ML20195D923: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.
                                          '
  6                                    '
                                              .
                                                      .                            OCT 2 81938
                                              In Reply Refer To:
                                            Docket: STN 50-482/88-24
                                            Wolf Creek Nuclear Operating Corporation
                                            ATTN: Bart D. Withers
                                                    President and Chief Executive Officer
                                            P.O. Box 411
                                            Burlington, Kansas 66839
                                            Centlemen:
                                            This refers to the inspection conducted by Messrs. B. L. Bartlett and
                                            M. E. Skow of this office during the period September 1-30, 1988, of act;    'ies
                                            authorized by NRC Operating License No. NPF-42 for the Wolf Creek Generat, j
                                            Station, and to the discussion of our findings with Mr. G. D. Boyer and other
                                            members of your staff at the conclusion of the inspection.
                                            Areas examined during the inspection included plant status, followup on a
                                            previously identified NRC iten, review of licensee event reports, operational
                                            safety verification, monthly surveillance observation, monthly maintenance
                                            observation, onsite event followup, preparation for refueling, physical
                                              security verification, and radiologic;l protection. Within these areas, the
                                              inspection consisted of selective examination of procedures and representative
                                              records, interviews with personnel, and observations by the NRC inspectors.
                                            The inspection findings are documented in the enclosed inspection report.
                                            During this inspection, it was found that certain of your activities were in
                                            violation of NRC requirements. Consequently, you are required to respond to
                                              these violations, in writing, in accordance with the provisions of
                                            Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
                                            Federal Regulations. Your response should be based on the specifics contained
                                              in the Notice of Violation enclosed with this letter.                              !
                                            We have also examined actions you have taken with regard to a previously              i
                                              identified inspection finding. The status of this item is identified in
                                            paragraph 3 of the enclosed report.
                                                                                                                                  i
l
t
                                            '
                                            P      :          P                SA          C PSA          D:YP
l                                          NESkow            dLBartlett      ATHowell      DDChanberlain LJCallan
                                                                                                                            I
                                            M /27/88        p M /88        g /2 788      g /r7/88        g/ ts/88
'
                                                                                                                              Y/
                                                6811070195 ssio;s
                                                PDR    ADOCK 0".0004s2
                                                O                  PDC
l
l _ _ _ _ _ - - _ _ - _ - _ _ _ _ _ _ .                          ._
 
                                                                            _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ . _ - _ _ _ _ _ _ - _ -
        '
    i.
      -
            ,
                    ,
          Wolf Creek Nuclear Operating                2
              Corporation
          The response directed by this letter and the accompanying Notice is not subject
          to the clearance procedures of the Office of Management and Budget as required
          by the Paperwork Reduction Act of 1980, PL 96-511.
          Should you have any questions concerning this inspection, we will be pleased to                                                i
          discuss them with you.                                                                                                        ,
                                                                                                                                          I
                                              Sincerely,                                                                                I
                                              L. J. Callan, Director
                                              Division of Reactor Projects                                                              I
          Enclosures:
          1.  Appendix A - Notice of Violation
          2.  Appendix B - NRC Inspection Report
                  50-482/88-24
          cc w/ enclosures:
          Otto L. Maynard, Manager of Licensing                                                                                        ,
          Wolf Creek Nuclear Operating Corporation                                                                                      !
          P.O. Box 411                                                                                                                  t
;l
          Burlington, Kansas 66839                                                                                                      1
i
                                                                                                                                        !
I        Gary Boyer, Plant Manager                                                                                                    i
;          Wolf Creek Nuclear Operating Corporation                                                                                      f
!
          P.O. Box 411                                                                                                                  !
-          Burlington, Kansas 66839                                                                                                      [
          Mr. Robert D. Elliott, Chief Engineer                                                                                        !
          Kansas Corporation Comission
,
          Fourth Floor, Docking State Office Bldg.                                                                                      I
l        Topeka, Kansas 66612-1571
                                                                                                                                        i
          Kansas Radiation Control Program Director                                                                                    l
                                                                                                                                        '
i                                                                                                                                      ,
          bec to DMB (IE01)                                                                                                            l
.l        bec distrib. by RIV.                                                                                                          i
>
          *DRP                          Myron Karman, ELD, MNBB (1)                                                                    ,
1
          *RRI                          R. D. Martin, RA                                                                              "
          *SectionChief,(PS/A)          DRP                                                                                            r
          *RSPB-DRSS                    J. M. Hinds, Rill                                                                              i
          *RlY File                      Callaway RRI, Rlll                                                                            j
          * Project Engineer, DRP/A      DRS                                                                                            ,
          * MIS System                                                                                                                  '
          *RSTS Operator                *L. Shea, RM/ALF
            D. Picket, NRR PM                                                                                                            ,
          *w/766                                                                                                                        (
                                                                                                                                        t
                                                                                                                                        t
4
}}
}}

Latest revision as of 17:33, 16 December 2020

Forwards Insp Rept 50-482/88-24 on 880801-30 & Notice of Violation
ML20195D923
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/28/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20195D927 List:
References
NUDOCS 8811070193
Download: ML20195D923 (2)


See also: IR 05000482/1988024

Text

.

'

6 '

.

. OCT 2 81938

In Reply Refer To:

Docket: STN 50-482/88-24

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Centlemen:

This refers to the inspection conducted by Messrs. B. L. Bartlett and

M. E. Skow of this office during the period September 1-30, 1988, of act; 'ies

authorized by NRC Operating License No. NPF-42 for the Wolf Creek Generat, j

Station, and to the discussion of our findings with Mr. G. D. Boyer and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, followup on a

previously identified NRC iten, review of licensee event reports, operational

safety verification, monthly surveillance observation, monthly maintenance

observation, onsite event followup, preparation for refueling, physical

security verification, and radiologic;l protection. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.  !

We have also examined actions you have taken with regard to a previously i

identified inspection finding. The status of this item is identified in

paragraph 3 of the enclosed report.

i

l

t

'

P  : P SA C PSA D:YP

l NESkow dLBartlett ATHowell DDChanberlain LJCallan

I

M /27/88 p M /88 g /2 788 g /r7/88 g/ ts/88

'

Y/

6811070195 ssio;s

PDR ADOCK 0".0004s2

O PDC

l

l _ _ _ _ _ - - _ _ - _ - _ _ _ _ _ _ . ._

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ . _ - _ _ _ _ _ _ - _ -

'

i.

-

,

,

Wolf Creek Nuclear Operating 2

Corporation

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to i

discuss them with you. ,

I

Sincerely, I

L. J. Callan, Director

Division of Reactor Projects I

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-482/88-24

cc w/ enclosures:

Otto L. Maynard, Manager of Licensing ,

Wolf Creek Nuclear Operating Corporation  !

P.O. Box 411 t

l

Burlington, Kansas 66839 1

i

!

I Gary Boyer, Plant Manager i

Wolf Creek Nuclear Operating Corporation f

!

P.O. Box 411  !

- Burlington, Kansas 66839 [

Mr. Robert D. Elliott, Chief Engineer  !

Kansas Corporation Comission

,

Fourth Floor, Docking State Office Bldg. I

l Topeka, Kansas 66612-1571

i

Kansas Radiation Control Program Director l

'

i ,

bec to DMB (IE01) l

.l bec distrib. by RIV. i

>

  • DRP Myron Karman, ELD, MNBB (1) ,

1

  • RRI R. D. Martin, RA "
  • SectionChief,(PS/A) DRP r
  • RSPB-DRSS J. M. Hinds, Rill i
  • RlY File Callaway RRI, Rlll j
  • Project Engineer, DRP/A DRS ,
  • MIS System '
  • RSTS Operator *L. Shea, RM/ALF

D. Picket, NRR PM ,

  • w/766 (

t

t

4