September 30, 1988 Docket No. 50-482 Mr. Bart D. Withers President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P. O. Box 411
          -      Burlington, Kansas 66839
 
==Dear Mr. Withers:==
 
==SUBJECT:==
WOLF CREEK NUCLEAR GENERATING STATION - TEMPORARY EXEMPTION FROM THE SCHEDULAR REQUIREMENTS OF THE PROFERTY INSURANCE RULE EFFECTIVE OCTOBER 4,1988(10CFR50.54(w)(5)(1))
The Coninissicn has issued the enclosed temporary exerption from the schedular requirerents of the property insurance rule effective October 4,1988(10CFR 50.54(w)(5)(1)) for the Wolf Creek Nuclear Generating Station. This part of the rule requires licensees to obtain insurance policies that prioritize insurance proceeds for stabilization and decontamination after an accident and provide for paynent of proceeds to an independent trustee who would disburse funds for decontamination and cleanup before any other purpose.
The    Comissionschedule the irplenentation  has proposed        a revision for 18 month!    (53 FRof      10 CFR 36338      50.54(w)(5)(1)
September 19, 1988 extending ).
Howeve- because it is unlikely that this rulentaking oction will be completed by October 4,1988, the Conc 11ssion is issuing a tenporary exemption from the requirementsof10CFR50.54(w)(5)(1)untilcompletionofthe i              extending the implementation date specified in 10 CFR 50.54(w)pending              ruleraking (5)(1), but not later than April 1, 1989. Upon completion of such rulemaking, the licensee                    >
shall comply with the provisions of such rule.                                                ,
The Comission, nursuant to 10 CFR 50.1?(a), hereby grants a temporary exemption from tie schedular requirerents of 10 CFR 50.54(w)(5)(1). This temporary exemption is valid until April 1,1989 or until such time as action on this rulemaking is completed.
l l
!                                                                                                                i
                                                                                                                \
l D Po '
SS10140075 880930 PDR                                                                                I ADOCKOr30g2                                                                  /
l
 
Pr. Bart D. Withers                    E-In granting the exemption, the staff has deterrnined that this action is authorized by law and will not endanger life or property or the confron defense and security and is otherwise in the public interest.
This exerrption is being filed with the Office of the Federal Register for publication.
Sincerely, Paul W. O'Connor, Project Panager Project Directorate - IV Division of Reactor Projects - !!!,
IV, V and Special Projects
 
==Enclosure:==
 
As stated cc w/ enclosure:
See next page DISTRIBUTION
          % cket File NRC PCP Local PDR PD4 Reading T. Purley/J. Sniezek D. Crutchfield C. Possi G. Holahan L. Rubenstein M. Virgilio J. Calvo P. Noonan P. O'Connor OGC-Rec 6ville E. Jordan                                                        Ofo/
P. Grirces T.Barnhart(4)                                                        i ACRS (10)
GPA/PA ARP/LFFB PD4 Plant File E. Tourigny FDIV:      $
o.
PDIV:F:      P (v:D          ADP4 Ch'              R$
PNocn a          P0' Conner:kb JCalvo          LRubens  in    GHolahan 0o/>,/E8                      09/p/F8        09//*/08 09f)lf/08                      09/{/88
 
,            Mr. Bart D. Withers                    ) .
In granting the exemption, the staff has determined that this action is authorized i by law and will not endanger life or property or the conron defense and security  !
and is otherwise in the public interest.
l This exernption is being filed with the Office of the Federal Register for publication.                                                                      !
;                                                      Sincerely, i
]                                                                          /k                    ^
Paul W J'Connor, Project Manager        (
Projr.ct Directorate - IV 2
Div',sion of Reactor Projects - III, IV, V and Special Projects l
Enc 1csure:
As, stated cc w/ enclosure:
See next page i
1 P
W l
1                                                                                  .            ;
i l                                                                                                !
i l
1 l
1 l
1 s
1
 
Mr'. Bart D. Withers                    Wolf Creek Generating Station Wolf Creek Nuclear Operating Corporation Unit No. 1 cc:
Jay Silberg, Esq.                        Mr. Gerald Allth Shaw, Pittman, Potts & Trowbridge        Public Health Physicist 1800 M Street, NW                        Bureau of Air Quality & Radiation Washington, D.C. 20036                      Control Division of Environment Chris R. Rogers, P.E.                    Kansas Department of Health Manager, Electric Department              and Environment Public Service Commission                Forbes Field Building 321 P. O. Box 360                            Topeka, Kansas 66620 Jefferson City, Missouri 65102 Mr. Gary Boyer, Plant Manager
* l Regional Administrator, Region III      Wolf Creek Nuclear Operating Corp.
U.S. Nuclear Regulatory Commission      P. O. Box 411 799 Rousevelt Road                      Burlington, Kansas 66839 Glen Ellyn, Illinois 60137 Regional Administrator, Region IV Senior Resident Inspector Nolf Creek    U.S. Nuclear Regulatory Commission l        c/o V. S. Nuclear Regulatory Commission  Office of Executive Director          ;
P. O. Box 311 for Operations
:          Burlington, Kansas 66839                611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Robert Elliot, Chief Engineer Utilities Division                      Mr. Otto Maynard, Manager Licensing Kansas Corporation Commission            Wolf Creek Nuclear Operating Corp.
4th Floor - State Office Building        P. O. Box 411 Topeka, Kansas 66612-1571                Burlington, Kansas 66839 I                                                          .
I t
1
)
l a
l 4
!}}

Latest revision as of 10:35, 17 December 2020

Forwards Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i),effective on 881004
ML20155G090
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/30/1988
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20155G094 List:
References
NUDOCS 8810140075
Download: ML20155G090 (4)


Text

..

+ #o UNITED 8TATES g

[(fat:

g NUCLEAR REGULATORY COMMISSION t ra W ASHING TON, D. C. 20666

\.....)

September 30, 1988 Docket No. 50-482 Mr. Bart D. Withers President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P. O. Box 411

- Burlington, Kansas 66839

Dear Mr. Withers:

SUBJECT:

WOLF CREEK NUCLEAR GENERATING STATION - TEMPORARY EXEMPTION FROM THE SCHEDULAR REQUIREMENTS OF THE PROFERTY INSURANCE RULE EFFECTIVE OCTOBER 4,1988(10CFR50.54(w)(5)(1))

The Coninissicn has issued the enclosed temporary exerption from the schedular requirerents of the property insurance rule effective October 4,1988(10CFR 50.54(w)(5)(1)) for the Wolf Creek Nuclear Generating Station. This part of the rule requires licensees to obtain insurance policies that prioritize insurance proceeds for stabilization and decontamination after an accident and provide for paynent of proceeds to an independent trustee who would disburse funds for decontamination and cleanup before any other purpose.

The Comissionschedule the irplenentation has proposed a revision for 18 month! (53 FRof 10 CFR 36338 50.54(w)(5)(1)

September 19, 1988 extending ).

Howeve- because it is unlikely that this rulentaking oction will be completed by October 4,1988, the Conc 11ssion is issuing a tenporary exemption from the requirementsof10CFR50.54(w)(5)(1)untilcompletionofthe i extending the implementation date specified in 10 CFR 50.54(w)pending ruleraking (5)(1), but not later than April 1, 1989. Upon completion of such rulemaking, the licensee >

shall comply with the provisions of such rule. ,

The Comission, nursuant to 10 CFR 50.1?(a), hereby grants a temporary exemption from tie schedular requirerents of 10 CFR 50.54(w)(5)(1). This temporary exemption is valid until April 1,1989 or until such time as action on this rulemaking is completed.

l l

! i

\

l D Po '

SS10140075 880930 PDR I ADOCKOr30g2 /

l

Pr. Bart D. Withers E-In granting the exemption, the staff has deterrnined that this action is authorized by law and will not endanger life or property or the confron defense and security and is otherwise in the public interest.

This exerrption is being filed with the Office of the Federal Register for publication.

Sincerely, Paul W. O'Connor, Project Panager Project Directorate - IV Division of Reactor Projects - !!!,

IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION

% cket File NRC PCP Local PDR PD4 Reading T. Purley/J. Sniezek D. Crutchfield C. Possi G. Holahan L. Rubenstein M. Virgilio J. Calvo P. Noonan P. O'Connor OGC-Rec 6ville E. Jordan Ofo/

P. Grirces T.Barnhart(4) i ACRS (10)

GPA/PA ARP/LFFB PD4 Plant File E. Tourigny FDIV: $

o.

PDIV:F: P (v:D ADP4 Ch' R$

PNocn a P0' Conner:kb JCalvo LRubens in GHolahan 0o/>,/E8 09/p/F8 09//*/08 09f)lf/08 09/{/88

, Mr. Bart D. Withers ) .

In granting the exemption, the staff has determined that this action is authorized i by law and will not endanger life or property or the conron defense and security  !

and is otherwise in the public interest.

l This exernption is being filed with the Office of the Federal Register for publication.  !

Sincerely, i

] /k ^

Paul W J'Connor, Project Manager (

Projr.ct Directorate - IV 2

Div',sion of Reactor Projects - III, IV, V and Special Projects l

Enc 1csure:

As, stated cc w/ enclosure:

See next page i

1 P

W l

1 .  ;

i l  !

i l

1 l

1 l

1 s

1

Mr'. Bart D. Withers Wolf Creek Generating Station Wolf Creek Nuclear Operating Corporation Unit No. 1 cc:

Jay Silberg, Esq. Mr. Gerald Allth Shaw, Pittman, Potts & Trowbridge Public Health Physicist 1800 M Street, NW Bureau of Air Quality & Radiation Washington, D.C. 20036 Control Division of Environment Chris R. Rogers, P.E. Kansas Department of Health Manager, Electric Department and Environment Public Service Commission Forbes Field Building 321 P. O. Box 360 Topeka, Kansas 66620 Jefferson City, Missouri 65102 Mr. Gary Boyer, Plant Manager

  • l Regional Administrator, Region III Wolf Creek Nuclear Operating Corp.

U.S. Nuclear Regulatory Commission P. O. Box 411 799 Rousevelt Road Burlington, Kansas 66839 Glen Ellyn, Illinois 60137 Regional Administrator, Region IV Senior Resident Inspector Nolf Creek U.S. Nuclear Regulatory Commission l c/o V. S. Nuclear Regulatory Commission Office of Executive Director  ;

P. O. Box 311 for Operations

Burlington, Kansas 66839 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Robert Elliot, Chief Engineer Utilities Division Mr. Otto Maynard, Manager Licensing Kansas Corporation Commission Wolf Creek Nuclear Operating Corp.

4th Floor - State Office Building P. O. Box 411 Topeka, Kansas 66612-1571 Burlington, Kansas 66839 I .

I t

1

)

l a

l 4

!