IR 05000382/2023005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005)
ML23230A165
Person / Time
Site: Waterford  Entergy icon.png
Issue date: 08/21/2023
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Sullivan J
Entergy Operations
Sanchez A
References
IR 2023005
Download: ML23230A165 (6)


Text

August 21, 2023

SUBJECT:

UPDATED INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 - (REPORT 05000382/2023005)

Dear Joseph Sullivan:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Waterford Steam Electric Station, Unit 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1574 with any questions you have regarding this letter.

Sincerely, Signed by Dixon, John on 08/21/23 John L. Dixon, Jr., Chief Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000382, 07200075 License No. NPF-38 Enclosure:

Inspection Plan Distribution:

cc w/ encl: Distribution via LISTSERV

ML23230A165 SUNSI Review Non-Sensitive Publicly Available ASanchez Sensitive Non-Publicly Available OFFICE SPE:DORS/D BC:DORS/D NAME ASanchez/AAS JDixon DATE 08/18/23 08/21/23

Site Inspection Activity Plan Waterford 07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count EP Exercise Inspection Continuation - WAT 4 3 7/2/2023 9/30/2023 IP 71114.01 000716 Exercise Evaluation Security FFD .08 1 3 7/10/2023 7/13/2023 IP 71130.08 000740 Fitness For Duty Program RP 5,8 2 3 7/24/2023 7/28/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation 3 7/24/2023 7/28/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Cyber Security Inspection - WAT 4 3 7/24/2023 7/28/2023 IP 71130.10 000741 Cybersecurity W3 2023 INITIAL EXAM 5 3 7/23/2023 7/29/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3 8/20/2023 8/26/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection - WAT 1 3 10/16/2023 10/27/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,4,PI - 2 3 10/23/2023 10/27/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3 10/23/2023 10/27/2023 IP 71124.04 000728 Occupational Dose Assessment 3 10/23/2023 10/27/2023 IP 71151 000746 Performance Indicator Verification Comprehensive Engineering Team Inspection - Waterford 7 3 11/27/2023 12/1/2023 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 3 12/11/2023 12/15/2023 IP 71111.21M 000713 Comprehensive Engineering Team Inspection MC&A 1 3 2/12/2024 2/16/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

Security Equipment (.04), Security Access Control (.02), Security Plan Changes (.09), PIV (71151) 2 3 4/8/2024 4/12/2024 IP 71130.02 000734 Access Control 3 4/8/2024 4/12/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3 4/8/2024 4/12/2024 IP 71130.09 001656 Security Plan Changes 3 4/8/2024 4/12/2024 IP 71151 001338 Performance Indicator Verification RP 1,4 PI 2 3 5/6/2024 5/10/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3 5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment 3 5/6/2024 5/10/2024 IP 71151 000746 Performance Indicator Verification Prepared on 8/18/2023 8:18:55 AM 1 of 3

Site Inspection Activity Plan Fire Protection Inspection - WF3 3 3 7/8/2024 7/12/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

3 7/22/2024 7/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Security Training (.07) 1 3 8/26/2024 8/30/2024 IP 71130.07 000739 Security Training License Renewal 71003 - WAT (Phase 2) 4 3 9/9/2024 9/13/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal 3 9/23/2024 9/27/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal WAT 2024 PI&R Inspection 4 3 10/7/2024 10/11/2024 IP 71152B 000747 Problem Identification and Resolution 3 10/21/2024 10/25/2024 IP 71152B 000747 Problem Identification and Resolution EP Program & PI Inspection (2024) - W3 1 3 10/28/2024 11/1/2024 IP 71114.02 000717 Alert and Notification System Testing 3 10/28/2024 11/1/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3 10/28/2024 11/1/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 10/28/2024 11/1/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness 3 10/28/2024 11/1/2024 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - WAT 5 3 11/18/2024 11/22/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3 12/9/2024 12/13/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151) 1 3 2/3/2025 2/7/2025 IP 71130.02 000734 Access Control 3 2/3/2025 2/7/2025 IP 71130.09 001656 Security Plan Changes 3 2/3/2025 2/7/2025 IP 71151 001338 Performance Indicator Verification W3 2025 INITIAL EXAM 6 3 1/5/2025 1/11/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3 2/9/2025 2/22/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection - W3 1 3 4/7/2025 4/18/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI - WF3 2 3 4/7/2025 4/11/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3 4/7/2025 4/11/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3 4/7/2025 4/11/2025 IP 71151 000746 Performance Indicator Verification RP 5,6,7,8 - WF3 4 3 6/9/2025 6/13/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3 6/9/2025 6/13/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Prepared on 8/18/2023 8:18:55 AM 2 of 3

Site Inspection Activity Plan 3 6/9/2025 6/13/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program 3 6/9/2025 6/13/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Prepared on 8/18/2023 8:18:55 AM 3 of 3