Security Baseline Inspection Report 05000382/2021402
ML21328A061
Person / Time
Site: Waterford 
Issue date: 12/03/2021
From: Ray Kellar
Division of Reactor Safety IV
To: Ferrick J
Entergy Operations
References
IR 2021402
Download: ML21328A061 (8)


Text

December 3, 2021

SUBJECT:

WATERFORD 3 STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000382/2021402

Dear Mr. Ferrick:

On November 4, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford 3 Steam Electric Plant. On November 4, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000382 License No. NPF-38 Enclosure:

Inspection Report 05000382/2021402 Signed by Kellar, Ray on 12/03/21

ML21328A061 X SUNSI Review By: RLK ADAMS:

X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:DRPD C:PSB1 NAME AMeyen DHostetter RKellar AAgrawal RKellar SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE 11/29/2021 11/29/2021 12/3/2021 12/3/2021 12/3/2021

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2021402

Enterprise Identifier:

I-2021-402-0012

Licensee:

Entergy Operations, Inc.

Facility:

Waterford 3 Steam Electric Plant

Location:

Kilona, LA

Inspection Dates:

November 01, 2021 to November 04, 2021

Inspectors:

D. Hostetter, Physical Security Inspector

A. Meyen, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Waterford 3 Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

evaluated: Access Authorization

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specially, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2) since the last performance of this IP, and the Physical Security Plan, revision 17 remains current.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) For Single Unit Sites:

October 1, 2020 through October 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 4, 2021, the inspectors presented the security baseline inspection results to John Ferrick and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2017-00417

2017-03771

2018-00618

2018-01305

2019-01853

2019-02297

2019-02579

20-01080

20-01519

20-07291

20-07379

21-00021

21-00039

21-03974

Multiple

Corrective Action

Documents

Resulting from

Inspection

21-06125

11/03/2021

Miscellaneous

FRR-GET-

Security

Entergy Nuclear Security Briefing General Employee Security

Responsibilities

Revision 3

EN-NS-101

Unescorted Access Authorization Program

Revision 31

EN-NS-101-01

Access Authorization/Fitness-for-Duty Facility Controls

Revision 3

EN-NS-101-02

Access Authorization/Fitness-for-Duty Training &

Qualification Program

Revision 7

EN-NS-101-03

Unescorted Access Authorization/Unescorted Access & SGI

Access

Revision 10

EN-NS-101-04

Processing Potential Disqualifying Information

Revision 5

EN-NS-101-05

Maintaining Unescorted Access Authorization/Unescorted

Access & Critical Group Status

Revision 6

EN-NS-101-06

Terminating, Denial & Appeals of UAA/UA

Revision 8

EN-NS-232

General Employee Security Responsibilities

Revision 2

71130.01

Procedures

Physical Security

Waterford 3 Steam Electric Station, Physical Security,

Revision 16

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Plan

Safeguards Contingency and Training & Qualification Plan

PS-011-102

Personnel Access Control

Revision 314

QA-Audit Report

QA-1-2019-W3-1

2019

QA-Audit Report

QA-1-2020-W3-1

20

QA-Audit Report

QA-1-2021-W3-1

21

Self-Assessments

QA-Audit Report

QA-1-2018-W3-1

2018

Corrective Action

Documents

20-03774

20-05068

20-05563

20-05593

20-05841

21-05549

Multiple

Miscellaneous

PIV

Security Performance Indicators

10/01/2020 -

10/31/2021

EN-NS-224

SOCA Access Control

EN-NS-228

Searh_Sealing Materials

EN-NS-231

Protected Area Search

EN-NS-232

General Employee Security Responsibilities

EN-NS-236

Warehouse Material Search

EN-NS-237

Key and Lock

PS-011-102

Personnel Access Control

314

PS-011-103

PA and VA Vehicle Access Control

309

Procedures

PS-011-110

SOCA Vehicle and Personnel Access Controls

71130.02

Self-Assessments QA-16-2020-W3-

Security-Cyber Security Audit Report

11/23/2020