| Quarter | Site | Title |
---|
05000530/FIN-2016001-01 | 2016Q1 | Palo Verde | Failure to use adequate engineering and radiological controls resulting in two unplanned intakes |
05000461/FIN-2015002-03 | 2015Q2 | Clinton | Contract Workers not Monitored for Occupational Radiation Exposure |
05000331/FIN-2015001-02 | 2015Q1 | Duane Arnold | Failure to Report Required Monitoring Results to the NRC |
05000266/FIN-2015001-02 | 2015Q1 | Point Beach | Failure to Quantify Radionuclides in the Body for Internal Dose Assessments |
05000255/FIN-2014010-01 | 2014Q4 | Palisades | Failure to Monitor The Highest Exposed Part Of The Compartment When Using EDEX |
05000266/FIN-2013002-04 | 2013Q1 | Point Beach | Failure to Survey for Neutron Dose from Source Storage |
05000255/FIN-2013002-04 | 2013Q1 | Palisades | Failure to Perform DAC-Hour Tracking |
05000369/FIN-2012005-02 | 2012Q4 | McGuire | Evaluation of the Occupational Radiation Dose Assigned to a Worker from a Piece of Contaminated Wire |
05000266/FIN-2012005-05 | 2012Q4 | Point Beach | Unmonitored Neutron Exposure Evaluation |
05000305/FIN-2012004-04 | 2012Q3 | Kewaunee | Effective Dose Equivalent Determination |