's approach to verifying the solidification satisfies the current NRC criteria.
The Licensee has not adequately stated the provisions to process containers in which free liquids are detected. The Licensee should expand the commitment to reflect the procedures taken to process the affected containers.
The Licensee has not specifically addressed the following subjects: f l
o whether the solidification is exothermic, and the associated process control parameters to be met prior to capping the containers D-17
- . TER-C5506-590 o a general description of treatment of oily wastes which are to be transported offsite for burial o sketches of the waste processing systems o The ALARA consideration in all phases of the solidification process.
In sununary, except for the deficiencies described above, the Licensee's PCP and the revised changes are generally consistent with the current NRC criteria (7). However, the PCP should be revised in the future to show compliance with 10CFR Part 61 (13] when NRC guidance becomes available.
1 i
l i
t
.a l
l I
1 I
i I
l i
i i
l I
I 1
D-18 .
r 1
- . . . . ~ - -.
n-,. . - - ,
' ~ ~
(. .
. i
- 4. CONCLUSION The Licensee's revision (Rev. 1) to the Process Control Program (PCP Rev.
O, dated April 27, 1982 (1]) submitted by the Licensee in the Semiannual Effluent Release Report [8, 9, 10] for the period of January 1, 1984 through June 30, 1984 [8]j, has been reviewed against the current NRC criteria (7].
It is found that the PCP as revised by the Licensee generally complies with current NRC criteria. However, several deficiencies described in the following were noted. The Licensee should update the PCP to correct these deficiencies. Further, the PCP should be revised in the future to show compliance with 10CFR Part 61 (13] when NRC guidance becomes available.
These deficiencies found in the Licensee's PCP submittal are:
o The Licensee has not made an explicit commitment to ship the radioactive wastes to a licensed burial site.
o The Licensee has not adequately addressed the provisions to process containers in which free liquids are detected.
o The Licenses has not indicated whether the solidification is exothermic, nor has it provided process control parameters to be met prior to capping the containers if the process is exothermic.
o The Licensee has not provided a general description of treatment of oily wastes which are transported offsite for burial.
o The Licensee has not included a general sketch of the waste processing systems in the PCP.
o The Licensee has not addressed the ALARA considerations in all phases of the solificiation process.
l l
l l
l D-19 l
TER-C5506-590 >;
i
- 5. REFERENCES
- 1. Process Control Program for Grand Gulf Nuclear Station Unit 1, Rev. O, Mississippi Power and Light Company NRC Docket No. 50-416 Submittal with letter dated April 27, 1982
- 2. S. Schwencer (NRC/DL)
Letter to J. P. McGaughy, Jr. (MP&L)
Subject:
NRC/DL Approval of Grand Gulf ODCM and PCP NRC Docket N o . 50-416 November 19, 1982
- 3. " Solid Waste Management System," Standard Review Plan, Office of Nuclear Reactor Regulation, Section 11.4, Revision 2, dated July 1981
- 4. Branch Technical Position 11-3, " Design Guidance for Solid Radioactive Waste Management Systems Installed in Light-Water-Cooled Nuclear Power Reactors Plants," attachment to SRP 11.4, Revision 2, July 1981
- 5. NUREG-0472, " Radiological Effluent Technical Specifications for Pressurized Water Reactors," Draft 7", Revision 3, September 1982
- 6. NUREG-0473, " Radiological Effluent Technical Specifications for Bo.iling Water Reactors," Draft 7", Revision 7, September 1982. I
- 7. Letter of transmittal from C. Willis (NRC) to S. Pandey (FRC),
Subject:
" Guidance for Review of the Process Control Program, Enclosure 2," Criteria for Process Control Program, January 7, 1983 PE
- 8. " Semiannual Radioactive Effluent Release Report - January 1 through June 30, 1984," Grand Gulf Nuclear Station Unit 1, Mississippi Power and Light Company NRC Docket No. 50-416
- 9. " Semiannual Radioactive Effluent Release Report - July 1 through December 31, 1984," Grand Gulf Nuclear Station Unit 1, Mississippi Power and Light Company NRC Docket No. 50-416
- 10. " Semiannual Radioactive Effluent Release Report - January 1 through June 30, 1985," Grand Gulf Nuclear Station Unit 1, Mississippi Power and Light Company NRC Docket No. 50-416 l
(
D-20 L
TER-C5506-590
- 11. Title 10, Code of Federal Regulations, Part 20, " Standards for Protection Against Radiation"
- 12. Title 10, Code of Federal Regulations, Part 71, " Packaging and Transportation of Radioactive Material"
- 13. Title 10, Code of Federal Regulations, Part 61, " Licensing Requirements
^
for Land Disposal of Radioactive Waste" i