IR 05000382/2018003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/30/2018
| issue date = 10/30/2018
| title = NRC Integrated Inspection Report 05000382/2018003
| title = NRC Integrated Inspection Report 05000382/2018003
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Dinelli J
| addressee name = Dinelli J
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:/RA/
{{#Wiki_filter:ber 30, 2018


Loading of Dry Fuel Storage Cask #18, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Loading of Dry Fuel Storage Cask #19, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Loading of Dry Fuel Storage Cask #23, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/RCP 1B Motor ReplacementErect/Dismantle Scaffolding in the Reactor Containment BuildingReactor Disassembly ActivitiesReactor Reassembly ActivitiesRadiation Protection to Perform Job Coverage, Routine Surveys, Inspections and WalkdownsRadwaste Processing/Shipping in all Radiologically Controlled Areas
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000382/2018003


ims.certrec.com
==Dear Mr. Dinelli:==
On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Waterford Steam Electric Station, Unit 3. On October 11, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff.
 
The results of this inspection are documented in the enclosed report.
 
The NRC inspectors did not identify any finding or violation of more than minor significance.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Neil OKeefe, Chief Branch D Division of Reactor Projects Docket No. 50-382 License No. NPF-38 Enclosure:
Inspection Report 05000382/2018003 w/ Attachments:
1. Documents Reviewed 2. NRC Request for Information
 
U.S. NUCLEAR REGULATORY COMMISSION
 
==Inspection Report==
Docket Number(s): 05000382 License Number(s): NPF-38 Report Number(s): 05000382/2018003 Enterprise Identifier: 1-2018-003-0002 Licensee: Entergy Operations, Inc.
 
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, Louisiana Inspection Dates: July 1, 2018 to September 30, 2018 Inspectors: F. Ramírez, Senior Resident Inspector C. Speer, Resident Inspector J. Dixon, Senior Project Engineer T. Farina, Senior Operations Engineer P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, PhD, Senior Health Physicist I. Anchondo, Reactor Inspector, Engineering Branch 2 G. George, Senior Reactor Inspector, Engineering Branch 1 Approved By: Neil OKeefe Branch Chief Division of Reactor Projects Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.
 
Additional Tracking Items Type    Issue number              Title                            Report          Status Section URI      05000382/2017008-04      Potential Failure to Obtain a    71111.21M      Closed License Amendment for Changes to Diesel Generator Surveillance Test Interval
 
=PLANT STATUS=
 
The plant operated at or near rated thermal power for the entire inspection period.
 
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
==REACTOR SAFETY==
 
===71111.01Adverse Weather Protection    External Flooding ===
{{IP sample|IP=IP 71111.01|count=1}}
The inspectors evaluated readiness to cope with external flooding in the safety-related switchgear room A on August 1, 2018.
 
===71111.04Equipment Alignment    Partial Walkdown ===
{{IP sample|IP=IP 71111.04|count=4}}
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Shield building ventilation train A with train B out of service for maintenance on July 17, 2018
: (2) Auxiliary feedwater system following an extended system outage on August 19, 2018
: (3) Emergency feedwater train A with train B out of service for maintenance on August 21, 2018
: (4) Emergency diesel generator A with emergency diesel generator B out of service for maintenance on September 11, 2018
 
===Completed Walkdown (1 Sample)===
The inspectors evaluated system configurations during a complete walkdown of the reactor    auxiliary building controlled ventilation area system on September 12, 2018.
 
===71111.05AQFire Protection Annual/Quarterly Quarterly Inspection ===
{{IP sample|IP=IP 71111.05|count=5}}
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Fire area NS-TB-001, turbine building +15.00 east on July 18,2018
: (2) Fire area NS-TB-003, turbine building mezzanine +40.00 east on August 19, 2018
: (3) Fire area RAB 34-001, safeguards valve gallery rooms A and B on August 21, 2018
: (4) Fire area NS-TB-004, turbine building +40.00 west on August 22, 2018
: (5) Fire area RAB2-001, heating and ventilation mechanical room on September 11, 2018
 
===Annual Inspection (1 Sample)===
The inspectors evaluated fire brigade performance during an unannounced fire drill in the    +35 reactor auxiliary building electrical penetration B area on September 21, 2018.
 
===71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification ===
{{IP sample|IP=IP 71111.11|count=1}}
The inspectors observed and evaluated requalification scenario in the simulator on July 23, 2018.
 
===Operator Performance (1 Sample)===
The inspectors observed and evaluated control room performance during control element    assembly testing on August 3, 2018.
 
===Operator Exams (1 Sample)===
The inspector reviewed and evaluated requalification examination results on August 27,    2018.
 
===71111.12QMaintenance Rule Implementation Routine Maintenance Effectiveness ===
{{IP sample|IP=IP 71111.12|count=2}}
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Dry cooling tower sump pump failures on July 24, 2018
: (2) Controlled ventilation area system routine assessment of maintenance on August 8, 2018
 
===71111.13Maintenance Risk Assessments and Emergent Work Control ===
{{IP sample|IP=IP 71111.13|count=5}}
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Emergent work related to electrical bus 31AB on July 25, 2018
: (2) Risk assessment associated with work in the transformer yard on August 13, 2018
: (3) Planned yellow risk due to emergency feedwater system train B work window on August 21, 2018
: (4) Planned yellow risk due to emergency diesel generator B work window on September 10, 2018
: (5) Planned yellow risk due to emergency diesel generator A work window on September 27, 2018
 
===71111.15Operability Determinations and Functionality Assessments ===
{{IP sample|IP=IP 71111.15|count=4}}
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) Operability determination for charging pump B due to relay calibration values found out of tolerance on July 19, 2018
: (2) Functionality assessment for motor generator set B due to high vibrations on July 31, 2018
: (3) Operability determination for emergency diesel generator B due to low field voltage and current during testing on August 6, 2018
: (4) Operability determination for emergency diesel generator B subgroup relays due to the failure of the safety injection actuation signal relay on August 21, 2018
 
===71111.18Plant Modifications ===
{{IP sample|IP=IP 71111.18|count=2}}
The inspectors evaluated the following temporary modification:
: (1) Temporary replacement of failed pressurizer proportional heater bank 1 heaters 3 and 4 with heaters from backup bank 2 and 3 on August 1, 2018
: (2) Ultimate heat sink margin restoration Phase 3 permanent modification on August 15, 2018
 
===71111.19Post Maintenance Testing ===
{{IP sample|IP=IP 71111.19|count=6}}
The inspectors evaluated the following post maintenance tests:
: (1) Train A sequencer following relay replacement on August 6, 2018
: (2) Charging pump A after seal pump/motor and gearbox replacement on August 9, 2018
: (3) Auxiliary feedwater pump to motor coupling removal/reinstallation and pump outboard bearing gasket replacement on August 14, 2018
: (4) Reactor auxiliary building +46 HVAC air handling unit following planned maintenance on September 5, 2018
: (5) Auxiliary component cooling water pump B following emergent bearing oil replacement on September 18, 2018
: (6) Emergency diesel generator A following planned relay replacement on September 27, 2018
 
===71111.22Surveillance Testing The inspectors evaluated the following surveillance tests:    Routine ===
{{IP sample|IP=IP 71111.22|count=5}}
: (1) Emergency feedwater pump A operability run on July 10, 2018
: (2) High pressure safety injection pump B operability run on July 25, 2018
: (3) Reactor trip circuit breaker #5 test on August 1, 2018
: (4) Core protection calculator A test on August 2, 2018
: (5) Control room emergency filtration unit outside air intake upstream isolation valve test on August 14, 2018
 
===71114.02Alert and Notification System Testing ===
{{IP sample|IP=IP 71114.02|count=1}}
The inspector evaluated the maintenance and testing of the alert and notification system on August 1, 2018.
 
===71114.03Emergency Response Organization Staffing and Augmentation System ===
{{IP sample|IP=IP 71114.03|count=1}}
The inspector evaluated the readiness Emergency Preparedness Organization on August 2, 2018.
 
===71114.04Emergency Action Level and Emergency Plan Changes ===
{{IP sample|IP=IP 71114.04|count=2}}
The inspector evaluated submitted changes to the Waterford 3 Steam Electric Station Emergency Plan, Revision 49, and Procedure EP-001-001, Recognition and Classification of Emergency Conditions, Revision 33, between July 9 and 12, 2018. This evaluation does not constitute NRC approval.
 
===71114.05Maintenance of Emergency Preparedness ===
{{IP sample|IP=IP 71114.05|count=1}}
The inspector evaluated the maintenance of the emergency preparedness program on August 6 and 7, 2018.
 
===71114.06Drill Evaluation    Emergency Planning Drill ===
{{IP sample|IP=IP 71114.06|count=1}}
The inspectors evaluated an emergency planning drill on August 29,
 
==RADIATION SAFETY==
 
===71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls    Radiological Work Planning ===
{{IP sample|IP=IP 71124.02|count=1}}
The inspector evaluated the licensees radiological work planning by reviewing the following activities:
: (1) RWP 2016-0118, Loading of Dry Fuel Storage Cask #18, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 02
: (2) RWP 2016-0119, Loading of Dry Fuel Storage Cask #19, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 01
: (3) RWP 2016-0123, Loading of Dry Fuel Storage Cask #23, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 00
: (4) RWP 2017-0515, RCP 1B Motor Replacement, Revision 00
: (5) RWP 2017-0610, Erect/Dismantle Scaffolding in the Reactor Containment Building, Revision 00
: (6) RWP 2017-0702, Reactor Disassembly Activities, Revision 00
: (7) RWP 2017-0705, Reactor Reassembly Activities, Revision 00
: (8) RWP 2018-0001, Radiation Protection to Perform Job Coverage, Routine Surveys, Inspections and Walkdowns, Revision 00
: (9) RWP 2018-0006, Radwaste Processing/Shipping in all Radiologically Controlled Areas, Revision 00 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
The inspectors evaluated dose estimates and exposure tracking.
 
===71124.04Occupational Dose Assessment    Source Term Characterization ===
{{IP sample|IP=IP 71124.04|count=1}}
The inspectors evaluated the licensees source term characterization.
 
===External Dosimetry (1 Sample)===
The inspectors evaluated the licensees external dosimetry program.
 
===Internal Dosimetry (1 Sample)===
The inspectors evaluated the licensees internal dosimetry program.
 
===Special Dosimetric Situations (1 Sample)===
The inspectors evaluated the licensees performance for special dosimetric situations.
 
==OTHER ACTIVITIES - BASELINE==
 
===71151Performance Indicator Verification ===
{{IP sample|IP=IP 71151|count=6}}
The inspectors verified licensee performance indicators submittals listed below:
: (1) MS08: Heat Removal Systems (07/01/2017-06/30/2018)
: (2) MS09: Residual Heat Removal Systems (07/01/2017-06/30/2018)
: (3) MS10: Cooling Water Support Systems (07/01/2017-06/30/2018)
: (4) EP01: Drill/Exercise Performance Sample (10/01/2017-06/30/2018)
: (5) EP02: Emergency Response Organization Drill Participation Sample (10/01/2017-06/30/2018)
: (6) EP03: Alert And Notification System Reliability Sample (10/01/2017-06/30/2018)
 
===71152Problem Identification and Resolution    Annual Follow-up of Selected Issues ===
{{IP sample|IP=IP 71152|count=2}}
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Process analog control card failures that resulted in a Part 21 report to the NRC on September 6, 2018
: (2) Maintenance rule failure classification of the fast bus transfer failure during the Notification of Unusual Event in June 2017 on September 13, 2018
 
===71153Follow-up of Events and Notices of Enforcement Discretion    Licensee Event Reports ===
{{IP sample|IP=IP 71153|count=2}}
The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:
: (1) Licensee Event Reports 05000382/2018-002-00 and 05000382/2018-002-01, Unplanned Loss of a Train of Control Room Outside Air Intake Radiation Monitors Results in a Condition Prohibited by Technical Specifications, on August 16, 2018.
: (2) Licensee Event Report 05000382/2017-002-01, Automatic Reactor Scram due to the Failure of Fast Dead Bus Transfer Relays to Automatically Transfer Station Load to Off-Site Power on a Main Generator Trip, on August 16,
 
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
 
==INSPECTION RESULTS==
Unresolved Item    Potential Failure to Obtain a License Amendment for              7111.21M (Closed)        Changes to Diesel Generator Surveillance Test Interval URI 05000382/2017008-04
 
=====Description:=====
U.S. Nuclear Regulatory Commission (NRC) Design Bases Assurance Inspection Report 05000382/2017008 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML17362A424), dated December 28, 2017, documents Unresolved Item 05000382/2017008-04, Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval. During that inspection, the team reviewed the licensees change to the surveillance test intervals for the train A and B emergency diesel generators, which was completed in accordance with the Waterford surveillance frequency control program. As a result, both emergency diesel generators went from being tested every 18 months to each emergency diesel generator being tested every 36 months. The team concluded that the license had failed to correctly evaluate the change in accordance with the surveillance frequency control program change process per NEI 04-10, Risk Informed Method for Control of Surveillance Frequencies, Revision 1. Specifically, the licensee had not correctly evaluated NEI 04-10, step 1, Check for Prohibitive Commitments, and step 2, Can Commitments be Changed? of the change process. During the inspection, the team determined that this change would have necessitated a 10 CFR 50.59 safety evaluation and subsequent license amendment because it would have resulted in more than a minimal increase in likelihood of a malfunction of a component important to safety as previously described in the final safety analysis report. At the conclusion of the inspection, the team decided to address this item pending the review of the licensees previously documented corrective actions associated with the potential issue.
 
Since the conclusion of the inspection, the regulatory applicability of this unresolved item was addressed in NRC letter to Byron Generating Station, dated July 23, 2018, (ADAMS Accession Number ML18204A144). The letter documents the withdrawal of a non-cited violation associated with 10 CFR 50.59 requirements applicable to changes in surveillance test intervals of emergency diesel generators. The review was conducted by an independent NRC panel and the outcome was documented, in part, as follow; In NEI 04-10 Step 2, a check is made to determine if the applicable regulatory commitments to the NRC can be changed. Evaluating changes to regulatory commitments is a separate activity based on a method acceptable to the NRC for managing and changing regulatory commitments (e.g., NEI 99-04). NEI 99-04 Section 3.1, Definitions, defines a regulatory commitment as an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC. A regulatory commitment is an intentional undertaking by the licensee to
: (1) restore compliance with regulatory requirements, or
: (2) complete a specific action to address an NRC issue or concern (e.g., generic letter, bulletin, order, etc.)...Thus, there was no associated regulatory commitment to change under NEI 04-10 Step 2, and it was appropriate for the licensee to continue to step through the NDE 04-10 process to evaluate an EDG surveillance frequency change.
 
Therefore, given the circumstances for the non-cited violation withdrawal and its applicability to this unresolved item, the NRC has concluded that there is no violation and no license amendment was required. This item is closed.
 
Corrective Action Reference(s): N/A
 
==EXIT MEETINGS AND DEBRIEFS==
On August 9, 2018, the inspector presented the emergency preparedness inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff. The inspector verified that no proprietary information was retained or documented in this report.
 
On August 27, 2018, the inspector presented the annual requalification inspection results to Mr. D. Constance, Operations Training Superintendent. The inspector verified no proprietary information was retained or documented for this inspection report.
 
On September 13, 2018, the inspector presented the baseline radiation safety inspection results to Mr. S. Vazquez, General Manager of Plant Operations, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.
 
On October 11, 2018, the inspector presented the quarterly resident inspector inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
 
=DOCUMENTS REVIEWED=
 
71111.01 - Adverse Weather Protection
Condition Reports
CR-WF3-2018-04408
Procedures
Number                Title                                              Revision
EN-LI-100            Process Applicability Determination                10
OP-901-521            Severe Weather and Flooding                        326
Drawings
Number                Title                                              Date
G-580                Nuclear Plant Island Structure Flood Wall          July 10, 2018
Penetrations, Sheet 1
G-580                Nuclear Plant Island Structure Flood Wall          April 3, 2011
Penetrations, Sheet 2
G-580                Nuclear Plant Island Structure Flood Wall          April 25, 1991
Penetrations, Sheet 3
71111.04 - Equipment Alignment
Condition Reports
CR-WF3-2017-01509    CR-WF3-2017-04445        CR-WF3-2018-04638  CR-WF3-2017-07561
CR-WF3-2017-07550
Work Orders
00475847              00476848                00433888            00397848
00427894              00468224                00467879            00435999
Procedures
Number              Title                                              Revision
OP-008-008          Shield Building Ventilation                        10
OP-003-035          Auxiliary Feedwater                                309
OP-009-003          Emergency Feedwater                                309
OP-009-002          Emergency Diesel Generator                          346
OP-002-010          Reactor Auxiliary Building HVAC and Containment    312
Purge
71111.05 - Fire Protection
Procedures
Number        Title                                                        Revision
NS-TB-001      Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +15.00  4
East
NS-TB-003      Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +40.00  1
East
RAB 34-001    Waterford-3 S.E.S Pre-Fire Strategy Elev. -15.50 RAB (RCA)    8
NS-TB-004      Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +40.00  1
West
RAB 2-001      Waterford-3 S.E.S Pre-Fire Strategy Elev. +46.00 RAB (RCA)  13
EN-TQ-125      Fire Brigade Drills                                          6
RAB 6-001      Waterford-3 S.E.S Pre-Fire Strategy Elev. +35.00 RAB          9
Miscellaneous
Documents
Number                  Title                                                Date
Waterford 3 Fire Brigade Drill 2018 Completion      September
Tracking Matrix                                      2018
Waterford 3 Fire Brigade Drill 2017 Completion      September
Tracking Matrix                                      2018
Waterford 3 Fire Brigade Drill 2016 Completion      September
Tracking Matrix                                      2018
71111.11 - Licensed Operator Requalification
Condition Reports
CR-WF3-2018-03123        CR-WF3-2018-03213      CR-WF3-2018-03085      CR-WF3-2017-06573
CR-WF3-2016-05408        CR-WF3-2016-07255      CR-WF3-2018-02492      CR-WF3-2017-00464
CR-WF3-2017-02044        CR-WF3-2017-01218      CR-WF3-2017-01623      CR-WF3-2017-03600
Procedures
Number              Title                                                Revision
OP-100-010          Equipment Out of Service                            316
OP-901-110          Pressurizer Level Control Malfunction                11
OP-901-220          Loss of Condenser Vacuum                            303
OP-901-212          Rapid Plant Power Reduction                          10
OP-902-000          Standard Post Trip Actions                          16
OP-902-001          Reactor Trip Recovery                                16
OP-902-008          Functional Recovery                                  27
OP-902-009          Standard Appendices                                  317
EP-001-001          Recognition & Classification of Emergency Conditions 33
OP-903-005          Control Element Assembly Operability Check          14
OP-903-094          ESFAS Subgroup Relay Test - Operating                31
Miscellaneous
Documents                                                                Revision
Number                Title                                              or Date
WSXM-LOR-184EXM 2018 Cycle 4 Annual Simulator Exam - Week 3              E-214
Annual Requalification Results Summary              August 20,
2018
71111.13 - Maintenance Risk Assessment and Emergent Work Review
Condition Reports
CR-WF3-2018-04154    CR-WF3-2018-04156      CR-WF3-2018-04180    CR-WF3-2018-05046
Work Orders
00432117              00427084                00432121
Procedures
Number              Title                                                Revision
EN-FAP-WM-107        Emergent Issues Process                              1
EN-MA-125            Troubleshooting Control and Maintenance Activities  22
EN-WM-104            On Line Risk Management                              17
OI-037-000          Operations Risk Assessment Guideline                313
EN-WM-104            On Line Risk Management                              18
EN-OP-119            Protected Equipment Postings                        9
Miscellaneous
Documents
Number                  Title                                            Date
EN-OP-119 Att. 9.1      Protected Equipment Postings List for Emergency  September 23,
Diesel Generator A work window                    2018
EN-OP-119 Att. 9.1      Protected Equipment Postings List for Emergency  August 20,
Feedwater 228A and 224A                          2018
71111.15 - Operability Evaluations
Condition Reports
CR-WF3-2018-04025      CR-WF3-2018-04021        CR-WF3-2018-04114  CR-WF3-2018-04709
Procedures
Number                  Title                                                  Revision
OP-008-008              Shield Building Ventilation                            10
OP-903-068              Emergency Diesel Generator and Subgroup Relay          321
Operability Verification
71111.18 - Plant Modifications
Condition Reports
CR-WF3-2017-02774      CR-WF3-2018-04367        CR-WF3-2018-04296  CR-WF3-2018-04677
Procedures
Number                  Title                                                  Revision
EN-DC-136              Temporary Modifications                                17
OP-001-001              Reactor Coolant System Fill and Vent                  35
OP-903-097              Pressurizer Heater Capacity Verification              12
OP-901-502              Evacuation of Control Room and Subsequent Plant        35
Cooldown
Drawings
Number              Title                                                        Revision
5817-14492          UHS Air Deflector Structure Details Sheets 1 - 41
B424 Sheet 291      Pressurizer Proportional Heater Bank-1                        18
B424 Sheet 286      Pressurizer Backup Heaters Bank 2                            20
B424 Sheet 287      Pressurizer Backup Heaters Bank 3                            18
B289 Sheet 23A1      480V Switchgear 3A32 Programmer Settings                      8
B289 Sheet 23        Power Distribution and Motor Data 480V Switchgear 3A32        17
One Line Diagram
B289 Sheet 101      Power Distribution and Motor Data 480V Distribution Panels    6
B289 Sheet 158      Power Distribution and Motor Data 480V Switchgear Front      13
View
Miscellaneous
Documents
Number              Title                                                        Revision
EC-71594            Temporary Replace Failed Proportional Heater Bank 1          0
Heaters 3 (position F2) and 4 (position H2) with heaters from
Backup Bank 2and 3 (positions E1 and C2)
EC-54532            Ultimate Heat Sink Margin Restoration - Phase 3              0
EC-52043            Ultimate Heat Sink Margin Restoration                        0
71111.19 - Post-Maintenance Testing
Condition Reports
CR-WF3-2018-04419      CR-WF3-2018-07223      CR-WF3-2018-04415      CR-WF3-2018-01508
CR-WF3-2018-01004      CR-WF3-2018-00589      CR-WF3-2017-05397      CR-WF3-2018-04463
CR-WF3-2017-01483      CR-WF3-2017-05329      CR-WF3-2018-04444      CR-WF3-2017-04606
CR-WF3-2018-04632      CR-WF3-2018-05448
Work Orders
00496628              00434744                00364478                52735553
00450472              52756221                52713822                52746212
2745254              52735551                00477067                50551501
2805322              00496405
Procedures
Number            Title                                                        Revision
OP-903-068        Emergency Diesel Generator and Subgroup Relay Operability    321
Verification
OP-009-002        Emergency Diesel Generator                                  346
OP-903-003        Charging Pump Operability Check                              312
OP-904-007        Charging Pump Pulsation Dampener Pressure Check              016
OP-903-131        AFW High Discharge Pressure Trip Test                        002
MM-006-161        AFW Pump Disassembly, Inspection and Reassembly              9
MM-006-162        Diesel Generator Cylinder Head Removal, Inspection and      7
Installation
EN-HU-106          Procedure and Work Instruction Use and Adherence            6
EN-MA-118          Foreign Material Exclusion                                  13
UNT-005-007        Plant Lubrication Procedure                                  304
OP-002-010        Reactor Auxiliary Building HVAC and Containment Purge        312
OP-903-050        Component Cooling Water and Auxiliary Component Cooling
Water Pump and Valve Operability Test
Drawings
Number                          Title                                            Revision
G-168 Sheet 2                  CVCS Flow Diagram                              55
Miscellaneous
Documents
Number                Title                                                    Revision
WLP-OPS-CVC00          CVCS training document                                  27
WF3-ME-18-00001        Charging Pump Pulsation Dampener Vibration Evaluation    0
EC-75478              Evaluation of Charging Pump Pulsation Dampener Impact on 0
Operability
PE Eval 153315        Head, Cylinder, Emergency Diesel Generator              0
71111.22 - Surveillance Testing
Condition Reports
CR-WF3-2018-04236        CR-WF3-2018-04214      CR-WF3-2018-04202    CR-WF3-2018-04314
CR-WF3-2018-04365
Work Orders
2645246                52819598
Procedures
Number                  Title                                                Revision
OP-903-030              Safety Injection Pump Operability Verification        36
MI-005-214              Calibration of Flow Instruments                      6
OP-903-006              Reactor Trip Circuit Breaker Test                    13
MI-003-126              Core Protection Calculator Functional Test            20
OP-903-100              MOV Overload Bypass Test                              310
OP-903-046              Emergency Feed Pump Operability Check                322
Drawings
Number                  Title                                                Revision
B-424 Sheet 1153        Control Room Emergency Filtration Unit North Intake  20
Miscellaneous
Documents
Number                  Title                                                Revision
SEP-WF3-IST-2          WF3 IST Plan                                          7
71114.02 - Alert and Notification System Testing
Condition Reports
2017-03818      2017-06905
Work Orders
2710344                52735556                52735558
Procedures                                                                  Revision
Number          Title                                                        or Date
Updated Alert and Notification System Design Report, December 8
2014
FEMA REP-10 Design Report Addendum                            July 14,
2015
EPP-422        Siren and Helicopter Warning System Maintenance,            11
EPP-424        Siren Testing and Siren System Administrative Controls,      19
71114.03 - Emergency Response Organization Staffing and Augmentation Systems
Condition Reports
2016-04434    2016-04435      2016-04436  2016-04437      2016-04438    2016-06548
2016-06547    2016-06549      2016-06949  2017-01152      2017-01154    2017-05394
2017-05396    2017-07826      2017-09090
Procedures
Number        Title                                                          Revision
EN-EP-310      Emergency Response Organization Notification System            5
EN-EP-801      Emergency Response Organization                                15
EP-002-015    Emergency Responder Activation                                303
EPP-462        Evaluation of Pager Tests                                      4
71117.04 - Emergency Action Level and Emergency Plan Changes
Procedures
Number        Title                                                          Revision
EN-EP-305      Emergency Planning 10CFR50.54(q) Review Program                6
Miscellaneous
Documents
Number        Title                                                          Revision
10CFR50.54(q)(3) Screening Evaluation for EP-002-100            45
10CFR50.54(q)(3) Screening Evaluation for EN-EP-801            14
10CFR50.54(q)(3) Screening Evaluation for Emergency Plan        47
10CFR50.54(q)(3) Screening Evaluation for Emergency Plan        48
10CFR50.54(q)(3) Screening Evaluation for On-Shift Staffing    1
Analysis
10CFR50.54(q)(3) Screening for Emergency Plan                  49
10CFR50.54(q)(3) Screening Evaluation for EP-001-001            33
71114.05 - Maintenance of Emergency Preparedness
Condition Reports
2016-04573    2016-04891      2016-05315  2016-05563      2016-05572    2016-06017
2016-06404    2016-07104      2016-07597  2017-00008      2017-01627    2017-01826
2017-02502    2017-03304      2017-04233  2017-05494      2017-05535    2017-05662
2017-05875    2017-06905      2017-06978  2017-07707      2017-08244    2017-08367
2017-08388  2017-09328      2017-09512    2017-09772        2017-09804  2017-09833
2018-00047  2018-00104      2018-00539    2018-00980        2018-01009  2018-02867
2018-02988  2018-03489      2018-04476    2018-04479
LO-HQNLO-2016-00050                        LO-HQNLO-2016-00056
CRHQN-2018-01704
Work Orders
00422707            00422708              00448915                00450676
00451436            00451985              00461103                00476211
00488788            00489973              00492462                00495965
2580909            52702861              52707267                52772677
2728394
Procedures
Number      Title                                                            Revision
EN-EP-306  Drills and Exercises                                              9
EN-EP-308  Emergency Planning Critiques                                      5
EN-EP-801  Emergency Response Organization                                  15
EN-LI-102  Corrective Action Program                                        32, 33
EN-LI-104  Self-Assessment and Benchmark Process                            13
EN-QV-109  Audit Process                                                    34
EP-001-010  Unusual Event                                                    303
EP-002-015  Emergency Responder Activation                                    301
EP-003-020  Emergency Preparedness Drills and Exercises,                      304
EP-003-030  Emergency Program Review, Updating, and Modification,            303
EP-003-040  Emergency Equipment Inventory,                                    308
EP-003-070  Emergency Communications Systems Routine Testing,                304
EPP-401    Review, Publication and Distribution of Public Information        2
Materials,
EPP-428    Emergency Facilities and Equipment Readiness,                    306
Miscellaneous
Documents                                                        Revision
Number            Title                                          or Date
Waterford3 Emergency Plan                      47, 48, 49
LO-WLO-2017-0048  2017 Pre NRC Evaluation Exercise Assessment    October 16,
2017
LO-WLO-2017-00077 Pre NRC Program Inspection Assessment
QA-7-2017-W3-1    Emergency Preparedness Audit                  May 26, 2017
QA-7-2018-W3-1    Emergency Preparedness Audit                  May 10, 2018
Monthly Communications Drill                  September 13,
2016
Monthly Communications Drill                  January 31,
2017
Monthly Communications Drill                  November 21,
2017
Monthly Communications Drill                  April 3, 2018
Inspection of Emergency Diesel Generator      September 12,
2016
Inspection of Emergency Diesel Generator      July 6, 2017
Inspection of Emergency Diesel Generator      May 3, 2018
Emergency Communications Test Sheet            August 30, 2016
Emergency Communications Test Sheet            December 20,
2016
Emergency Communications Test Sheet            April 30, 2017
Emergency Communications Test Sheet            November 6,
2017
Emergency Communications Test Sheet            December 13,
2017
Emergency Communications Test Sheet            February 20,
2018
Readiness Condition - Control Room            December 12,
2016
Readiness Condition - Control Room            November 1,
2017
Readiness Condition - Control Room            April 3, 2018
Readiness Condition - Technical Support Center July 6, 2017
Readiness Condition - Technical Support Center December 4,
2017
Readiness Condition - Technical Support Center June 19, 2018
Readiness Condition - Operational Support Center July 6, 2017
Readiness Condition - Operational Support Center April 3, 2018
Readiness Condition - Emergency Operations          September 29,
Facility                                            2016
Readiness Condition - Emergency Operations          July 6, 2017
Facility (March)
Readiness Condition - Emergency Operations          July 6, 2017
Facility (June)
Readiness Condition - Emergency Operations          April 3, 2018
Facility
Readiness Condition - Emergency Operations          June 19, 2018
Facility
Readiness Condition - Joint Information Center      December 4,
2017
Readiness Condition - Joint Information Center      April 3, 2018
Assembly Area Supervisors Kit Inventory            July 6, 2017
Assembly Area Supervisors Kit Inventory            June 19, 2018
After-Action Report for the Notification of Unusual
Event declared on July 17, 2017
Evaluation Report for the Medical Drill Conducted  February 18,
February 12, 2016                                  2016
W3D3-2016-0003 Evaluation Report for the Exercise Conducted        May 3, 2016
April 6, 2016
Evaluation Report for the Health Physics Drill      July 13, 2016
Conducted June 22, 2016
W3D3-2016-0006 Evaluation Report for the Exercise Conducted        July 15, 2016
June 15, 2016
W3E3-2016-0008 Evaluation Report for the Exercise Conducted        September 27,
August 31, 2016                                    2016
W3D3-2016-0009 Evaluation Report for the Drill Conducted          October 7, 2016
October 7, 2016
W3D3-2016-0008 Evaluation Report for the Drill Exercise Conducted
December 7, 2016
Evaluation Report for the Medical Drill Conducted  February 22,
January 23, 2017                                    2017
W3D3-2017-0004 Evaluation Report for the Control Room Breathing    March 24, 2017
Air Drill Conducted March 24, 2017
Evaluation Report for the Exercise Conducted
June 28, 2017
W3D3-2017-0007            Evaluation Report for the Control Room Breathing  September 19,
Air Drill Conducted September 15, 2017            2017
2017-05                  Evaluation Report for the Drill Exercise Conducted October 19,
July 12, 2017, Revision 1                          2017
Evaluation Report for the Exercise Conducted
October 26, 2017
2017-017                  Evaluation Report for the Focused Drill for Site  November 29,
Accountability                                    2017
Evaluation Report for the Exercise Conducted
December 13, 2017
Evaluation Report for the Exercise Conducted
February 21, 2018
Evaluation Report for the Control Room Breathing  June 15, 2018
Air Drill Conducted June 15, 2018
Evaluation Report for the Exercise Conducted      July 18, 2018
June 20, 2018
WF3-IC-17-00002          Engineering Report: Plant Paging System
Reliability Study
71114.06 - Drill Evaluation
Miscellaneous
Documents
Number                  Title                                                Date
Red Team Site Drill Scenario Description              August 29,
2018
Notification Forms for Red Team Site Drill            August 29,
2018
71124.02 - Occupational ALARA Planning and Controls
Condition Reports
WF3-2017-03249      WF3-2017-03344        WF3-2017-03771      WF3-2017-03778 WF3-2018-00831
Procedures
Number            Title                                                      Revision
EN-RP-100        Radiation Worker Expectations                              12
EN-RP-105        Radiological Work Permits                                  18
EN-RP-109        Hot Spot Program                                          05
EN-RP-110        ALARA Program                                              14
Procedures
Number            Title                                                    Revision
EN-RP-110-03      Collective Radiation Exposure (CRE) Reduction            04
Guidelines
EN-RP-110-04      Radiation Protection Risk Assessment Process            07
EN-RP-152          Conduct of Radiation Protection                          04
Audits and Self-Assessments
Number                    Title                                            Date
Self-Assessment: Occupational ALARA Planning
LO-WLO-2017-00069                                                          July 24, 2018
and Controls
Radiation Work Permits
Number        Title                                                        Revision
2016-0118    Loading of Dry Fuel Storage Cask #18 with Spent Fuel and      02
Transport including all DFS Support Activities to include Set
Up/Demob
2016-0119    Loading of Dry Fuel Storage Cask #19 with Spent Fuel and      01
Transport including all DFS Support Activities to include Set
Up/Demob
2016-0123    Loading of Dry Fuel Storage Cask #23 with Spent Fuel and      00
Transport including all DFS Support Activities to include Set
Up/Demob
2017-0515    RCP 1B Motor Replacement                                      00
2017-0610    Erect/Dismantle Scaffolding in the Reactor Containment        00
Building
2017-0702    Reactor Disassembly Activities                                00
2017-0705    Reactor Reassembly Activities                                00
2018-0001    Radiation Protection to Perform Job Coverage, Routine        00
Surveys, Inspections and Walkdowns
2018-0006    Radwaste Processing/Shipping in all Radiologically Controlled 00
Areas
ALARA Planning, In-Progress Reviews, and Post-Job Reviews
Number                  Title                                              Revision
EN-RP-105, Att.9.5      Refuel 20 Outage ALARA Report                      01
EN-RP-105, Att.9.5      Refuel 21 Outage ALARA Report                      00
Miscellaneous
Documents                                                                  Revision
Number            Title                                                    or Date
EC 0000042470    Evaluate TSR 2008-24, 2010-01, 2011-30, 2012-24,        February 20,
2012-33, 2012-36, 2011-79 as Long-Term Shielding        2013
2017 Annual Radiation Protection Program Report          06
Waterford-3 Abbreviated 5-Year Exposure Reduction Plan  December 4,
2018-2022                                                2017
71124.04 - Occupational Dose Assessment
Condition Reports
HQN-2016-1136      WF3-2016-07300      WF3-2017-01829      WF3-2017-02024  WF3-2017-06719
WF3-2017-06758      WF3-2017-07702      WF3-2018-01726      WF3-2017-03148
Procedures
Number            Title                                                    Revision
EN-RP-131        Air Sampling        16
EN-RP-201        Dosimetry Administration                                05
EN-RP-204        Special Monitoring Requirements                          11
EN-RP-205        Prenatal Monitoring                                      03
EN-RP-208        Whole Body Counting/In-Vitro Bioassay                    07
EN-RP-312        Operation and Calibration of the Canberra GEM-5          01
EN-RP-314        Passive Monitor Sensitivity Testing                      00
Audits and Self-Assessments
Number                  Title                                              Date
January 16,
LO-WLO-2016-00037        Self-Assessment: Bioassay Program
2017
LO-WLO-2017-00069        Self-Assessment: Occupational Dose Assessment      July 23, 2018
Calibration Records
Number                  Title                                            Date
017027353              Canberra GEM-5 Calibration Data Sheet            April 25, 2018
Miscellaneous
Documents
Number          Title                                                    Date
Entergy Waterford-3 Radiation Protection Department
2017-2018                                                                September 4, 2018
Respiratory Improvement Plan
Review of Neutron Dose Estimates 2016                    July 25, 2017
Field Trials with the Use of the REM-500 at Waterford-3  July 28, 2017
Review of the Capabilities of the Passive Monitoring
October 4, 2017
Program to Detect Intakes at Waterford-3
71151 - Performance Indicator Verification
Condition Reports
2017-07707      2017-08036        2017-08367      2017-08790    2017-09261    2017-09507
2017-09512      2017-09637        2018-00678      2018-02077    2018-02656    2018-02870
Procedures
Number          Title                                                      Revision
EP-001-001      Recognition and Classification of Emergencies              32, 33
EP-002-010      Notifications and Communications                          313, 314, 315
EP-002-052      Protective Action Guidelines                              25
EPP-424          Siren Testing and Siren System Administrative Controls,    19
71152 - Identification and Resolution of Problems
Condition Reports
CR-WF3-2018-01054        CR-WF3-2018-01849        CR-WF3-2017-07486    CR-WF3-2018-01981
CR-WF3-2017-09887        CR-WF3-2018-01049        CR-WF3-2018-01978    CR-WF3-2018-01994
CR-WF3-2018-06078        CR-WF3-2018-05252
Procedures
Number                  Title                                                  Revision
EN-LI-108 Att. 9.1      10 CFR 21 Discovery Determination & Reportability      9
Evaluation Sheet for CR-WF3-2018-1994
EN-DC-205                Maintenance Rule Monitoring                            6
Drawings
Number                Title                                                Revision
B425 T7075B1          Control Loop Diagram CC-Dry Cooling tower B Fan      4
Cooling
B425 T7070BD          Control Loop Diagram CC-Dry Cooling tower B Outlet  4
Temp
B425 T5009A          Control Loop Diagram HVR-CCW Pump Heat Exchanger 5
A Room Temp
71153 - Event Followup
Miscellaneous
Documents
Number              Title                                                  Date
W3F1-2017-0076      NRC Performance Indicator (PI) Data - 3rd Quarter 2017 October 6,
ROP Data                                              2017
W3F1-2018-0004      NRC Performance Indicator (PI) Data - 4th Quarter 2017 January 9,
ROP Data                                              2018
W3F1-2018-0024      NRC Performance Indicator (PI) Data - 1st Quarter 2018 April 12,
ROP Data                                              2018
W3F1-2018-0042      NRC Performance Indicator (PI) Data - 2nd Quarter 2018 July 13, 2018
ROP Data
The following items are requested for the
Occupational Radiation Safety Inspection
at Waterford-3
Dates of Inspection: 09/10/2018 to 09/14/2018
Integrated Report 2018003
Inspection areas are listed in the attachments below.
Please provide the requested information on or before Monday, August 13, 2018.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.02 should be in a file/folder titled
2-A, applicable organization charts in file/folder 2-B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the onsite inspection dates, so the inspector will have access to the
information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
e-mail at Natasha.Greene@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:          April 24, 2017
A. List of contacts and telephone numbers for ALARA program personnel. Please include
area code and prefix. If work cell numbers are appropriate, then please include them as
well.
B. Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], self-assessments, LARs, and LERs, written since the date of last
inspection, focusing on ALARA
D. Procedure index for ALARA Program procedures and other related disciplines.
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
2. ALARA Planning
3. ALARA Reviews
4. ALARA Committee
5. Radiation Work Permit Preparation
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of last inspection, related to the ALARA
program, including exceeding RWP Dose Estimates.
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspector can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspector can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
: [[contact::H. List of work activities (RWPs) greater than 1 rem]], since date of last inspection,
including the original dose estimates and actual doses accrued. (Excel format
preferred). Please provide all revisions/changes, as well as any related RWPs that
support the work activity.
Provide any post evaluations, lessons learned, and/or corrective action documents
generated as a result of this work activity. If available, provide any justifications/reasons
for actual dose exceedances of the initial dose estimate.
: [[contact::I. List of active work activities (RWPs) that will be in use while we are onsite]], including the
dose and dose rate settings, and if available, the planned dose.
J. Site dose totals for the past 3 years (based on dose of record). Also provide the current
year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide
another document that separates the online and outage doses for the past 3 years.
: [[contact::K. Most recent assessment of your isotopic mix]], including the hard-to-detect radionuclides
and alpha hazards. Include a list of new and historical exposure issues (radiological
source term or high exposure areas/activities).
: [[contact::L. If available]], provide a copy of the ALARA outage report or evaluation for the two most
recently completed outages for each unit
M. Please provide the methods/reports that are in your process to meet the requirements of
CFR 20.1101(c) for periodic review of your RP program.
N. Current exposure trends (BRAC dose rates and/or source term information)
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
Date of Last Inspection:          September 12, 2016
A. List of contacts and telephone numbers for the Dose Assessment personnel. Please
include area code and prefix. If work cell numbers are appropriate, then please include
them as well.
B. Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since date of last inspection, related to Occupational Dose Assessment
D. Procedure indexes for Occupational Dose Assessment procedures and other related
disciplines.
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
3. Personnel Dosimetry Program
4. Electronic Dosimeters
5. Air Sample Analysis
6. Performance of High or Special Exposure Work
7. Declared Pregnant Worker
8. Bioassay Program (Internal Dose Assessment)
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems
3. Electronic alarming dosimeters
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspector can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspector can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format) If codes are used,
please provide a legend for each column where a code is used.
: [[contact::H. List of positive whole body counts (excluding K-40) since date of last inspection]], include
date(s), reason(s), activity assessed, and doses calculated and assigned. Names and
personal information can be redacted, if desired
: [[contact::I. Part 61 analyses or other analyses of plant isotopic mixture (alpha]], beta, gamma, and
neutron) for appropriate instrumentation calibration sources and dosimetry selection and
hard-to-detect plant nuclide scaling factors for intakes/uptakes.
J. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results and which dosimeter(s) is (are) use at the site and for what purpose(s) (DLR,
neutron, environmental, etc.).
K. Please provide the latest assessment of your radiological source term as it relates to the
internal/external exposure of workers.
: [[contact::L. If available]], please provide your latest source term reduction strategy.
M. Have available for on-site review the LLDs or MDAs for each onsite WBC or other
internal dose assessment instrumentation.
: [[contact::N. If available]], please provide the latest neutron source term characterization.
Describe why the neutron dosimetry used is appropriate for these locations.
O. A list of airborne radioactivity areas (and associate RWPs) where DAC-hr monitoring
was used with air sampling to track and assign dose (BZ lapel air samples, etc.).
: [[contact::P. Please have available for on-site review]], a list of workers that declared a pregnancy
since the last inspection. Declared Pregnant Worker monitoring of worker and fetus.
Please provide the most recent NRC Form 5 for these individuals. No more than three
are requested. Please redact any sensitive information.
: [[contact::Q. A list of EDEX or multi-badge dosimetry uses since the last inspection]], include the
associated RWP and dose accrued.
 
ML18304A163
SUNSI Review          ADAMS:            Non-Publicly Available        Non-Sensitive Keyword:
By: NFO              Yes  No        Publicly Available            Sensitive    NRC-002
OFFICE        SRI:DRP/D    RI:DRP/D      Tl:DRS/IPAT BC:DRS/EB1          Bc:DRS/EB2  BC:DRS/PSB2
NAME          FRamirez      CSpeer        GMiller          TFarnholtz      GWerner      HGepford
SIGNATURE      FCR          CAS            GBM              TRF            GEW          hjg
DATE          10/16/2018    10/17/18      10/25/18        10/25/2018      10/24/2018  10/25/18
OFFICE        BC:DRS/OB    BC:DRP/D
NAME          VGaddy        NOKeefe
SIGNATURE      TJF for      NFO
DATE          10/25/2018    10/29/2018
}}
}}

Latest revision as of 17:21, 18 December 2019

NRC Integrated Inspection Report 05000382/2018003
ML18304A163
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/30/2018
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-D
To: Dinelli J
Entergy Operations
References
IR 2018003
Download: ML18304A163 (33)


Text

ber 30, 2018

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000382/2018003

Dear Mr. Dinelli:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Waterford Steam Electric Station, Unit 3. On October 11, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Neil OKeefe, Chief Branch D Division of Reactor Projects Docket No. 50-382 License No. NPF-38 Enclosure:

Inspection Report 05000382/2018003 w/ Attachments:

1. Documents Reviewed 2. NRC Request for Information

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s): 05000382 License Number(s): NPF-38 Report Number(s): 05000382/2018003 Enterprise Identifier: 1-2018-003-0002 Licensee: Entergy Operations, Inc.

Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, Louisiana Inspection Dates: July 1, 2018 to September 30, 2018 Inspectors: F. Ramírez, Senior Resident Inspector C. Speer, Resident Inspector J. Dixon, Senior Project Engineer T. Farina, Senior Operations Engineer P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, PhD, Senior Health Physicist I. Anchondo, Reactor Inspector, Engineering Branch 2 G. George, Senior Reactor Inspector, Engineering Branch 1 Approved By: Neil OKeefe Branch Chief Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.

Additional Tracking Items Type Issue number Title Report Status Section URI 05000382/2017008-04 Potential Failure to Obtain a 71111.21M Closed License Amendment for Changes to Diesel Generator Surveillance Test Interval

PLANT STATUS

The plant operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection External Flooding

The inspectors evaluated readiness to cope with external flooding in the safety-related switchgear room A on August 1, 2018.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Shield building ventilation train A with train B out of service for maintenance on July 17, 2018
(2) Auxiliary feedwater system following an extended system outage on August 19, 2018
(3) Emergency feedwater train A with train B out of service for maintenance on August 21, 2018
(4) Emergency diesel generator A with emergency diesel generator B out of service for maintenance on September 11, 2018

Completed Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the reactor auxiliary building controlled ventilation area system on September 12, 2018.

71111.05AQFire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire area NS-TB-001, turbine building +15.00 east on July 18,2018
(2) Fire area NS-TB-003, turbine building mezzanine +40.00 east on August 19, 2018
(3) Fire area RAB 34-001, safeguards valve gallery rooms A and B on August 21, 2018
(4) Fire area NS-TB-004, turbine building +40.00 west on August 22, 2018
(5) Fire area RAB2-001, heating and ventilation mechanical room on September 11, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance during an unannounced fire drill in the +35 reactor auxiliary building electrical penetration B area on September 21, 2018.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated requalification scenario in the simulator on July 23, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated control room performance during control element assembly testing on August 3, 2018.

Operator Exams (1 Sample)

The inspector reviewed and evaluated requalification examination results on August 27, 2018.

71111.12QMaintenance Rule Implementation Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Dry cooling tower sump pump failures on July 24, 2018
(2) Controlled ventilation area system routine assessment of maintenance on August 8, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Emergent work related to electrical bus 31AB on July 25, 2018
(2) Risk assessment associated with work in the transformer yard on August 13, 2018
(3) Planned yellow risk due to emergency feedwater system train B work window on August 21, 2018
(4) Planned yellow risk due to emergency diesel generator B work window on September 10, 2018
(5) Planned yellow risk due to emergency diesel generator A work window on September 27, 2018

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Operability determination for charging pump B due to relay calibration values found out of tolerance on July 19, 2018
(2) Functionality assessment for motor generator set B due to high vibrations on July 31, 2018
(3) Operability determination for emergency diesel generator B due to low field voltage and current during testing on August 6, 2018
(4) Operability determination for emergency diesel generator B subgroup relays due to the failure of the safety injection actuation signal relay on August 21, 2018

71111.18Plant Modifications

The inspectors evaluated the following temporary modification:

(1) Temporary replacement of failed pressurizer proportional heater bank 1 heaters 3 and 4 with heaters from backup bank 2 and 3 on August 1, 2018
(2) Ultimate heat sink margin restoration Phase 3 permanent modification on August 15, 2018

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Train A sequencer following relay replacement on August 6, 2018
(2) Charging pump A after seal pump/motor and gearbox replacement on August 9, 2018
(3) Auxiliary feedwater pump to motor coupling removal/reinstallation and pump outboard bearing gasket replacement on August 14, 2018
(4) Reactor auxiliary building +46 HVAC air handling unit following planned maintenance on September 5, 2018
(5) Auxiliary component cooling water pump B following emergent bearing oil replacement on September 18, 2018
(6) Emergency diesel generator A following planned relay replacement on September 27, 2018

71111.22Surveillance Testing The inspectors evaluated the following surveillance tests: Routine

(1) Emergency feedwater pump A operability run on July 10, 2018
(2) High pressure safety injection pump B operability run on July 25, 2018
(3) Reactor trip circuit breaker #5 test on August 1, 2018
(4) Core protection calculator A test on August 2, 2018
(5) Control room emergency filtration unit outside air intake upstream isolation valve test on August 14, 2018

71114.02Alert and Notification System Testing

The inspector evaluated the maintenance and testing of the alert and notification system on August 1, 2018.

71114.03Emergency Response Organization Staffing and Augmentation System

The inspector evaluated the readiness Emergency Preparedness Organization on August 2, 2018.

71114.04Emergency Action Level and Emergency Plan Changes

The inspector evaluated submitted changes to the Waterford 3 Steam Electric Station Emergency Plan, Revision 49, and Procedure EP-001-001, Recognition and Classification of Emergency Conditions, Revision 33, between July 9 and 12, 2018. This evaluation does not constitute NRC approval.

71114.05Maintenance of Emergency Preparedness

The inspector evaluated the maintenance of the emergency preparedness program on August 6 and 7, 2018.

71114.06Drill Evaluation Emergency Planning Drill

The inspectors evaluated an emergency planning drill on August 29,

RADIATION SAFETY

71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning

The inspector evaluated the licensees radiological work planning by reviewing the following activities:

(1) RWP 2016-0118, Loading of Dry Fuel Storage Cask #18, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 02
(2) RWP 2016-0119, Loading of Dry Fuel Storage Cask #19, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 01
(3) RWP 2016-0123, Loading of Dry Fuel Storage Cask #23, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 00
(4) RWP 2017-0515, RCP 1B Motor Replacement, Revision 00
(5) RWP 2017-0610, Erect/Dismantle Scaffolding in the Reactor Containment Building, Revision 00
(6) RWP 2017-0702, Reactor Disassembly Activities, Revision 00
(7) RWP 2017-0705, Reactor Reassembly Activities, Revision 00
(8) RWP 2018-0001, Radiation Protection to Perform Job Coverage, Routine Surveys, Inspections and Walkdowns, Revision 00
(9) RWP 2018-0006, Radwaste Processing/Shipping in all Radiologically Controlled Areas, Revision 00 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04Occupational Dose Assessment Source Term Characterization

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) MS08: Heat Removal Systems (07/01/2017-06/30/2018)
(2) MS09: Residual Heat Removal Systems (07/01/2017-06/30/2018)
(3) MS10: Cooling Water Support Systems (07/01/2017-06/30/2018)
(4) EP01: Drill/Exercise Performance Sample (10/01/2017-06/30/2018)
(5) EP02: Emergency Response Organization Drill Participation Sample (10/01/2017-06/30/2018)
(6) EP03: Alert And Notification System Reliability Sample (10/01/2017-06/30/2018)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Process analog control card failures that resulted in a Part 21 report to the NRC on September 6, 2018
(2) Maintenance rule failure classification of the fast bus transfer failure during the Notification of Unusual Event in June 2017 on September 13, 2018

71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports

The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Reports 05000382/2018-002-00 and 05000382/2018-002-01, Unplanned Loss of a Train of Control Room Outside Air Intake Radiation Monitors Results in a Condition Prohibited by Technical Specifications, on August 16, 2018.
(2) Licensee Event Report 05000382/2017-002-01, Automatic Reactor Scram due to the Failure of Fast Dead Bus Transfer Relays to Automatically Transfer Station Load to Off-Site Power on a Main Generator Trip, on August 16,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

INSPECTION RESULTS

Unresolved Item Potential Failure to Obtain a License Amendment for 7111.21M (Closed) Changes to Diesel Generator Surveillance Test Interval URI 05000382/2017008-04

Description:

U.S. Nuclear Regulatory Commission (NRC) Design Bases Assurance Inspection Report 05000382/2017008 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML17362A424), dated December 28, 2017, documents Unresolved Item 05000382/2017008-04, Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval. During that inspection, the team reviewed the licensees change to the surveillance test intervals for the train A and B emergency diesel generators, which was completed in accordance with the Waterford surveillance frequency control program. As a result, both emergency diesel generators went from being tested every 18 months to each emergency diesel generator being tested every 36 months. The team concluded that the license had failed to correctly evaluate the change in accordance with the surveillance frequency control program change process per NEI 04-10, Risk Informed Method for Control of Surveillance Frequencies, Revision 1. Specifically, the licensee had not correctly evaluated NEI 04-10, step 1, Check for Prohibitive Commitments, and step 2, Can Commitments be Changed? of the change process. During the inspection, the team determined that this change would have necessitated a 10 CFR 50.59 safety evaluation and subsequent license amendment because it would have resulted in more than a minimal increase in likelihood of a malfunction of a component important to safety as previously described in the final safety analysis report. At the conclusion of the inspection, the team decided to address this item pending the review of the licensees previously documented corrective actions associated with the potential issue.

Since the conclusion of the inspection, the regulatory applicability of this unresolved item was addressed in NRC letter to Byron Generating Station, dated July 23, 2018, (ADAMS Accession Number ML18204A144). The letter documents the withdrawal of a non-cited violation associated with 10 CFR 50.59 requirements applicable to changes in surveillance test intervals of emergency diesel generators. The review was conducted by an independent NRC panel and the outcome was documented, in part, as follow; In NEI 04-10 Step 2, a check is made to determine if the applicable regulatory commitments to the NRC can be changed. Evaluating changes to regulatory commitments is a separate activity based on a method acceptable to the NRC for managing and changing regulatory commitments (e.g., NEI 99-04). NEI 99-04 Section 3.1, Definitions, defines a regulatory commitment as an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC. A regulatory commitment is an intentional undertaking by the licensee to

(1) restore compliance with regulatory requirements, or
(2) complete a specific action to address an NRC issue or concern (e.g., generic letter, bulletin, order, etc.)...Thus, there was no associated regulatory commitment to change under NEI 04-10 Step 2, and it was appropriate for the licensee to continue to step through the NDE 04-10 process to evaluate an EDG surveillance frequency change.

Therefore, given the circumstances for the non-cited violation withdrawal and its applicability to this unresolved item, the NRC has concluded that there is no violation and no license amendment was required. This item is closed.

Corrective Action Reference(s): N/A

EXIT MEETINGS AND DEBRIEFS

On August 9, 2018, the inspector presented the emergency preparedness inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff. The inspector verified that no proprietary information was retained or documented in this report.

On August 27, 2018, the inspector presented the annual requalification inspection results to Mr. D. Constance, Operations Training Superintendent. The inspector verified no proprietary information was retained or documented for this inspection report.

On September 13, 2018, the inspector presented the baseline radiation safety inspection results to Mr. S. Vazquez, General Manager of Plant Operations, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.

On October 11, 2018, the inspector presented the quarterly resident inspector inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Condition Reports

CR-WF3-2018-04408

Procedures

Number Title Revision

EN-LI-100 Process Applicability Determination 10

OP-901-521 Severe Weather and Flooding 326

Drawings

Number Title Date

G-580 Nuclear Plant Island Structure Flood Wall July 10, 2018

Penetrations, Sheet 1

G-580 Nuclear Plant Island Structure Flood Wall April 3, 2011

Penetrations, Sheet 2

G-580 Nuclear Plant Island Structure Flood Wall April 25, 1991

Penetrations, Sheet 3

71111.04 - Equipment Alignment

Condition Reports

CR-WF3-2017-01509 CR-WF3-2017-04445 CR-WF3-2018-04638 CR-WF3-2017-07561

CR-WF3-2017-07550

Work Orders

00475847 00476848 00433888 00397848

00427894 00468224 00467879 00435999

Procedures

Number Title Revision

OP-008-008 Shield Building Ventilation 10

OP-003-035 Auxiliary Feedwater 309

OP-009-003 Emergency Feedwater 309

OP-009-002 Emergency Diesel Generator 346

OP-002-010 Reactor Auxiliary Building HVAC and Containment 312

Purge

71111.05 - Fire Protection

Procedures

Number Title Revision

NS-TB-001 Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +15.00 4

East

NS-TB-003 Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +40.00 1

East

RAB 34-001 Waterford-3 S.E.S Pre-Fire Strategy Elev. -15.50 RAB (RCA) 8

NS-TB-004 Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +40.00 1

West

RAB 2-001 Waterford-3 S.E.S Pre-Fire Strategy Elev. +46.00 RAB (RCA) 13

EN-TQ-125 Fire Brigade Drills 6

RAB 6-001 Waterford-3 S.E.S Pre-Fire Strategy Elev. +35.00 RAB 9

Miscellaneous

Documents

Number Title Date

Waterford 3 Fire Brigade Drill 2018 Completion September

Tracking Matrix 2018

Waterford 3 Fire Brigade Drill 2017 Completion September

Tracking Matrix 2018

Waterford 3 Fire Brigade Drill 2016 Completion September

Tracking Matrix 2018

71111.11 - Licensed Operator Requalification

Condition Reports

CR-WF3-2018-03123 CR-WF3-2018-03213 CR-WF3-2018-03085 CR-WF3-2017-06573

CR-WF3-2016-05408 CR-WF3-2016-07255 CR-WF3-2018-02492 CR-WF3-2017-00464

CR-WF3-2017-02044 CR-WF3-2017-01218 CR-WF3-2017-01623 CR-WF3-2017-03600

Procedures

Number Title Revision

OP-100-010 Equipment Out of Service 316

OP-901-110 Pressurizer Level Control Malfunction 11

OP-901-220 Loss of Condenser Vacuum 303

OP-901-212 Rapid Plant Power Reduction 10

OP-902-000 Standard Post Trip Actions 16

OP-902-001 Reactor Trip Recovery 16

OP-902-008 Functional Recovery 27

OP-902-009 Standard Appendices 317

EP-001-001 Recognition & Classification of Emergency Conditions 33

OP-903-005 Control Element Assembly Operability Check 14

OP-903-094 ESFAS Subgroup Relay Test - Operating 31

Miscellaneous

Documents Revision

Number Title or Date

WSXM-LOR-184EXM 2018 Cycle 4 Annual Simulator Exam - Week 3 E-214

Annual Requalification Results Summary August 20,

2018

71111.13 - Maintenance Risk Assessment and Emergent Work Review

Condition Reports

CR-WF3-2018-04154 CR-WF3-2018-04156 CR-WF3-2018-04180 CR-WF3-2018-05046

Work Orders

00432117 00427084 00432121

Procedures

Number Title Revision

EN-FAP-WM-107 Emergent Issues Process 1

EN-MA-125 Troubleshooting Control and Maintenance Activities 22

EN-WM-104 On Line Risk Management 17

OI-037-000 Operations Risk Assessment Guideline 313

EN-WM-104 On Line Risk Management 18

EN-OP-119 Protected Equipment Postings 9

Miscellaneous

Documents

Number Title Date

EN-OP-119 Att. 9.1 Protected Equipment Postings List for Emergency September 23,

Diesel Generator A work window 2018

EN-OP-119 Att. 9.1 Protected Equipment Postings List for Emergency August 20,

Feedwater 228A and 224A 2018

71111.15 - Operability Evaluations

Condition Reports

CR-WF3-2018-04025 CR-WF3-2018-04021 CR-WF3-2018-04114 CR-WF3-2018-04709

Procedures

Number Title Revision

OP-008-008 Shield Building Ventilation 10

OP-903-068 Emergency Diesel Generator and Subgroup Relay 321

Operability Verification

71111.18 - Plant Modifications

Condition Reports

CR-WF3-2017-02774 CR-WF3-2018-04367 CR-WF3-2018-04296 CR-WF3-2018-04677

Procedures

Number Title Revision

EN-DC-136 Temporary Modifications 17

OP-001-001 Reactor Coolant System Fill and Vent 35

OP-903-097 Pressurizer Heater Capacity Verification 12

OP-901-502 Evacuation of Control Room and Subsequent Plant 35

Cooldown

Drawings

Number Title Revision

5817-14492 UHS Air Deflector Structure Details Sheets 1 - 41

B424 Sheet 291 Pressurizer Proportional Heater Bank-1 18

B424 Sheet 286 Pressurizer Backup Heaters Bank 2 20

B424 Sheet 287 Pressurizer Backup Heaters Bank 3 18

B289 Sheet 23A1 480V Switchgear 3A32 Programmer Settings 8

B289 Sheet 23 Power Distribution and Motor Data 480V Switchgear 3A32 17

One Line Diagram

B289 Sheet 101 Power Distribution and Motor Data 480V Distribution Panels 6

B289 Sheet 158 Power Distribution and Motor Data 480V Switchgear Front 13

View

Miscellaneous

Documents

Number Title Revision

EC-71594 Temporary Replace Failed Proportional Heater Bank 1 0

Heaters 3 (position F2) and 4 (position H2) with heaters from

Backup Bank 2and 3 (positions E1 and C2)

EC-54532 Ultimate Heat Sink Margin Restoration - Phase 3 0

EC-52043 Ultimate Heat Sink Margin Restoration 0

71111.19 - Post-Maintenance Testing

Condition Reports

CR-WF3-2018-04419 CR-WF3-2018-07223 CR-WF3-2018-04415 CR-WF3-2018-01508

CR-WF3-2018-01004 CR-WF3-2018-00589 CR-WF3-2017-05397 CR-WF3-2018-04463

CR-WF3-2017-01483 CR-WF3-2017-05329 CR-WF3-2018-04444 CR-WF3-2017-04606

CR-WF3-2018-04632 CR-WF3-2018-05448

Work Orders

00496628 00434744 00364478 52735553

00450472 52756221 52713822 52746212

2745254 52735551 00477067 50551501

2805322 00496405

Procedures

Number Title Revision

OP-903-068 Emergency Diesel Generator and Subgroup Relay Operability 321

Verification

OP-009-002 Emergency Diesel Generator 346

OP-903-003 Charging Pump Operability Check 312

OP-904-007 Charging Pump Pulsation Dampener Pressure Check 016

OP-903-131 AFW High Discharge Pressure Trip Test 002

MM-006-161 AFW Pump Disassembly, Inspection and Reassembly 9

MM-006-162 Diesel Generator Cylinder Head Removal, Inspection and 7

Installation

EN-HU-106 Procedure and Work Instruction Use and Adherence 6

EN-MA-118 Foreign Material Exclusion 13

UNT-005-007 Plant Lubrication Procedure 304

OP-002-010 Reactor Auxiliary Building HVAC and Containment Purge 312

OP-903-050 Component Cooling Water and Auxiliary Component Cooling

Water Pump and Valve Operability Test

Drawings

Number Title Revision

G-168 Sheet 2 CVCS Flow Diagram 55

Miscellaneous

Documents

Number Title Revision

WLP-OPS-CVC00 CVCS training document 27

WF3-ME-18-00001 Charging Pump Pulsation Dampener Vibration Evaluation 0

EC-75478 Evaluation of Charging Pump Pulsation Dampener Impact on 0

Operability

PE Eval 153315 Head, Cylinder, Emergency Diesel Generator 0

71111.22 - Surveillance Testing

Condition Reports

CR-WF3-2018-04236 CR-WF3-2018-04214 CR-WF3-2018-04202 CR-WF3-2018-04314

CR-WF3-2018-04365

Work Orders

2645246 52819598

Procedures

Number Title Revision

OP-903-030 Safety Injection Pump Operability Verification 36

MI-005-214 Calibration of Flow Instruments 6

OP-903-006 Reactor Trip Circuit Breaker Test 13

MI-003-126 Core Protection Calculator Functional Test 20

OP-903-100 MOV Overload Bypass Test 310

OP-903-046 Emergency Feed Pump Operability Check 322

Drawings

Number Title Revision

B-424 Sheet 1153 Control Room Emergency Filtration Unit North Intake 20

Miscellaneous

Documents

Number Title Revision

SEP-WF3-IST-2 WF3 IST Plan 7

71114.02 - Alert and Notification System Testing

Condition Reports

2017-03818 2017-06905

Work Orders

2710344 52735556 52735558

Procedures Revision

Number Title or Date

Updated Alert and Notification System Design Report, December 8

2014

FEMA REP-10 Design Report Addendum July 14,

2015

EPP-422 Siren and Helicopter Warning System Maintenance, 11

EPP-424 Siren Testing and Siren System Administrative Controls, 19

71114.03 - Emergency Response Organization Staffing and Augmentation Systems

Condition Reports

2016-04434 2016-04435 2016-04436 2016-04437 2016-04438 2016-06548

2016-06547 2016-06549 2016-06949 2017-01152 2017-01154 2017-05394

2017-05396 2017-07826 2017-09090

Procedures

Number Title Revision

EN-EP-310 Emergency Response Organization Notification System 5

EN-EP-801 Emergency Response Organization 15

EP-002-015 Emergency Responder Activation 303

EPP-462 Evaluation of Pager Tests 4

71117.04 - Emergency Action Level and Emergency Plan Changes

Procedures

Number Title Revision

EN-EP-305 Emergency Planning 10CFR50.54(q) Review Program 6

Miscellaneous

Documents

Number Title Revision

10CFR50.54(q)(3) Screening Evaluation for EP-002-100 45

10CFR50.54(q)(3) Screening Evaluation for EN-EP-801 14

10CFR50.54(q)(3) Screening Evaluation for Emergency Plan 47

10CFR50.54(q)(3) Screening Evaluation for Emergency Plan 48

10CFR50.54(q)(3) Screening Evaluation for On-Shift Staffing 1

Analysis

10CFR50.54(q)(3) Screening for Emergency Plan 49

10CFR50.54(q)(3) Screening Evaluation for EP-001-001 33

71114.05 - Maintenance of Emergency Preparedness

Condition Reports

2016-04573 2016-04891 2016-05315 2016-05563 2016-05572 2016-06017

2016-06404 2016-07104 2016-07597 2017-00008 2017-01627 2017-01826

2017-02502 2017-03304 2017-04233 2017-05494 2017-05535 2017-05662

2017-05875 2017-06905 2017-06978 2017-07707 2017-08244 2017-08367

2017-08388 2017-09328 2017-09512 2017-09772 2017-09804 2017-09833

2018-00047 2018-00104 2018-00539 2018-00980 2018-01009 2018-02867

2018-02988 2018-03489 2018-04476 2018-04479

LO-HQNLO-2016-00050 LO-HQNLO-2016-00056

CRHQN-2018-01704

Work Orders

00422707 00422708 00448915 00450676

00451436 00451985 00461103 00476211

00488788 00489973 00492462 00495965

2580909 52702861 52707267 52772677

2728394

Procedures

Number Title Revision

EN-EP-306 Drills and Exercises 9

EN-EP-308 Emergency Planning Critiques 5

EN-EP-801 Emergency Response Organization 15

EN-LI-102 Corrective Action Program 32, 33

EN-LI-104 Self-Assessment and Benchmark Process 13

EN-QV-109 Audit Process 34

EP-001-010 Unusual Event 303

EP-002-015 Emergency Responder Activation 301

EP-003-020 Emergency Preparedness Drills and Exercises, 304

EP-003-030 Emergency Program Review, Updating, and Modification, 303

EP-003-040 Emergency Equipment Inventory, 308

EP-003-070 Emergency Communications Systems Routine Testing, 304

EPP-401 Review, Publication and Distribution of Public Information 2

Materials,

EPP-428 Emergency Facilities and Equipment Readiness, 306

Miscellaneous

Documents Revision

Number Title or Date

Waterford3 Emergency Plan 47, 48, 49

LO-WLO-2017-0048 2017 Pre NRC Evaluation Exercise Assessment October 16,

2017

LO-WLO-2017-00077 Pre NRC Program Inspection Assessment

QA-7-2017-W3-1 Emergency Preparedness Audit May 26, 2017

QA-7-2018-W3-1 Emergency Preparedness Audit May 10, 2018

Monthly Communications Drill September 13,

2016

Monthly Communications Drill January 31,

2017

Monthly Communications Drill November 21,

2017

Monthly Communications Drill April 3, 2018

Inspection of Emergency Diesel Generator September 12,

2016

Inspection of Emergency Diesel Generator July 6, 2017

Inspection of Emergency Diesel Generator May 3, 2018

Emergency Communications Test Sheet August 30, 2016

Emergency Communications Test Sheet December 20,

2016

Emergency Communications Test Sheet April 30, 2017

Emergency Communications Test Sheet November 6,

2017

Emergency Communications Test Sheet December 13,

2017

Emergency Communications Test Sheet February 20,

2018

Readiness Condition - Control Room December 12,

2016

Readiness Condition - Control Room November 1,

2017

Readiness Condition - Control Room April 3, 2018

Readiness Condition - Technical Support Center July 6, 2017

Readiness Condition - Technical Support Center December 4,

2017

Readiness Condition - Technical Support Center June 19, 2018

Readiness Condition - Operational Support Center July 6, 2017

Readiness Condition - Operational Support Center April 3, 2018

Readiness Condition - Emergency Operations September 29,

Facility 2016

Readiness Condition - Emergency Operations July 6, 2017

Facility (March)

Readiness Condition - Emergency Operations July 6, 2017

Facility (June)

Readiness Condition - Emergency Operations April 3, 2018

Facility

Readiness Condition - Emergency Operations June 19, 2018

Facility

Readiness Condition - Joint Information Center December 4,

2017

Readiness Condition - Joint Information Center April 3, 2018

Assembly Area Supervisors Kit Inventory July 6, 2017

Assembly Area Supervisors Kit Inventory June 19, 2018

After-Action Report for the Notification of Unusual

Event declared on July 17, 2017

Evaluation Report for the Medical Drill Conducted February 18,

February 12, 2016 2016

W3D3-2016-0003 Evaluation Report for the Exercise Conducted May 3, 2016

April 6, 2016

Evaluation Report for the Health Physics Drill July 13, 2016

Conducted June 22, 2016

W3D3-2016-0006 Evaluation Report for the Exercise Conducted July 15, 2016

June 15, 2016

W3E3-2016-0008 Evaluation Report for the Exercise Conducted September 27,

August 31, 2016 2016

W3D3-2016-0009 Evaluation Report for the Drill Conducted October 7, 2016

October 7, 2016

W3D3-2016-0008 Evaluation Report for the Drill Exercise Conducted

December 7, 2016

Evaluation Report for the Medical Drill Conducted February 22,

January 23, 2017 2017

W3D3-2017-0004 Evaluation Report for the Control Room Breathing March 24, 2017

Air Drill Conducted March 24, 2017

Evaluation Report for the Exercise Conducted

June 28, 2017

W3D3-2017-0007 Evaluation Report for the Control Room Breathing September 19,

Air Drill Conducted September 15, 2017 2017

2017-05 Evaluation Report for the Drill Exercise Conducted October 19,

July 12, 2017, Revision 1 2017

Evaluation Report for the Exercise Conducted

October 26, 2017

2017-017 Evaluation Report for the Focused Drill for Site November 29,

Accountability 2017

Evaluation Report for the Exercise Conducted

December 13, 2017

Evaluation Report for the Exercise Conducted

February 21, 2018

Evaluation Report for the Control Room Breathing June 15, 2018

Air Drill Conducted June 15, 2018

Evaluation Report for the Exercise Conducted July 18, 2018

June 20, 2018

WF3-IC-17-00002 Engineering Report: Plant Paging System

Reliability Study

71114.06 - Drill Evaluation

Miscellaneous

Documents

Number Title Date

Red Team Site Drill Scenario Description August 29,

2018

Notification Forms for Red Team Site Drill August 29,

2018

71124.02 - Occupational ALARA Planning and Controls

Condition Reports

WF3-2017-03249 WF3-2017-03344 WF3-2017-03771 WF3-2017-03778 WF3-2018-00831

Procedures

Number Title Revision

EN-RP-100 Radiation Worker Expectations 12

EN-RP-105 Radiological Work Permits 18

EN-RP-109 Hot Spot Program 05

EN-RP-110 ALARA Program 14

Procedures

Number Title Revision

EN-RP-110-03 Collective Radiation Exposure (CRE) Reduction 04

Guidelines

EN-RP-110-04 Radiation Protection Risk Assessment Process 07

EN-RP-152 Conduct of Radiation Protection 04

Audits and Self-Assessments

Number Title Date

Self-Assessment: Occupational ALARA Planning

LO-WLO-2017-00069 July 24, 2018

and Controls

Radiation Work Permits

Number Title Revision

2016-0118 Loading of Dry Fuel Storage Cask #18 with Spent Fuel and 02

Transport including all DFS Support Activities to include Set

Up/Demob

2016-0119 Loading of Dry Fuel Storage Cask #19 with Spent Fuel and 01

Transport including all DFS Support Activities to include Set

Up/Demob

2016-0123 Loading of Dry Fuel Storage Cask #23 with Spent Fuel and 00

Transport including all DFS Support Activities to include Set

Up/Demob

2017-0515 RCP 1B Motor Replacement 00

2017-0610 Erect/Dismantle Scaffolding in the Reactor Containment 00

Building

2017-0702 Reactor Disassembly Activities 00

2017-0705 Reactor Reassembly Activities 00

2018-0001 Radiation Protection to Perform Job Coverage, Routine 00

Surveys, Inspections and Walkdowns

2018-0006 Radwaste Processing/Shipping in all Radiologically Controlled 00

Areas

ALARA Planning, In-Progress Reviews, and Post-Job Reviews

Number Title Revision

EN-RP-105, Att.9.5 Refuel 20 Outage ALARA Report 01

EN-RP-105, Att.9.5 Refuel 21 Outage ALARA Report 00

Miscellaneous

Documents Revision

Number Title or Date

EC 0000042470 Evaluate TSR 2008-24, 2010-01, 2011-30, 2012-24, February 20,

2012-33, 2012-36, 2011-79 as Long-Term Shielding 2013

2017 Annual Radiation Protection Program Report 06

Waterford-3 Abbreviated 5-Year Exposure Reduction Plan December 4,

2018-2022 2017

71124.04 - Occupational Dose Assessment

Condition Reports

HQN-2016-1136 WF3-2016-07300 WF3-2017-01829 WF3-2017-02024 WF3-2017-06719

WF3-2017-06758 WF3-2017-07702 WF3-2018-01726 WF3-2017-03148

Procedures

Number Title Revision

EN-RP-131 Air Sampling 16

EN-RP-201 Dosimetry Administration 05

EN-RP-204 Special Monitoring Requirements 11

EN-RP-205 Prenatal Monitoring 03

EN-RP-208 Whole Body Counting/In-Vitro Bioassay 07

EN-RP-312 Operation and Calibration of the Canberra GEM-5 01

EN-RP-314 Passive Monitor Sensitivity Testing 00

Audits and Self-Assessments

Number Title Date

January 16,

LO-WLO-2016-00037 Self-Assessment: Bioassay Program

2017

LO-WLO-2017-00069 Self-Assessment: Occupational Dose Assessment July 23, 2018

Calibration Records

Number Title Date

017027353 Canberra GEM-5 Calibration Data Sheet April 25, 2018

Miscellaneous

Documents

Number Title Date

Entergy Waterford-3 Radiation Protection Department

2017-2018 September 4, 2018

Respiratory Improvement Plan

Review of Neutron Dose Estimates 2016 July 25, 2017

Field Trials with the Use of the REM-500 at Waterford-3 July 28, 2017

Review of the Capabilities of the Passive Monitoring

October 4, 2017

Program to Detect Intakes at Waterford-3

71151 - Performance Indicator Verification

Condition Reports

2017-07707 2017-08036 2017-08367 2017-08790 2017-09261 2017-09507

2017-09512 2017-09637 2018-00678 2018-02077 2018-02656 2018-02870

Procedures

Number Title Revision

EP-001-001 Recognition and Classification of Emergencies 32, 33

EP-002-010 Notifications and Communications 313, 314, 315

EP-002-052 Protective Action Guidelines 25

EPP-424 Siren Testing and Siren System Administrative Controls, 19

71152 - Identification and Resolution of Problems

Condition Reports

CR-WF3-2018-01054 CR-WF3-2018-01849 CR-WF3-2017-07486 CR-WF3-2018-01981

CR-WF3-2017-09887 CR-WF3-2018-01049 CR-WF3-2018-01978 CR-WF3-2018-01994

CR-WF3-2018-06078 CR-WF3-2018-05252

Procedures

Number Title Revision

EN-LI-108 Att. 9.1 10 CFR 21 Discovery Determination & Reportability 9

Evaluation Sheet for CR-WF3-2018-1994

EN-DC-205 Maintenance Rule Monitoring 6

Drawings

Number Title Revision

B425 T7075B1 Control Loop Diagram CC-Dry Cooling tower B Fan 4

Cooling

B425 T7070BD Control Loop Diagram CC-Dry Cooling tower B Outlet 4

Temp

B425 T5009A Control Loop Diagram HVR-CCW Pump Heat Exchanger 5

A Room Temp

71153 - Event Followup

Miscellaneous

Documents

Number Title Date

W3F1-2017-0076 NRC Performance Indicator (PI) Data - 3rd Quarter 2017 October 6,

ROP Data 2017

W3F1-2018-0004 NRC Performance Indicator (PI) Data - 4th Quarter 2017 January 9,

ROP Data 2018

W3F1-2018-0024 NRC Performance Indicator (PI) Data - 1st Quarter 2018 April 12,

ROP Data 2018

W3F1-2018-0042 NRC Performance Indicator (PI) Data - 2nd Quarter 2018 July 13, 2018

ROP Data

The following items are requested for the

Occupational Radiation Safety Inspection

at Waterford-3

Dates of Inspection: 09/10/2018 to 09/14/2018

Integrated Report 2018003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Monday, August 13, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.02 should be in a file/folder titled

2-A, applicable organization charts in file/folder 2-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspector will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via

e-mail at Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: April 24, 2017

A. List of contacts and telephone numbers for ALARA program personnel. Please include

area code and prefix. If work cell numbers are appropriate, then please include them as

well.

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, LARs, and LERs, written since the date of last

inspection, focusing on ALARA

D. Procedure index for ALARA Program procedures and other related disciplines.

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Planning

3. ALARA Reviews

4. ALARA Committee

5. Radiation Work Permit Preparation

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of last inspection, related to the ALARA

program, including exceeding RWP Dose Estimates.

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspector can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspector can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. List of work activities (RWPs) greater than 1 rem, since date of last inspection,

including the original dose estimates and actual doses accrued. (Excel format

preferred). Please provide all revisions/changes, as well as any related RWPs that

support the work activity.

Provide any post evaluations, lessons learned, and/or corrective action documents

generated as a result of this work activity. If available, provide any justifications/reasons

for actual dose exceedances of the initial dose estimate.

I. List of active work activities (RWPs) that will be in use while we are onsite, including the

dose and dose rate settings, and if available, the planned dose.

J. Site dose totals for the past 3 years (based on dose of record). Also provide the current

year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide

another document that separates the online and outage doses for the past 3 years.

K. Most recent assessment of your isotopic mix, including the hard-to-detect radionuclides

and alpha hazards. Include a list of new and historical exposure issues (radiological

source term or high exposure areas/activities).

L. If available, provide a copy of the ALARA outage report or evaluation for the two most

recently completed outages for each unit

M. Please provide the methods/reports that are in your process to meet the requirements of

CFR 20.1101(c) for periodic review of your RP program.

N. Current exposure trends (BRAC dose rates and/or source term information)

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection: September 12, 2016

A. List of contacts and telephone numbers for the Dose Assessment personnel. Please

include area code and prefix. If work cell numbers are appropriate, then please include

them as well.

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and

LERs written since date of last inspection, related to Occupational Dose Assessment

D. Procedure indexes for Occupational Dose Assessment procedures and other related

disciplines.

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Electronic Dosimeters

5. Air Sample Analysis

6. Performance of High or Special Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program (Internal Dose Assessment)

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspector can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspector can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format) If codes are used,

please provide a legend for each column where a code is used.

H. List of positive whole body counts (excluding K-40) since date of last inspection, include

date(s), reason(s), activity assessed, and doses calculated and assigned. Names and

personal information can be redacted, if desired

I. Part 61 analyses or other analyses of plant isotopic mixture (alpha, beta, gamma, and

neutron) for appropriate instrumentation calibration sources and dosimetry selection and

hard-to-detect plant nuclide scaling factors for intakes/uptakes.

J. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results and which dosimeter(s) is (are) use at the site and for what purpose(s) (DLR,

neutron, environmental, etc.).

K. Please provide the latest assessment of your radiological source term as it relates to the

internal/external exposure of workers.

L. If available, please provide your latest source term reduction strategy.

M. Have available for on-site review the LLDs or MDAs for each onsite WBC or other

internal dose assessment instrumentation.

N. If available, please provide the latest neutron source term characterization.

Describe why the neutron dosimetry used is appropriate for these locations.

O. A list of airborne radioactivity areas (and associate RWPs) where DAC-hr monitoring

was used with air sampling to track and assign dose (BZ lapel air samples, etc.).

P. Please have available for on-site review, a list of workers that declared a pregnancy

since the last inspection. Declared Pregnant Worker monitoring of worker and fetus.

Please provide the most recent NRC Form 5 for these individuals. No more than three

are requested. Please redact any sensitive information.

Q. A list of EDEX or multi-badge dosimetry uses since the last inspection, include the

associated RWP and dose accrued.

ML18304A163

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NFO Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:DRP/D RI:DRP/D Tl:DRS/IPAT BC:DRS/EB1 Bc:DRS/EB2 BC:DRS/PSB2

NAME FRamirez CSpeer GMiller TFarnholtz GWerner HGepford

SIGNATURE FCR CAS GBM TRF GEW hjg

DATE 10/16/2018 10/17/18 10/25/18 10/25/2018 10/24/2018 10/25/18

OFFICE BC:DRS/OB BC:DRP/D

NAME VGaddy NOKeefe

SIGNATURE TJF for NFO

DATE 10/25/2018 10/29/2018