IR 05000382/2023010 | 31 January 2024 | Comprehensive Engineering Team Inspection Report 05000382/2023010 | Stroke time Arc flash Significance Determination Process Foreign Material Exclusion Power Uprate |
IR 05000382/2023003 | 23 January 2024 | Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
ML23340A229 | 28 December 2023 | Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A144 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23312A183 | 14 November 2023 | Integrated Inspection Report 05000382/2023003 and Notice of Violation | Offsite Dose Calculation Manual Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Fire Protection Program Overexposure Overspeed trip |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000382/2023401 | 4 October 2023 | Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000382/2023005 | 21 August 2023 | Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) | Fitness for Duty Cyber Security License Renewal |
IR 05000382/2023301 | 15 August 2023 | NRC Initial Operator Licensing Examination Approval 05000382/2023301 | |
IR 05000382/2023002 | 8 August 2023 | Integrated Inspection Report 05000382/2023002 | Ultimate heat sink Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Continuous fire watch Fire Protection Program Fire Watch Siren Overspeed trip |
IR 05000382/2023402 | 7 August 2023 | NRC Security Inspection Report 05000382/2023402 (Full Report) | Fitness for Duty |
IR 05000382/2023040 | 12 July 2023 | Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter | Past operability Enforcement Discretion |
ML23191A456 | 10 July 2023 | Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information | Commercial Grade Dedication Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
ML23158A104 | 8 June 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 | Cyber Security |
ML23145A227 | 2 June 2023 | 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion | Past operability Enforcement Discretion |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23117A217 | 1 May 2023 | Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment | |
IR 05000382/2023001 | 24 April 2023 | Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion | Unanalyzed Condition High winds Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment Tornado-Generated Missile Tornado Missile Protection Operability Determination Earthquake Fire Protection Program Power change Unidentified leakage |
ML23111A213 | 21 April 2023 | Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities | Incorporated by reference |
ML23110A112 | 20 April 2023 | Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | |
ML23108A254 | 18 April 2023 | WCGS Information Request, Security IR 2023401 | Fitness for Duty |
IR 05000382/2023403 | 17 April 2023 | Security Baseline Inspection Report 05000382/2023403 | Affidavit |
ML23093A212 | 3 April 2023 | Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 | |
ML23089A060 | 30 March 2023 | Entergy Operations, Inc. - Fleet Project Manager Assignment | |
ML23088A392 | 29 March 2023 | Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | |
ML23080A288 | 21 March 2023 | Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc | Decommissioning Funding Plan |
ML23059A259 | 7 March 2023 | Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Ultimate heat sink |
ML23065A200 | 3 March 2023 | EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors | |
ML23060A109 | 1 March 2023 | Proof of Financial Protection (10 CFR 140.15) | |
IR 05000382/2022006 | 1 March 2023 | Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) | Fitness for Duty Commercial Grade Dedication Enforcement Discretion Cyber Security License Renewal Exemption Request COVID-19 |
ML22322A109 | 17 February 2023 | Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
IR 05000382/2023090 | 1 February 2023 | Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 | Significance Determination Process Preliminary White Finding |
ML23032A506 | 1 February 2023 | Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 | Safe Shutdown Boric Acid Shutdown Margin Surveillance Frequency Control Program Operability Assessment |
ML23030A664 | 27 January 2023 | Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors | |
IR 05000382/2022004 | 26 January 2023 | Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 | Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Severe Accident Management Guideline Maintenance Rule Program Fire Protection Program Unidentified leakage Siren |
ML23024A082 | 20 January 2023 | Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection | |
ML23018A220 | 18 January 2023 | Quality Assurance Program Manual Reduction in Commitment | |
IR 05000382/2022091 | 12 January 2023 | Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation | Significance Determination Process Preliminary White Finding |
IR 05000382/2022003 | 5 January 2023 | Revised Integrated Inspection Report 05000382/2022003 | Internal Flooding Functionality Assessment Operability Determination Fire Protection Program |
ML22342B140 | 2 December 2022 | 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors | |
ML22300A208 | 30 November 2022 | Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Tornado Missile Protection Large early release frequency |
ML22332A529 | 29 November 2022 | Notification of NRC Initial Operator Licensing Examination 05000382/2023301 | |
IR 05000382/2022013 | 28 November 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 | Past operability Anchor Darling Condition Adverse to Quality Significance Determination Process Large early release frequency Earthquake Power-Operated Valves Weak link |
IR 05000382/2022002 | 1 November 2022 | Revised Integrated Inspection Report 05000382/2022002 | Boric Acid High winds High Radiation Area Grab sample Offsite Dose Calculation Manual Stroke time Weld Overlay Enforcement Discretion Met Tower Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Locked High Radiation Area FLEX Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Spent Fuel Pool Instrumentation Liquid penetrant Fire Protection Program Dissimilar Metal Weld Scaffolding Substantial potential for overexposure Substantial potential for an overexposure Downpower Overexposure |