NRC Security Inspection Report 05000382/2023402 (Full Report)
ML23207A231
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/07/2023
From: Ray Kellar
NRC/RGN-IV/DRSS/PSB
To: Ferrick J
Entergy Operations
Jewett C
References
IR 2023402
Download: ML23207A231 (7)


Text

August 07, 2023

SUBJECT:

WATERFORD 3 - SECURITY BASELINE INSPECTION REPORT 05000382/2023402

Dear John Ferrick:

On July 13, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford 3 and discussed the results of this inspection with Mr. David Oertling, General Manager Plant Operations (GMPO), and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2023402

Enterprise Identifier:

I-2023-402-0006

Licensee:

Entergy Operations, Inc.

Facility:

Waterford 3

Location:

Killona, LA

Inspection Dates:

July 10, 2023 to July 13, 2023

Inspectors:

C. Jewett, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Waterford 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 13, 2023, the inspector presented the security baseline inspection results to Mr.

David Oertling, GMPO, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-2021-03961,

CR-2021-03962,

CR-2021-03963,

CR-2021-04353,

CR-2022-004822,

CR-2022-05666,

CR-2023-00540,

CR-2023-00604,

CR-2023-00684

Corrective Action

Documents

Resulting from

Inspection

CR-2023-14282,

CR-2023-14283,

CR-2023-14284,

CR-2023-14287

Generic Fitness-for-Duty and Behavior Observation Lesson

Plan

004

Access Authorization Familiarization Guide for Site & BOP

Site Supervisors

005

FF-000

Entergys Nuclear Fitness for Duty Program Statement of

Policy

003

PQA 22-072

22 Quest Diagnostics Audit Report

09/22/2022

Miscellaneous

QA-1-2021-W3-1

21 Fitness for Duty/Access Authorization Audit

08/09/2021

EN-LI-102

Corrective Action Program

049

EN-NS-101-04

Processing Potentially Disqualifying Information (PDI)

007

EN-NS-101-05

Maintaining Unescorted Access Authorization/Unescorted

Access and Critical Group

Status

007

EN-NS-102

Fitness for Duty Program

27

EN-NS-102-01

Fitness for Duty Random and Follow-Up Testing Selection

and Notification

2

EN-NS-102-02

Fitness for Duty Specimen Collection and Shipment

004

EN-NS-102-03

Processing of Fitness for Duty Test Results

004

71130.08

Procedures

EN-NS-102-04

Blind Samples

2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EN-NS-232

General Employee Security Responsibilities

2

EN-OM-123

Fatigue Management Program

20

Self-Assessments QA-1-2022-W3-1

22 Fitness for Duty/Access Authorization Audit

08/15/2022