ML20204J988: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.-        - - _ .        _.        .  -      -        . _ _ .
                        -
':.                                          *
                                        -
                                                                      OCT l 71988
                          *
                                Irf Reply Refer To:                                                                        ;
                                Docket:- STN 50-482/88-26                                                                  !
"
                                                                                                                          :
                                                                                                                          !
lI                              Wolf Creek Nuclear Operating Corporation-                                                  l
;
  '
                                ATTN: Bart D. Withers                                                                      (
                                        President and Chief Executive Officer                                            i
                                P.O. Box 411                                                                              i
j                              Burlington, Kansas 66d39
i                              Gentlemen:
:
!                              This refers to the inspection conducted by Messrs. L. E. Ellershaw,                        l
4                              L. D. Gilbert, and R. G. Taylor of this office during the period                          ,
;                              September 26-30, 1988, of activities authorized by NRC Operating License NPF-42            ;
3
                                for the Wolf Creek Generating Station, and to discussion of our findings with
;                              you and other members of your staff at the conclusion of the inspection.
                                Areas examined during the inspection included your inservice inspection program            !
                                and procedures; welding and nondestructive exa.nination procedures; the program
'
                                                                                                                          !
                                for the control of design changes and modifications; and the program for                  ;
                                control of procurement. These activities ware inspected with respect to their              :
                                relationship to the plant refueling outage scheduled to begin in early                    !
                                October 1988.                                                                              j
~
                                Within these areas, the inspection consisted of selective examination of                  [
:                              procedures and representative records, interviews with personnel, and                      ;
J                              observations by the inspectors. The inspection findings are documented in the
i                              enclosed inspection report.
I
-
                                Within the scope of the inspection, no violations or deviations were                      ,
l                              identified.                                                                                ;
                                                                                                                          :
                                Should you have any questions concerning this inspection, we will be pleased to            '
;                              discuss them with you.
:
.                                                                          Sincerely,                                    ;
j                                                                            Original Signed ny                            l
;                                                                                A. B. Beac
d
                                                                            L. J. Callan,h Director                        (
j                                                                          Division of Reactor Projects                  j
  r                                                                                                                        r
i                              Enclosure.
                                Appendix - NRC Inspection Report
                                                                                                                          '
j
                                  50-482/88-26
q                                                                                                                          l
J                              cc w/ enclosure:                                                                          i
:                              Wolf Creek Nuclear Operating Corporation                                                  ;
j                              ATTN: Otto Maynard, Manager                                                      el      :
2                                          of Licensing                                                    '
                                                                                                                      ,  f
!                              P.O. Box 411                                                                              !
]                              Burlington, Kansas 66839                                                          i      %
                                                                                                                          !
;                                                                                                                          t
i                              *RIV:MQPS:RI*          *RI*            *RI*      *C:M0PS        *D:DRS      0            l
4
                                LGilbert/cjg          LEEllershaw    RTaylor    18arnes        JLMilhoan LJ a lan        f
j                                  / /88                / /88          / /88      / /88          / /88 g @ /88          :
                                *previously concurred                                                                      !
,                              8810250314 881017
'
                                PDR    ADOCK 05000482
                                O                    PDC
    _ _ . _ _ _ _ _ . _ _ , _ _
 
                                                          _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _
    -
  .
                      '
                .
      .  .
        Wolf Creek Nuclear Operating              -2-
          Corporation
        Wolf Creek Nuclear Operating Corporation
        ATTN: Gary Boyer, Plant Manager
        P.O. Box 411
        Burlington, Kansas 66839
'
        Kansas Corporation Commission
        ATTN: Robert D. Elliott, Chief Engineer
        Fourth Floor, Docking State Office Building
        Topeka, Kansas 66612-1571
        Kansas Radiation Control Program DirGctor
        bectoDMB(IE01)
        bec distrib. by RIV:
,
        *RRI                            R. D. Martin, RA
        *SectionChief(DRP/A)          *DRP                                                                    <
        *RPB-DRSS                      B. DeFayette, RIII
        *RIV File                      SRI, Callaway RIII
        * MIS System                  *RSTS Operator
        * Project Engineer, DRP/A      Lisa Shea, RM/ALF
        *P. O'Connor, NRR Project Manager                                                                      :
        *DRS                          ''I. Barnes
i      *L. Gilbert                  *L. Ellershaw
        *R. Taylor
        *w/766
]
                                                                                                                ,
                                                                                                                i
                                                                                                                i
                                                                                                                l
                                                                                                                l
                                                                                                                l
}}
}}

Latest revision as of 11:56, 30 December 2020

Forwards Insp Rept 50-482/88-26 on 880926-30.No Violations or Deviations Identified
ML20204J988
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/17/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20204J992 List:
References
NUDOCS 8810250314
Download: ML20204J988 (2)


See also: IR 05000482/1988026

Text

.- - - _ . _. . - - . _ _ .

-

':. *

-

OCT l 71988

Irf Reply Refer To:  ;

Docket:- STN 50-482/88-26  !

"

!

lI Wolf Creek Nuclear Operating Corporation- l

'

ATTN: Bart D. Withers (

President and Chief Executive Officer i

P.O. Box 411 i

j Burlington, Kansas 66d39

i Gentlemen:

! This refers to the inspection conducted by Messrs. L. E. Ellershaw, l

4 L. D. Gilbert, and R. G. Taylor of this office during the period ,

September 26-30, 1988, of activities authorized by NRC Operating License NPF-42  ;

3

for the Wolf Creek Generating Station, and to discussion of our findings with

you and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included your inservice inspection program  !

and procedures; welding and nondestructive exa.nination procedures; the program

'

!

for the control of design changes and modifications; and the program for  ;

control of procurement. These activities ware inspected with respect to their  :

relationship to the plant refueling outage scheduled to begin in early  !

October 1988. j

~

Within these areas, the inspection consisted of selective examination of [

procedures and representative records, interviews with personnel, and  ;

J observations by the inspectors. The inspection findings are documented in the

i enclosed inspection report.

I

-

Within the scope of the inspection, no violations or deviations were ,

l identified.  ;

Should you have any questions concerning this inspection, we will be pleased to '

discuss them with you.

. Sincerely,  ;

j Original Signed ny l

A. B. Beac

d

L. J. Callan,h Director (

j Division of Reactor Projects j

r r

i Enclosure.

Appendix - NRC Inspection Report

'

j

50-482/88-26

q l

J cc w/ enclosure: i

Wolf Creek Nuclear Operating Corporation  ;

j ATTN: Otto Maynard, Manager el  :

2 of Licensing '

, f

! P.O. Box 411  !

] Burlington, Kansas 66839 i  %

!

t

i *RIV:MQPS:RI* *RI* *RI* *C:M0PS *D:DRS 0 l

4

LGilbert/cjg LEEllershaw RTaylor 18arnes JLMilhoan LJ a lan f

j / /88 / /88 / /88 / /88 / /88 g @ /88  :

  • previously concurred  !

, 8810250314 881017

'

PDR ADOCK 05000482

O PDC

_ _ . _ _ _ _ _ . _ _ , _ _

_ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _

-

.

'

.

. .

Wolf Creek Nuclear Operating -2-

Corporation

Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boyer, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

'

Kansas Corporation Commission

ATTN: Robert D. Elliott, Chief Engineer

Fourth Floor, Docking State Office Building

Topeka, Kansas 66612-1571

Kansas Radiation Control Program DirGctor

bectoDMB(IE01)

bec distrib. by RIV:

,

  • RRI R. D. Martin, RA
  • SectionChief(DRP/A) *DRP <
  • RPB-DRSS B. DeFayette, RIII
  • RIV File SRI, Callaway RIII
  • MIS System *RSTS Operator
  • Project Engineer, DRP/A Lisa Shea, RM/ALF
  • P. O'Connor, NRR Project Manager  :
  • DRS I. Barnes

i *L. Gilbert *L. Ellershaw

  • R. Taylor
  • w/766

]

,

i

i

l

l

l