August 21, 2024

SUBJECT:

UPDATED INSPECTION PLAN AND ASSESSMENT FOLLOW-UP LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2024005)

Dear Joseph Sullivan:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Waterford Steam Electric Station, Unit 3. The U.S. Nuclear Regulatory Commission (NRC)

provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC determined that performance at Waterford Steam Electric Station, Unit 3, during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the Performance Indicator (PI) for Unplanned Scrams per 7000 Critical Hours having crossed the Green-to-White threshold in the Initiating Events cornerstone in the second quarter of 2024. All other PIs and inspection findings are within the expected range (i.e., Green).

Therefore, in addition to the ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs. Through this inspection, the NRC will review the root and contributing causes, ensure the extent of condition and extent of causes are identified, ensure that completed corrective actions address and preclude repetition, and finally that pending corrective actions plans direct prompt and effective actions. Upon notification of your readiness for the supplemental inspection to review the action taken to address the performance issues, the NRC will contact you to schedule the supplemental inspection. This plan also includes one non-routine inspection in calendar year 2024 which is, Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal currently scheduled September 9-27, 2024. The regional administrator has approved the implementation of this inspection procedure.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact John Dixon at 817-200-1574 with any questions you have regarding this letter.

Sincerely, Geoffrey Miller, Director Division of Operating Reactor Safety Docket No. 05000382 and 07200075 License No. NPF-38 Enclosure:

Inspection Plan cc w/encl: Distribution via LISTSERV Signed by Miller, Geoffrey on 08/21/24

ML24232A254 X SUNSI Review By: ASanchez ADAMS:

X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE RIV/DORS/SPE RIV/DORS/BC RIV/DORS/D NAME ASanchez JDixon GMiller SIGNATURE

/RA/

/RA/

/RA/

DATE 08/21/2024 8/21/2024 08/21/2024

Site Inspection Activity Plan Enclosure Prepared on 8/16/2024 12:21:02 PM 1 of 2 Waterford 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count Fire Protection Inspection - WF3

3 7/8/2024 7/12/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

7/22/2024 7/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Security Equipment (.04), Security Access Control (.02), Security Plan Changes (.09), PIV (71151)

3 8/26/2024 8/30/2024 IP 71130.02 000734 Access Control

8/26/2024 8/30/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

8/26/2024 8/30/2024 IP 71130.09 001656 Security Plan Changes

8/26/2024 8/30/2024 IP 71151 001338 Performance Indicator Verification Security Training (.07)

3 8/26/2024 8/30/2024 IP 71130.07 000739 Security Training License Renewal 71003 - WAT (Phase 2)

3 9/9/2024 9/13/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal

9/23/2024 9/27/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal WAT 2024 PI&R Inspection

3 10/7/2024 10/11/2024 IP 71152B 000747 Problem Identification and Resolution

10/21/2024 10/25/2024 IP 71152B 000747 Problem Identification and Resolution EP Program & PI Inspection (2024) - W3

3 10/28/2024 11/1/2024 IP 71114.02 000717 Alert and Notification System Testing

10/28/2024 11/1/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

10/28/2024 11/1/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

10/28/2024 11/1/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness

10/28/2024 11/1/2024 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - WAT

3 11/4/2024 11/8/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

12/9/2024 12/13/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)

3 2/3/2025 2/7/2025 IP 71130.02 000734 Access Control

2/3/2025 2/7/2025 IP 71130.09 001656 Security Plan Changes

2/3/2025 2/7/2025 IP 71151 001338 Performance Indicator Verification W3 2025 INITIAL EXAM

3 1/5/2025 1/11/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

2/9/2025 2/22/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP 1,3,PI - WF3

Prepared on 8/16/2024 12:21:02 PM 2 of 2

4/7/2025 4/11/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

4/7/2025 4/11/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

4/7/2025 4/11/2025 IP 71151 000746 Performance Indicator Verification Inservice Inspection - W3

3 4/28/2025 5/9/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 5,6,7,8 - WF3

3 5/19/2025 5/23/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

5/19/2025 5/23/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

5/19/2025 5/23/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program

5/19/2025 5/23/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation W3 2025 BRQ

3 7/13/2025 7/19/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Cyber Security Inspection-W3

Security Protective Strategy (71130.05) and Target Sets (71130.14)

3 8/4/2025 8/8/2025 IP 71130.05 000737 Protective Strategy Evaluation

8/4/2025 8/8/2025 IP 71130.14 000743 Review of Power Reactor Target Sets Commercial Grade Dedication Inspection - Waterford

3 9/8/2025 9/12/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

9/22/2025 9/26/2025 IP 71111.21N.03 001808 Commercial Grade Dedication EP 2025 Biennial Exercise & PI Inspection - WF3

3 11/17/2025 11/21/2025 IP 71114.01 000716 Exercise Evaluation

11/17/2025 11/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

11/17/2025 11/21/2025 IP 71151 001397 Performance Indicator Verification Waterford 2026 PI&R

3 2/9/2026 2/27/2026 IP 71152B 000747 Problem Identification and Resolution Age-Related Degradation Inspection - Waterford

3 5/4/2026 5/8/2026 IP 71111.21N.04 001832 Age-Related Degradation

5/18/2026 5/22/2026 IP 71111.21N.04 001832 Age-Related Degradation License Renewal-WF3 71003 (Phase 3)

3 6/8/2026 6/12/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal

7/13/2025 7/19/2025 IP 71130.10 000741 Cybersecurity