October 24, 2022

SUBJECT:

WATERFORD STEAM ELECTRIC STATION UNIT 3 NRC SECURITY BASELINE INSPECTION REPORT 05000382/2022402

Dear John Ferrick:

On October 6, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3. On October 6, 2022, the NRC inspectors discussed the results of this inspection with John Jarrell, Director of Regulatory Assurance, Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2022402

Enterprise Identifier:

I-2022-402-0011

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, LA

Inspection Dates:

September 01, 2022 to October 06, 2022

Inspectors:

D. Childs, Resident Inspector

D. Hostetter, Physical Security Inspector

A. Meyen, Physical Security Inspector

A. Patz, Senior Resident Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Waterford Steam Electric Station,

Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program through completion of the following procedure elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All requirements

Tier II: All requirements Tier III: All requirements

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program beginning on September 1, 2022.

The following elements were evaluated:

Review of Power Reactor Target Sets (1 Sample)

(1)02.01, 02.02 (a-f), 02.03, 02.04 (a-b),

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 6, 2022, the inspectors presented the security baseline inspection results to John Jarrell, Director of Regulatory Assurance, Performance Improvement and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Condition Reports

CR-WF3-2020-04053, CR-WF3-2020-04120, CR-WF3-2020-

04418, CR-WF3-2020-04436, CR-WF3-2020-04488, CR-

WF3-2020-6818, CR-WF3-2020-06840, CR-WF3-2020-

06921, CR-WF3-2021-00235, CR-WF3-2021-00509, CR-

WF3-2021-06011, CR-WF3-2021-03262, CR-WF3-2021-

03732, CR-WF3-2021-04767, CR-WF3-2021-04987, CR-

WF3-2021-05037, CR-WF3-2021-05134, CR-WF3-2021-

05456, CR-WF3-2021-05556, CR-WF3-2021-05678, CR-

WF3-2022-01688, CR-WF3-2022-03806, CR-WF3-2022-

04706, CR-WF3-2022-04707, CR-WF3-2022-04708, CR-

WF3-2022-06351

Multiple

Corrective Action

Documents

Resulting from

Inspection

CR-WF3-2022-

06920, CR-WF3-

22-06925

Multiple

EN-LI-102

Corrective Action Program

Revision 47

EN-MA-157

Maintenance Configuration Control

Revision 3

EN-NS-212

Weapons Maintenance Program

Revision 8

EN-NS-220

Managing the Safety/Security Interface

Revision 5

EN-NS-238

Firearms & Security Equipment Accountability

Revision 1

MM-004-874

Site Security Diesel PM

Revision 305

PS-012-109

Security Equipment Inspection & Testing

Revision 45

PS-012-109-01

Turnstile Test

Revision 1

PS-012-109-02

Door Testing

Revision 0

PS-012-109-03

Intrusion Detection System Testing

Revision 1

PS-012-109-04

Protected Area Active Vehicle Barrier Testing

Revision 0

PS-012-109-05

Metal Detector Testing

Revision 0

PS-012-109-06

Explosive Detector Calibration

Revision 0

PS-012-109-07

X-ray Device Testing

Revision 1

PS-012-109-08

Protected Area Equipment Tamper Test

Revision 0

PS-012-109-09

PA Barrier Inspections

Revision 0

71130.04

Procedures

PS-012-109-10

BRE-SOCA Equipment Inspection/Testing

Revision 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PS-012-109-11

Access Authorization Duress Alarm Test

Revision 0

PS-012-109-13

SOCA HGIS Turnstile Test

Revision 0

PS-012-109-14

SOCA Tamper Test

Revision 0

PS-013-101

Security Communications

Revision 305

PS-015-105

Alarm Station Operators

Revision 29

PS-018-108

Loss or Degradation of Security Equipment & Systems

Revision 13

PS-102-109-12

SMC Alarm Station Testing

Revision 0

WF3 Steam

Electric Station

Physical Security,

Safeguards

Contingency &

Training &

Qualification Plan

Physical Security Plan

Revision 16

WLP-SECI-

COMPME

Compensatory Measures

Revision 1

Self-Assessments

QA-16-2021-W3-

WF3 Assessment

2/14/21

WO# 53012297

Perform Functional Test of Security Diesel Generator

08/26/2022

Work Orders

WO# 53015537

Test All Security BRE Glare Lights, Batteries, & UPS

09/22/2022

Corrective Action

Documents

CR

CR-WF3 2020-04014, CR-WF3 202006215, CR-WF3

2006380, CR-WF3 202100804, CR-WF3 202101076, CR-

WF3 202101510, CR-WF3 202101513, CR-WF3 202102429,

CR-WF3 202103687, CR-WF3 202203583, CR-WF3

2203584, CR-WF3 202205130, CR-WF3 2022131

Multiple

FCOFLLR-3.0

Determine Amount of Force Required to Prevent an

Unauthorized Act

FJPM-SEC-1.0

Perform Critical Administrative Task

FJPM-SEC-20

Respond to Contingency Events and Execute Protective

Strategy

FJPM-SEC-25.1

Handgun Daylight Qualification

8/1/19

FJPM-SEC-25.2

Handgun Night/Low Light Qualification

8/1/19

FJPM-SEC-27.1

Daylight Rifle Qualification

6/27/19

71130.07

Miscellaneous

FJPM-SEC-27.2

Night/Low Light Rifle Qualification

6/27/19

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FJPM-SEC-27.3

Thermal Optic Qualification

7/11/19

FJPM-SEC-27.4

Tactical Course of Fire

5/18/20

SEL

Safeguards Event Log

8/7/22-

9/15/22

WLP-SECI-

PARESP

Patrol Procedures and Response to Alarms

WSF-041

Physical Fitness Test Course, Task 22

EN-NS-112

Medical Program

EN-NS-300

Security Training Program

EN-NS-301

Security SAT Process

EN-NS-303

Security Training Oversight Program

EN-NS-304-1

On the Job Training Process

EN-NS-304-4

Task Performance Evaluation Process

Procedures

EN-NS-307

Security Supervisor Training and Development Program

Self-Assessments

QA-16-2021-W3-

Audit Report Package Security/Cyber Security

2/13/21

CR-WF3-2022-

05791

08/10/2022

Corrective Action

Documents

Resulting from

Inspection

CR-WF3-2022-

06618

09/26/2022

71130.14

Procedures

EN-NS-306

Development and Maintenance of Target Sets

7