October 30, 2018

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000382/2018003

Dear Mr. Dinelli:

On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Waterford Steam Electric Station, Unit 3. On October 11, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Neil OKeefe, Chief Branch D Division of Reactor Projects

Docket No. 50-382 License No. NPF-38

Enclosure:

Inspection Report 05000382/2018003 w/ Attachments:

1. Documents Reviewed 2. NRC Request for Information

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s):

05000382

License Number(s):

NPF-38

Report Number(s):

05000382/2018003

Enterprise Identifier: 1-2018-003-0002

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, Louisiana

Inspection Dates:

July 1, 2018 to September 30, 2018

Inspectors:

F. Ramírez, Senior Resident Inspector

C. Speer, Resident Inspector

J. Dixon, Senior Project Engineer

T. Farina, Senior Operations Engineer

P. Elkmann, Senior Emergency Preparedness Inspector

N. Greene, PhD, Senior Health Physicist

I. Anchondo, Reactor Inspector, Engineering Branch 2

G. George, Senior Reactor Inspector, Engineering Branch 1

Approved By:

Neil OKeefe

Branch Chief

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

Additional Tracking Items

Type Issue number Title Report Section Status URI 05000382/2017008-04 Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval 71111.21M Closed

PLANT STATUS

The plant operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection External Flooding

The inspectors evaluated readiness to cope with external flooding in the safety-related switchgear room A on August 1, 2018.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Shield building ventilation train A with train B out of service for maintenance on July 17, 2018
(2) Auxiliary feedwater system following an extended system outage on August 19, 2018
(3) Emergency feedwater train A with train B out of service for maintenance on August 21, 2018
(4) Emergency diesel generator A with emergency diesel generator B out of service for maintenance on September 11, 2018

Completed Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the reactor auxiliary building controlled ventilation area system on September 12, 2018.

===71111.05AQFire Protection Annual/Quarterly

Quarterly Inspection===

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire area NS-TB-001, turbine building +15.00 east on July 18,2018
(2) Fire area NS-TB-003, turbine building mezzanine +40.00 east on August 19, 2018
(3) Fire area RAB 34-001, safeguards valve gallery rooms A and B on August 21, 2018
(4) Fire area NS-TB-004, turbine building +40.00 west on August 22, 2018
(5) Fire area RAB2-001, heating and ventilation mechanical room on September 11, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance during an unannounced fire drill in the +35 reactor auxiliary building electrical penetration B area on September 21, 2018.

===71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification===

The inspectors observed and evaluated requalification scenario in the simulator on July 23, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated control room performance during control element assembly testing on August 3, 2018.

Operator Exams (1 Sample)

The inspector reviewed and evaluated requalification examination results on August 27, 2018.

===71111.12QMaintenance Rule Implementation

Routine Maintenance Effectiveness===

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Dry cooling tower sump pump failures on July 24, 2018
(2) Controlled ventilation area system routine assessment of maintenance on August 8, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Emergent work related to electrical bus 31AB on July 25, 2018
(2) Risk assessment associated with work in the transformer yard on August 13, 2018
(3) Planned yellow risk due to emergency feedwater system train B work window on August 21, 2018
(4) Planned yellow risk due to emergency diesel generator B work window on September 10, 2018
(5) Planned yellow risk due to emergency diesel generator A work window on September 27, 2018

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Operability determination for charging pump B due to relay calibration values found out of tolerance on July 19, 2018
(2) Functionality assessment for motor generator set B due to high vibrations on July 31, 2018
(3) Operability determination for emergency diesel generator B due to low field voltage and current during testing on August 6, 2018
(4) Operability determination for emergency diesel generator B subgroup relays due to the failure of the safety injection actuation signal relay on August 21, 2018

71111.18Plant Modifications

The inspectors evaluated the following temporary modification:

(1) Temporary replacement of failed pressurizer proportional heater bank 1 heaters 3 and 4 with heaters from backup bank 2 and 3 on August 1, 2018
(2) Ultimate heat sink margin restoration Phase 3 permanent modification on August 15, 2018

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Train A sequencer following relay replacement on August 6, 2018
(2) Charging pump A after seal pump/motor and gearbox replacement on August 9, 2018
(3) Auxiliary feedwater pump to motor coupling removal/reinstallation and pump outboard bearing gasket replacement on August 14, 2018
(4) Reactor auxiliary building +46 HVAC air handling unit following planned maintenance on September 5, 2018
(5) Auxiliary component cooling water pump B following emergent bearing oil replacement on September 18, 2018
(6) Emergency diesel generator A following planned relay replacement on September 27, 2018

===71111.22Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine===

(1) Emergency feedwater pump A operability run on July 10, 2018
(2) High pressure safety injection pump B operability run on July 25, 2018
(3) Reactor trip circuit breaker #5 test on August 1, 2018
(4) Core protection calculator A test on August 2, 2018
(5) Control room emergency filtration unit outside air intake upstream isolation valve test on August 14, 2018

71114.02Alert and Notification System Testing

The inspector evaluated the maintenance and testing of the alert and notification system on August 1, 2018.

71114.03Emergency Response Organization Staffing and Augmentation System

The inspector evaluated the readiness Emergency Preparedness Organization on August 2, 2018.

71114.04Emergency Action Level and Emergency Plan Changes

The inspector evaluated submitted changes to the Waterford 3 Steam Electric Station Emergency Plan, Revision 49, and Procedure EP-001-001, Recognition and Classification of Emergency Conditions, Revision 33, between July 9 and 12, 2018. This evaluation does not constitute NRC approval.

71114.05Maintenance of Emergency Preparedness

The inspector evaluated the maintenance of the emergency preparedness program on August 6 and 7, 2018.

71114.06Drill Evaluation Emergency Planning Drill

The inspectors evaluated an emergency planning drill on August 29,

RADIATION SAFETY

71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning

The inspector evaluated the licensees radiological work planning by reviewing the following activities:

(1) RWP 2016-0118, Loading of Dry Fuel Storage Cask #18, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 02
(2) RWP 2016-0119, Loading of Dry Fuel Storage Cask #19, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 01
(3) RWP 2016-0123, Loading of Dry Fuel Storage Cask #23, with Spent Fuel and Transport including all DFS Support Activities to include Set Up/Demobilization, Revision 00
(4) RWP 2017-0515, RCP 1B Motor Replacement, Revision 00
(5) RWP 2017-0610, Erect/Dismantle Scaffolding in the Reactor Containment Building, Revision 00
(6) RWP 2017-0702, Reactor Disassembly Activities, Revision 00
(7) RWP 2017-0705, Reactor Reassembly Activities, Revision 00
(8) RWP 2018-0001, Radiation Protection to Perform Job Coverage, Routine Surveys, Inspections and Walkdowns, Revision 00
(9) RWP 2018-0006, Radwaste Processing/Shipping in all Radiologically Controlled Areas, Revision 00

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04Occupational Dose Assessment Source Term Characterization

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) MS08: Heat Removal Systems (07/01/2017-06/30/2018)
(2) MS09: Residual Heat Removal Systems (07/01/2017-06/30/2018)
(3) MS10: Cooling Water Support Systems (07/01/2017-06/30/2018)
(4) EP01: Drill/Exercise Performance Sample (10/01/2017-06/30/2018)
(5) EP02: Emergency Response Organization Drill Participation Sample (10/01/2017-06/30/2018)
(6) EP03: Alert And Notification System Reliability Sample (10/01/2017-06/30/2018)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Process analog control card failures that resulted in a Part 21 report to the NRC on September 6, 2018
(2) Maintenance rule failure classification of the fast bus transfer failure during the Notification of Unusual Event in June 2017 on September 13, 2018

71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports

The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Reports 05000382/2018-002-00 and 05000382/2018-002-01, Unplanned Loss of a Train of Control Room Outside Air Intake Radiation Monitors Results in a Condition Prohibited by Technical Specifications, on August 16, 2018.
(2) Licensee Event Report 05000382/2017-002-01, Automatic Reactor Scram due to the Failure of Fast Dead Bus Transfer Relays to Automatically Transfer Station Load to Off-Site Power on a Main Generator Trip, on August 16,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

INSPECTION RESULTS

Unresolved Item (Closed)

Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval URI 05000382/2017008-04 7111.21M

Description:

U.S. Nuclear Regulatory Commission (NRC) Design Bases Assurance Inspection Report 05000382/2017008 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML17362A424), dated December 28, 2017, documents Unresolved Item 05000382/2017008-04, Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval. During that inspection, the team reviewed the licensees change to the surveillance test intervals for the train A and B emergency diesel generators, which was completed in accordance with the Waterford surveillance frequency control program. As a result, both emergency diesel generators went from being tested every 18 months to each emergency diesel generator being tested every 36 months. The team concluded that the license had failed to correctly evaluate the change in accordance with the surveillance frequency control program change process per NEI 04-10, Risk Informed Method for Control of Surveillance Frequencies, Revision 1. Specifically, the licensee had not correctly evaluated NEI 04-10, step 1, Check for Prohibitive Commitments, and step 2, Can Commitments be Changed? of the change process. During the inspection, the team determined that this change would have necessitated a 10 CFR 50.59 safety evaluation and subsequent license amendment because it would have resulted in more than a minimal increase in likelihood of a malfunction of a component important to safety as previously described in the final safety analysis report. At the conclusion of the inspection, the team decided to address this item pending the review of the licensees previously documented corrective actions associated with the potential issue.

Since the conclusion of the inspection, the regulatory applicability of this unresolved item was addressed in NRC letter to Byron Generating Station, dated July 23, 2018, (ADAMS Accession Number ML18204A144). The letter documents the withdrawal of a non-cited violation associated with 10 CFR 50.59 requirements applicable to changes in surveillance test intervals of emergency diesel generators. The review was conducted by an independent NRC panel and the outcome was documented, in part, as follow;

In NEI 04-10 Step 2, a check is made to determine if the applicable regulatory commitments to the NRC can be changed. Evaluating changes to regulatory commitments is a separate activity based on a method acceptable to the NRC for managing and changing regulatory commitments (e.g., NEI 99-04). NEI 99-04 Section 3.1, Definitions, defines a regulatory commitment as an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC. A regulatory commitment is an intentional undertaking by the licensee to

(1) restore compliance with regulatory requirements, or
(2) complete a specific action to address an NRC issue or concern (e.g., generic letter, bulletin, order, etc.)...Thus, there was no associated regulatory commitment to change under NEI 04-10 Step 2, and it was appropriate for the licensee to continue to step through the NDE 04-10 process to evaluate an EDG surveillance frequency change.

Therefore, given the circumstances for the non-cited violation withdrawal and its applicability to this unresolved item, the NRC has concluded that there is no violation and no license amendment was required. This item is closed.

Corrective Action Reference(s): N/A

EXIT MEETINGS AND DEBRIEFS

On August 9, 2018, the inspector presented the emergency preparedness inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff. The inspector verified that no proprietary information was retained or documented in this report.

On August 27, 2018, the inspector presented the annual requalification inspection results to Mr. D. Constance, Operations Training Superintendent. The inspector verified no proprietary information was retained or documented for this inspection report.

On September 13, 2018, the inspector presented the baseline radiation safety inspection results to Mr. S. Vazquez, General Manager of Plant Operations, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.

On October 11, 2018, the inspector presented the quarterly resident inspector inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Condition Reports

CR-WF3-2018-04408

Procedures

Number

Title

Revision

EN-LI-100

Process Applicability Determination

OP-901-521

Severe Weather and Flooding

26

Drawings

Number

Title

Date

G-580

Nuclear Plant Island Structure Flood Wall

Penetrations, Sheet 1

July 10, 2018

G-580

Nuclear Plant Island Structure Flood Wall

Penetrations, Sheet 2

April 3, 2011

G-580

Nuclear Plant Island Structure Flood Wall

Penetrations, Sheet 3

April 25, 1991

71111.04 - Equipment Alignment

Condition Reports

CR-WF3-2017-01509 CR-WF3-2017-04445 CR-WF3-2018-04638 CR-WF3-2017-07561

CR-WF3-2017-07550

Work Orders

00475847

00476848

00433888

00397848

00427894

00468224

00467879

00435999

Procedures

Number

Title

Revision

OP-008-008

Shield Building Ventilation

OP-003-035

Auxiliary Feedwater

309

OP-009-003

Emergency Feedwater

309

OP-009-002

Emergency Diesel Generator

346

OP-002-010

Reactor Auxiliary Building HVAC and Containment

Purge

2

71111.05 - Fire Protection

Procedures

Number

Title

Revision

NS-TB-001

Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +15.00

East

NS-TB-003

Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +40.00

East

RAB 34-001

Waterford-3 S.E.S Pre-Fire Strategy Elev. -15.50 RAB (RCA)

NS-TB-004

Waterford-3 S.E.S Pre-Fire Strategy Turbine Building +40.00

West

RAB 2-001

Waterford-3 S.E.S Pre-Fire Strategy Elev. +46.00 RAB (RCA)

EN-TQ-125

Fire Brigade Drills

RAB 6-001

Waterford-3 S.E.S Pre-Fire Strategy Elev. +35.00 RAB

Miscellaneous

Documents

Number

Title

Date

Waterford 3 Fire Brigade Drill 2018 Completion

Tracking Matrix

September

2018

Waterford 3 Fire Brigade Drill 2017 Completion

Tracking Matrix

September

2018

Waterford 3 Fire Brigade Drill 2016 Completion

Tracking Matrix

September

2018

71111.11 - Licensed Operator Requalification

Condition Reports

CR-WF3-2018-03123 CR-WF3-2018-03213 CR-WF3-2018-03085 CR-WF3-2017-06573

CR-WF3-2016-05408 CR-WF3-2016-07255 CR-WF3-2018-02492 CR-WF3-2017-00464

CR-WF3-2017-02044 CR-WF3-2017-01218 CR-WF3-2017-01623 CR-WF3-2017-03600

Procedures

Number

Title

Revision

OP-100-010

Equipment Out of Service

316

OP-901-110

Pressurizer Level Control Malfunction

OP-901-220

Loss of Condenser Vacuum

303

OP-901-212

Rapid Plant Power Reduction

OP-902-000

Standard Post Trip Actions

OP-902-001

Reactor Trip Recovery

OP-902-008

Functional Recovery

OP-902-009

Standard Appendices

317

EP-001-001

Recognition & Classification of Emergency Conditions

OP-903-005

Control Element Assembly Operability Check

OP-903-094

ESFAS Subgroup Relay Test - Operating

Miscellaneous

Documents

Number

Title

Revision

or Date

WSXM-LOR-184EXM 2018 Cycle 4 Annual Simulator Exam - Week 3

E-214

Annual Requalification Results Summary

August 20,

2018

71111.13 - Maintenance Risk Assessment and Emergent Work Review

Condition Reports

CR-WF3-2018-04154 CR-WF3-2018-04156 CR-WF3-2018-04180 CR-WF3-2018-05046

Work Orders

00432117

00427084

00432121

Procedures

Number

Title

Revision

EN-FAP-WM-107

Emergent Issues Process

EN-MA-125

Troubleshooting Control and Maintenance Activities

EN-WM-104

On Line Risk Management

OI-037-000

Operations Risk Assessment Guideline

313

EN-WM-104

On Line Risk Management

EN-OP-119

Protected Equipment Postings

Miscellaneous

Documents

Number

Title

Date

EN-OP-119 Att. 9.1

Protected Equipment Postings List for Emergency

Diesel Generator A work window

September 23,

2018

EN-OP-119 Att. 9.1

Protected Equipment Postings List for Emergency

Feedwater 228A and 224A

August 20,

2018

71111.15 - Operability Evaluations

Condition Reports

CR-WF3-2018-04025 CR-WF3-2018-04021 CR-WF3-2018-04114 CR-WF3-2018-04709

Procedures

Number

Title

Revision

OP-008-008

Shield Building Ventilation

OP-903-068

Emergency Diesel Generator and Subgroup Relay

Operability Verification

21

71111.18 - Plant Modifications

Condition Reports

CR-WF3-2017-02774 CR-WF3-2018-04367 CR-WF3-2018-04296 CR-WF3-2018-04677

Procedures

Number

Title

Revision

EN-DC-136

Temporary Modifications

OP-001-001

Reactor Coolant System Fill and Vent

OP-903-097

Pressurizer Heater Capacity Verification

OP-901-502

Evacuation of Control Room and Subsequent Plant

Cooldown

Drawings

Number

Title

Revision

5817-14492

UHS Air Deflector Structure Details Sheets 1 - 41

B424 Sheet 291

Pressurizer Proportional Heater Bank-1

B424 Sheet 286

Pressurizer Backup Heaters Bank 2

B424 Sheet 287

Pressurizer Backup Heaters Bank 3

B289 Sheet 23A1

480V Switchgear 3A32 Programmer Settings

B289 Sheet 23

Power Distribution and Motor Data 480V Switchgear 3A32

One Line Diagram

B289 Sheet 101

Power Distribution and Motor Data 480V Distribution Panels

B289 Sheet 158

Power Distribution and Motor Data 480V Switchgear Front

View

Miscellaneous

Documents

Number

Title

Revision

EC-71594

Temporary Replace Failed Proportional Heater Bank 1

Heaters 3 (position F2) and 4 (position H2) with heaters from

Backup Bank 2and 3 (positions E1 and C2)

EC-54532

Ultimate Heat Sink Margin Restoration - Phase 3

EC-52043

Ultimate Heat Sink Margin Restoration

71111.19 - Post-Maintenance Testing

Condition Reports

CR-WF3-2018-04419 CR-WF3-2018-07223 CR-WF3-2018-04415 CR-WF3-2018-01508

CR-WF3-2018-01004 CR-WF3-2018-00589 CR-WF3-2017-05397 CR-WF3-2018-04463

CR-WF3-2017-01483 CR-WF3-2017-05329 CR-WF3-2018-04444 CR-WF3-2017-04606

CR-WF3-2018-04632 CR-WF3-2018-05448

Work Orders

00496628

00434744

00364478

2735553

00450472

2756221

2713822

2746212

2745254

2735551

00477067

50551501

2805322

00496405

Procedures

Number

Title

Revision

OP-903-068

Emergency Diesel Generator and Subgroup Relay Operability

Verification

21

OP-009-002

Emergency Diesel Generator

346

OP-903-003

Charging Pump Operability Check

2

OP-904-007

Charging Pump Pulsation Dampener Pressure Check

016

OP-903-131

AFW High Discharge Pressure Trip Test

2

MM-006-161

AFW Pump Disassembly, Inspection and Reassembly

MM-006-162

Diesel Generator Cylinder Head Removal, Inspection and

Installation

EN-HU-106

Procedure and Work Instruction Use and Adherence

EN-MA-118

Foreign Material Exclusion

UNT-005-007

Plant Lubrication Procedure

304

OP-002-010

Reactor Auxiliary Building HVAC and Containment Purge

2

OP-903-050

Component Cooling Water and Auxiliary Component Cooling

Water Pump and Valve Operability Test

Drawings

Number

Title

Revision

G-168 Sheet 2

CVCS Flow Diagram

Miscellaneous

Documents

Number

Title

Revision

WLP-OPS-CVC00

CVCS training document

WF3-ME-18-00001

Charging Pump Pulsation Dampener Vibration Evaluation

EC-75478

Evaluation of Charging Pump Pulsation Dampener Impact on

Operability

PE Eval 153315

Head, Cylinder, Emergency Diesel Generator

71111.22 - Surveillance Testing

Condition Reports

CR-WF3-2018-04236 CR-WF3-2018-04214 CR-WF3-2018-04202 CR-WF3-2018-04314

CR-WF3-2018-04365

Work Orders

2645246

2819598

Procedures

Number

Title

Revision

OP-903-030

Safety Injection Pump Operability Verification

MI-005-214

Calibration of Flow Instruments

OP-903-006

Reactor Trip Circuit Breaker Test

MI-003-126

Core Protection Calculator Functional Test

OP-903-100

MOV Overload Bypass Test

310

OP-903-046

Emergency Feed Pump Operability Check

2

Drawings

Number

Title

Revision

B-424 Sheet 1153

Control Room Emergency Filtration Unit North Intake

Miscellaneous

Documents

Number

Title

Revision

SEP-WF3-IST-2

WF3 IST Plan

71114.02 - Alert and Notification System Testing

Condition Reports

2017-03818

2017-06905

Work Orders

2710344

2735556

2735558

Procedures

Number

Title

Revision

or Date

Updated Alert and Notification System Design Report, December

2014

FEMA REP-10 Design Report Addendum

July 14,

2015

EPP-422

Siren and Helicopter Warning System Maintenance,

EPP-424

Siren Testing and Siren System Administrative Controls,

71114.03 - Emergency Response Organization Staffing and Augmentation Systems

Condition Reports

2016-04434

2016-04435

2016-04436

2016-04437

2016-04438

2016-06548

2016-06547

2016-06549

2016-06949

2017-01152

2017-01154

2017-05394

2017-05396

2017-07826

2017-09090

Procedures

Number

Title

Revision

EN-EP-310

Emergency Response Organization Notification System

EN-EP-801

Emergency Response Organization

EP-002-015

Emergency Responder Activation

303

EPP-462

Evaluation of Pager Tests

71117.04 - Emergency Action Level and Emergency Plan Changes

Procedures

Number

Title

Revision

EN-EP-305

Emergency Planning 10CFR50.54(q) Review Program

Miscellaneous

Documents

Number

Title

Revision

10CFR50.54(q)(3) Screening Evaluation for EP-002-100

10CFR50.54(q)(3) Screening Evaluation for EN-EP-801

10CFR50.54(q)(3) Screening Evaluation for Emergency Plan

10CFR50.54(q)(3) Screening Evaluation for Emergency Plan

10CFR50.54(q)(3) Screening Evaluation for On-Shift Staffing

Analysis

10CFR50.54(q)(3) Screening for Emergency Plan

10CFR50.54(q)(3) Screening Evaluation for EP-001-001

71114.05 - Maintenance of Emergency Preparedness

Condition Reports

2016-04573

2016-04891

2016-05315

2016-05563

2016-05572

2016-06017

2016-06404

2016-07104

2016-07597

2017-00008

2017-01627

2017-01826

2017-02502

2017-03304

2017-04233

2017-05494

2017-05535

2017-05662

2017-05875

2017-06905

2017-06978

2017-07707

2017-08244

2017-08367

2017-08388

2017-09328

2017-09512

2017-09772

2017-09804

2017-09833

2018-00047

2018-00104

2018-00539

2018-00980

2018-01009

2018-02867

2018-02988

2018-03489

2018-04476

2018-04479

LO-HQNLO-2016-00050

LO-HQNLO-2016-00056

CRHQN-2018-01704

Work Orders

00422707

00422708

00448915

00450676

00451436

00451985

00461103

00476211

00488788

00489973

00492462

00495965

2580909

2702861

2707267

2772677

2728394

Procedures

Number

Title

Revision

EN-EP-306

Drills and Exercises

EN-EP-308

Emergency Planning Critiques

EN-EP-801

Emergency Response Organization

EN-LI-102

Corrective Action Program

2, 33

EN-LI-104

Self-Assessment and Benchmark Process

EN-QV-109

Audit Process

EP-001-010

Unusual Event

303

EP-002-015

Emergency Responder Activation

301

EP-003-020

Emergency Preparedness Drills and Exercises,

304

EP-003-030

Emergency Program Review, Updating, and Modification,

303

EP-003-040

Emergency Equipment Inventory,

308

EP-003-070

Emergency Communications Systems Routine Testing,

304

EPP-401

Review, Publication and Distribution of Public Information

Materials,

EPP-428

Emergency Facilities and Equipment Readiness,

306

Miscellaneous

Documents

Number

Title

Revision

or Date

Waterford3 Emergency Plan

47, 48, 49

LO-WLO-2017-0048

2017 Pre NRC Evaluation Exercise Assessment

October 16,

2017

LO-WLO-2017-00077

Pre NRC Program Inspection Assessment

QA-7-2017-W3-1

Emergency Preparedness Audit

May 26, 2017

QA-7-2018-W3-1

Emergency Preparedness Audit

May 10, 2018

Monthly Communications Drill

September 13,

2016

Monthly Communications Drill

January 31,

2017

Monthly Communications Drill

November 21,

2017

Monthly Communications Drill

April 3, 2018

Inspection of Emergency Diesel Generator

September 12,

2016

Inspection of Emergency Diesel Generator

July 6, 2017

Inspection of Emergency Diesel Generator

May 3, 2018

Emergency Communications Test Sheet

August 30, 2016

Emergency Communications Test Sheet

December 20,

2016

Emergency Communications Test Sheet

April 30, 2017

Emergency Communications Test Sheet

November 6,

2017

Emergency Communications Test Sheet

December 13,

2017

Emergency Communications Test Sheet

February 20,

2018

Readiness Condition - Control Room

December 12,

2016

Readiness Condition - Control Room

November 1,

2017

Readiness Condition - Control Room

April 3, 2018

Readiness Condition - Technical Support Center

July 6, 2017

Readiness Condition - Technical Support Center

December 4,

2017

Readiness Condition - Technical Support Center

June 19, 2018

Readiness Condition - Operational Support Center July 6, 2017

Readiness Condition - Operational Support Center April 3, 2018

Readiness Condition - Emergency Operations

Facility

September 29,

2016

Readiness Condition - Emergency Operations

Facility (March)

July 6, 2017

Readiness Condition - Emergency Operations

Facility (June)

July 6, 2017

Readiness Condition - Emergency Operations

Facility

April 3, 2018

Readiness Condition - Emergency Operations

Facility

June 19, 2018

Readiness Condition - Joint Information Center

December 4,

2017

Readiness Condition - Joint Information Center

April 3, 2018

Assembly Area Supervisors Kit Inventory

July 6, 2017

Assembly Area Supervisors Kit Inventory

June 19, 2018

After-Action Report for the Notification of Unusual

Event declared on July 17, 2017

Evaluation Report for the Medical Drill Conducted

February 12, 2016

February 18,

2016

W3D3-2016-0003

Evaluation Report for the Exercise Conducted

April 6, 2016

May 3, 2016

Evaluation Report for the Health Physics Drill

Conducted June 22, 2016

July 13, 2016

W3D3-2016-0006

Evaluation Report for the Exercise Conducted

June 15, 2016

July 15, 2016

W3E3-2016-0008

Evaluation Report for the Exercise Conducted

August 31, 2016

September 27,

2016

W3D3-2016-0009

Evaluation Report for the Drill Conducted

October 7, 2016

October 7, 2016

W3D3-2016-0008

Evaluation Report for the Drill Exercise Conducted

December 7, 2016

Evaluation Report for the Medical Drill Conducted

January 23, 2017

February 22,

2017

W3D3-2017-0004

Evaluation Report for the Control Room Breathing

Air Drill Conducted March 24, 2017

March 24, 2017

Evaluation Report for the Exercise Conducted

June 28, 2017

W3D3-2017-0007

Evaluation Report for the Control Room Breathing

Air Drill Conducted September 15, 2017

September 19,

2017

2017-05

Evaluation Report for the Drill Exercise Conducted

July 12, 2017, Revision 1

October 19,

2017

Evaluation Report for the Exercise Conducted

October 26, 2017

2017-017

Evaluation Report for the Focused Drill for Site

Accountability

November 29,

2017

Evaluation Report for the Exercise Conducted

December 13, 2017

Evaluation Report for the Exercise Conducted

February 21, 2018

Evaluation Report for the Control Room Breathing

Air Drill Conducted June 15, 2018

June 15, 2018

Evaluation Report for the Exercise Conducted

June 20, 2018

July 18, 2018

WF3-IC-17-00002

Engineering Report: Plant Paging System

Reliability Study

71114.06 - Drill Evaluation

Miscellaneous

Documents

Number

Title

Date

Red Team Site Drill Scenario Description

August 29,

2018

Notification Forms for Red Team Site Drill

August 29,

2018

71124.02 - Occupational ALARA Planning and Controls

Condition Reports

WF3-2017-03249 WF3-2017-03344

WF3-2017-03771

WF3-2017-03778 WF3-2018-00831

Procedures

Number

Title

Revision

EN-RP-100

Radiation Worker Expectations

EN-RP-105

Radiological Work Permits

EN-RP-109

Hot Spot Program

EN-RP-110

ALARA Program

Procedures

Number

Title

Revision

EN-RP-110-03

Collective Radiation Exposure (CRE) Reduction

Guidelines

EN-RP-110-04

Radiation Protection Risk Assessment Process

EN-RP-152

Conduct of Radiation Protection

Audits and Self-Assessments

Number

Title

Date

LO-WLO-2017-00069

Self-Assessment: Occupational ALARA Planning

and Controls

July 24, 2018

Radiation Work Permits

Number

Title

Revision

2016-0118

Loading of Dry Fuel Storage Cask #18 with Spent Fuel and

Transport including all DFS Support Activities to include Set

Up/Demob

2016-0119

Loading of Dry Fuel Storage Cask #19 with Spent Fuel and

Transport including all DFS Support Activities to include Set

Up/Demob

2016-0123

Loading of Dry Fuel Storage Cask #23 with Spent Fuel and

Transport including all DFS Support Activities to include Set

Up/Demob

2017-0515

RCP 1B Motor Replacement

2017-0610

Erect/Dismantle Scaffolding in the Reactor Containment

Building

2017-0702

Reactor Disassembly Activities

2017-0705

Reactor Reassembly Activities

2018-0001

Radiation Protection to Perform Job Coverage, Routine

Surveys, Inspections and Walkdowns

2018-0006

Radwaste Processing/Shipping in all Radiologically Controlled

Areas

ALARA Planning, In-Progress Reviews, and Post-Job Reviews

Number

Title

Revision

EN-RP-105, Att.9.5

Refuel 20 Outage ALARA Report

EN-RP-105, Att.9.5

Refuel 21 Outage ALARA Report

Miscellaneous

Documents

Number

Title

Revision

or Date

EC 0000042470

Evaluate TSR 2008-24, 2010-01, 2011-30, 2012-24,

2012-33, 2012-36, 2011-79 as Long-Term Shielding

February 20,

2013

2017 Annual Radiation Protection Program Report

Waterford-3 Abbreviated 5-Year Exposure Reduction Plan

2018-2022

December 4,

2017

71124.04 - Occupational Dose Assessment

Condition Reports

HQN-2016-1136

WF3-2016-07300

WF3-2017-01829

WF3-2017-02024

WF3-2017-06719

WF3-2017-06758

WF3-2017-07702

WF3-2018-01726

WF3-2017-03148

Audits and Self-Assessments

Number

Title

Date

LO-WLO-2016-00037

Self-Assessment: Bioassay Program

January 16,

2017

LO-WLO-2017-00069

Self-Assessment: Occupational Dose Assessment

July 23, 2018

Calibration Records

Number

Title

Date

017027353

Canberra GEM-5 Calibration Data Sheet

April 25, 2018

Procedures

Number

Title

Revision

EN-RP-131

Air Sampling

EN-RP-201

Dosimetry Administration

EN-RP-204

Special Monitoring Requirements

EN-RP-205

Prenatal Monitoring

EN-RP-208

Whole Body Counting/In-Vitro Bioassay

EN-RP-312

Operation and Calibration of the Canberra GEM-5

EN-RP-314

Passive Monitor Sensitivity Testing

Miscellaneous

Documents

Number

Title

Date

2017-2018

Entergy Waterford-3 Radiation Protection Department

Respiratory Improvement Plan

September 4, 2018

Review of Neutron Dose Estimates 2016

July 25, 2017

Field Trials with the Use of the REM-500 at Waterford-3

July 28, 2017

Review of the Capabilities of the Passive Monitoring

Program to Detect Intakes at Waterford-3

October 4, 2017

71151 - Performance Indicator Verification

Condition Reports

2017-07707

2017-08036

2017-08367

2017-08790

2017-09261

2017-09507

2017-09512

2017-09637

2018-00678

2018-02077

2018-02656

2018-02870

Procedures

Number

Title

Revision

EP-001-001

Recognition and Classification of Emergencies

2, 33

EP-002-010

Notifications and Communications

313, 314, 315

EP-002-052

Protective Action Guidelines

EPP-424

Siren Testing and Siren System Administrative Controls,

71152 - Identification and Resolution of Problems

Condition Reports

CR-WF3-2018-01054 CR-WF3-2018-01849 CR-WF3-2017-07486 CR-WF3-2018-01981

CR-WF3-2017-09887 CR-WF3-2018-01049 CR-WF3-2018-01978 CR-WF3-2018-01994

CR-WF3-2018-06078 CR-WF3-2018-05252

Procedures

Number

Title

Revision

EN-LI-108 Att. 9.1

CFR 21 Discovery Determination & Reportability

Evaluation Sheet for CR-WF3-2018-1994

EN-DC-205

Maintenance Rule Monitoring

Drawings

Number

Title

Revision

B425 T7075B1

Control Loop Diagram CC-Dry Cooling tower B Fan

Cooling

B425 T7070BD

Control Loop Diagram CC-Dry Cooling tower B Outlet

Temp

B425 T5009A

Control Loop Diagram HVR-CCW Pump Heat Exchanger

A Room Temp

71153 - Event Followup

Miscellaneous

Documents

Number

Title

Date

W3F1-2017-0076

NRC Performance Indicator (PI) Data - 3rd Quarter 2017

ROP Data

October 6,

2017

W3F1-2018-0004

NRC Performance Indicator (PI) Data - 4th Quarter 2017

ROP Data

January 9,

2018

W3F1-2018-0024

NRC Performance Indicator (PI) Data - 1st Quarter 2018

ROP Data

April 12,

2018

W3F1-2018-0042

NRC Performance Indicator (PI) Data - 2nd Quarter 2018

ROP Data

July 13, 2018

The following items are requested for the

Occupational Radiation Safety Inspection

at Waterford-3

Dates of Inspection: 09/10/2018 to 09/14/2018

Integrated Report 2018003

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Monday, August 13, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.02 should be in a file/folder titled

2-A, applicable organization charts in file/folder 2-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspector will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via

e-mail at Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection:

April 24, 2017

A.

List of contacts and telephone numbers for ALARA program personnel. Please include

area code and prefix. If work cell numbers are appropriate, then please include them as

well.

B.

Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, LARs, and LERs, written since the date of last

inspection, focusing on ALARA

D.

Procedure index for ALARA Program procedures and other related disciplines.

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Planning

3. ALARA Reviews

4. ALARA Committee

5. Radiation Work Permit Preparation

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of last inspection, related to the ALARA

program, including exceeding RWP Dose Estimates.

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspector can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspector can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

List of work activities (RWPs) greater than 1 rem, since date of last inspection,

including the original dose estimates and actual doses accrued. (Excel format

preferred). Please provide all revisions/changes, as well as any related RWPs that

support the work activity.

Provide any post evaluations, lessons learned, and/or corrective action documents

generated as a result of this work activity. If available, provide any justifications/reasons

for actual dose exceedances of the initial dose estimate.

I.

List of active work activities (RWPs) that will be in use while we are onsite, including the

dose and dose rate settings, and if available, the planned dose.

J.

Site dose totals for the past 3 years (based on dose of record). Also provide the current

year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide

another document that separates the online and outage doses for the past 3 years.

K.

Most recent assessment of your isotopic mix, including the hard-to-detect radionuclides

and alpha hazards. Include a list of new and historical exposure issues (radiological

source term or high exposure areas/activities).

L.

If available, provide a copy of the ALARA outage report or evaluation for the two most

recently completed outages for each unit

M.

Please provide the methods/reports that are in your process to meet the requirements of

CFR 20.1101(c) for periodic review of your RP program.

N.

Current exposure trends (BRAC dose rates and/or source term information)

4.

Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection:

September 12, 2016

A.

List of contacts and telephone numbers for the Dose Assessment personnel. Please

include area code and prefix. If work cell numbers are appropriate, then please include

them as well.

B.

Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and

LERs written since date of last inspection, related to Occupational Dose Assessment

D.

Procedure indexes for Occupational Dose Assessment procedures and other related

disciplines.

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Electronic Dosimeters

5. Air Sample Analysis

6. Performance of High or Special Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program (Internal Dose Assessment)

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspector can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspector can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format) If codes are used,

please provide a legend for each column where a code is used.

H.

List of positive whole body counts (excluding K-40) since date of last inspection, include

date(s), reason(s), activity assessed, and doses calculated and assigned. Names and

personal information can be redacted, if desired

I.

Part 61 analyses or other analyses of plant isotopic mixture (alpha, beta, gamma, and

neutron) for appropriate instrumentation calibration sources and dosimetry selection and

hard-to-detect plant nuclide scaling factors for intakes/uptakes.

J.

The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results and which dosimeter(s) is (are) use at the site and for what purpose(s) (DLR,

neutron, environmental, etc.).

K.

Please provide the latest assessment of your radiological source term as it relates to the

internal/external exposure of workers.

L.

If available, please provide your latest source term reduction strategy.

M.

Have available for on-site review the LLDs or MDAs for each onsite WBC or other

internal dose assessment instrumentation.

N.

If available, please provide the latest neutron source term characterization.

Describe why the neutron dosimetry used is appropriate for these locations.

O.

A list of airborne radioactivity areas (and associate RWPs) where DAC-hr monitoring

was used with air sampling to track and assign dose (BZ lapel air samples, etc.).

P.

Please have available for on-site review, a list of workers that declared a pregnancy

since the last inspection. Declared Pregnant Worker monitoring of worker and fetus.

Please provide the most recent NRC Form 5 for these individuals. No more than three

are requested. Please redact any sensitive information.

Q.

A list of EDEX or multi-badge dosimetry uses since the last inspection, include the

associated RWP and dose accrued.

ML18304A163

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: NFO

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:DRP/D

RI:DRP/D

Tl:DRS/IPAT

BC:DRS/EB1

Bc:DRS/EB2

BC:DRS/PSB2

NAME

FRamirez

CSpeer

GMiller

TFarnholtz

GWerner

HGepford

SIGNATURE

FCR

CAS

GBM

TRF

GEW

hjg

DATE

10/16/2018

10/17/18

10/25/18

10/25/2018

10/24/2018

10/25/18

OFFICE

BC:DRS/OB

BC:DRP/D

NAME

VGaddy

NOKeefe

SIGNATURE

TJF for

NFO

DATE

10/25/2018

10/29/2018