ML24075A171

From kanterella
Jump to navigation Jump to search
Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
ML24075A171
Person / Time
Site: Grand Gulf, Arkansas Nuclear, River Bend, Waterford  Entergy icon.png
Issue date: 03/15/2024
From: Couture P
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
CNRO2024-00007
Download: ML24075A171 (1)


Text

Phil Couture Senior Manager Fleet Regulatory Assurance - Licensing 601-368-5102

Entergy Operations, Inc. 1340 Echelon Parkway, Jackson, MS 39213 CNRO2024-00007 10 CFR 50.54(w)(3)

March 15, 2024 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Nuclear Onsite Property Damage Insurance [10 CFR 50.54(w)(3)]

Arkansas Nuclear One, Units 1 and 2 NRC Docket Nos. 50-313 and 50-368 Renewed Facility Operating License Nos. DPR-51 and NPF-6 Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47 Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38 In accordance with 10 CFR 50.54(w)(3), the attached summary documents the property damage insurance coverage for the nuclear sites of Entergy Operations, Inc (Entergy). The insurance certificates that correspond to the policy numbers identified in the enclosure are available in Entergy's Risk Management files following their effective date, April 1, 2024.

This submittal contains no new regulatory commitments. Should you have any questions or require additional information, please contact me at 601-368-5102.

Respectfully, Phil Couture PC/dlw Philip Couture Digitally signed by Philip Couture Date: 2024.03.15 09:56:28 -05'00'

CNRO2024-00007 Page 2 of 2

Enclosure:

Summary of Property Damage Insurance Coverage cc:

NRC Region IV-Regional Administrator NRC Senior Resident Inspector-Arkansas Nuclear One, Units 1 and 2 NRC Senior Resident Inspector-Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector-River Bend Station, Unit 1 NRC Senior Resident Inspector-Waterford Steam Electric Station, Unit 3 NRC Project Manager-Entergy Fleet

Enclosure CNRO2024-00007 Summary of Property Damage Insurance Coverage

CNRO2024-00007 Enclosure Page 1 of 4

SUMMARY

OF PROPERTY DAMAGE INSURANCE COVERAGE Arkansas Nuclear One (ANO)

Entergy Operations, Inc.

Nuclear Property Insurance Entergy Arkansas, LLC Effective April 1, 2024 The amount of Primary Property Insurance totals $1.06 Billion.

Primary:

Policy Period: April 1, 2024 to April 1, 2025 Insurer: Nuclear Electric Insurance Limited Policy Number: P24-045 Policy Limit: $1.06 Billion

CNRO2024-00007 Enclosure Page 2 of 4

SUMMARY

OF PROPERTY DAMAGE INSURANCE COVERAGE Grand Gulf Nuclear Station (GGN)

Entergy Operations, Inc.

Nuclear Property Insurance System Energy Resources, Inc.

Effective April 1, 2024 Cooperative Entergy The amount of Primary Property Insurance totals $1.06 Billion.

Primary:

Policy Period: April 1, 2024 to April 1, 2025 Insurer: Nuclear Electric Insurance Limited Policy Number: P24-026 Policy Limit: $1.06 Billion

CNRO2024-00007 Enclosure Page 3 of 4

SUMMARY

OF PROPERTY DAMAGE INSURANCE COVERAGE River Bend Nuclear Station (RBS)

Entergy Operations, Inc.

Nuclear Property Insurance Entergy Louisiana, LLC Effective April 1, 2024 The amount of Primary Property Insurance totals $1.06 Billion.

Primary:

Policy Period: April 1, 2024 to April 1, 2025 Insurer: Nuclear Electric Insurance Limited Policy Number: P24-066 Policy Limit: $1.06 Billion

CNRO2024-00007 Enclosure Page 4 of 4

SUMMARY

OF PROPERTY DAMAGE INSURANCE COVERAGE Waterford 3 Nuclear Station (WF3)

Entergy Operations, Inc.

Nuclear Property Insurance Entergy Louisiana, LLC Effective April 1, 2024 The amount of Primary Property Insurance totals $1.06 Billion.

Primary:

Policy Period: April 1, 2024 to April 1, 2025 Insurer: Nuclear Electric Insurance Limited Policy Number: P24-036 Policy Limit: $1.06 Billion