OCT 2 81938
6
'
.
.
In Reply Refer To:
Docket: STN 50-482/88-24
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Centlemen:
This refers to the inspection conducted by Messrs. B. L. Bartlett and
M. E. Skow of this office during the period September 1-30, 1988, of act;
'ies
authorized by NRC Operating License No. NPF-42 for the Wolf Creek Generat, j
Station, and to the discussion of our findings with Mr. G. D. Boyer and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, followup on a
previously identified NRC iten, review of licensee event reports, operational
safety verification, monthly surveillance observation, monthly maintenance
observation, onsite event followup, preparation for refueling, physical
security verification, and radiologic;l protection. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
!
We have also examined actions you have taken with regard to a previously
i
identified inspection finding. The status of this item is identified in
paragraph 3 of the enclosed report.
i
l
t
'
YP
P
P
C PSA
D:
l
NESkow
dLBartlett
ATHowell
DDChanberlain LJCallan
I
M /27/88
p M /88
g /2 788
g /r7/88
g/ s/88
t
Y/
'
6811070195 ssio;s
ADOCK 0".0004s2
O
l
l
- -
-
-
.
.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
. _ - _ _ _ _ _ _ - _ -
'
i.
-
,
,
Wolf Creek Nuclear Operating
2
Corporation
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
i
discuss them with you.
,
I
Sincerely,
I
L. J. Callan, Director
Division of Reactor Projects
I
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/88-24
cc w/ enclosures:
Otto L. Maynard, Manager of Licensing
,
Wolf Creek Nuclear Operating Corporation
!
P.O. Box 411
t
- l
Burlington, Kansas 66839
1
!
i
I
Gary Boyer, Plant Manager
i
Wolf Creek Nuclear Operating Corporation
f
P.O. Box 411
!
!
Burlington, Kansas 66839
[
-
Mr. Robert D. Elliott, Chief Engineer
!
Kansas Corporation Comission
Fourth Floor, Docking State Office Bldg.
I
,
l
Topeka, Kansas 66612-1571
i
Kansas Radiation Control Program Director
l
i
',
bec to DMB (IE01)
l
.l
bec distrib. by RIV.
i
- DRP
Myron Karman, ELD, MNBB (1)
>
,
- RRI
R. D. Martin, RA
"
1
- SectionChief,(PS/A)
r
- RSPB-DRSS
J. M. Hinds, Rill
i
- RlY File
Callaway RRI, Rlll
j
- Project Engineer, DRP/A
,
- MIS System
'
- RSTS Operator
- L. Shea, RM/ALF
,
- w/766
(
t
t
4
- _ -
.-,
.
- -
- -
-
. - . . -
.
-
-
- -
-
.
-
.
.