| Quarter | Site | Title |
---|
05000416/FIN-2018002-05 | 2018Q2 | Grand Gulf | Failure to Follow Procedure Requirements Resulting in Unplanned Dose |
05000458/FIN-2018001-01 | 2018Q1 | River Bend | Failure to Implement Procedure for Storage of Material in the Pools |
05000263/FIN-2017004-01 | 2017Q4 | Monticello | Failure to Maintain Radiation Exposure ALARA |
05000416/FIN-2016004-02 | 2016Q4 | Grand Gulf | Failure to Use Procedures and Engineering Controls to Maintain Occupational Doses ALARA |
05000247/FIN-2016003-05 | 2016Q3 | Indian Point | Failure to Maintain Radiation Exposure ALARA During Unit 2 Reactor Cavity Liner Repairs |
05000397/FIN-2015002-03 | 2015Q2 | Columbia | Failure to Maintain Doses ALARA for the Alternate Fuel Pool Cooling Modification Job |
05000341/FIN-2014005-04 | 2014Q4 | Fermi | Failure to Maintain Radiation Exposure ALARA During RF-16 |
05000336/FIN-2014005-04 | 2014Q4 | Millstone | Failure to Maintain Radiation Exposure ALARA During Refueling Outage 2R22 Activities |
05000382/FIN-2014005-05 | 2014Q4 | Waterford | Failure to Adequately Plan and Control Work Activities Related to Alloy 600 Pipe Weld Inspections to Ensure Doses were ALARA |
05000247/FIN-2014004-01 | 2014Q3 | Indian Point | Failure to Maintain Radiation Exposure ALARA During Refueling Activities |