ML23325A144
From kanterella
Jump to navigation
Jump to search
ML23325A144 | |
Person / Time | |
---|---|
Site: | Waterford ![]() |
Issue date: | 11/21/2023 |
From: | Pyle S Entergy Operations |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
CNRO2023-00028 | |
Download: ML23325A144 (11) | |
Similar Documents at Waterford | |
---|---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024
[Table view]Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31 Category:Report MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023
[Table view]Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 W3F1-2018-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20172018-06-0707 June 2018 Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2017 ML17163A1852017-06-30030 June 2017 Biological Evaluation of Impacts to Federally Listed Species for Waterford License Renewal W3F1-2017-0042, Focused Evaluation of External Flooding2017-05-17017 May 2017 Focused Evaluation of External Flooding ML17023A2822017-02-27027 February 2017 Flood Hazard Mitigating Strategies Assessment ML16308A4472016-10-19019 October 2016 Final ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007) ML15268A0202015-09-23023 September 2015 Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary) W3F1-2015-0042, Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End2015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End ML15204A3242015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146 ML15204A3232015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 1 Through 3-61 ML14129A3502014-04-29029 April 2014 Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2014 ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 W3F1-2013-0054, CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B2013-09-0909 September 2013 CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B W3F1-2013-0027, Closure Option for Generic Safety Issue - 1912013-05-16016 May 2013 Closure Option for Generic Safety Issue - 191 ML13120A4642013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment C, Rev. 0, Safety Injection Sump Outlet Header B Isolation, Enclosure to W3F1-2013-0024, Pages 312 - 591 of 1014 W3F1-2013-0024, Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 10142013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 1014 ML13120A4622013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment G, Rev. 0, Peer Review Checklist for SWEL, Enclosure to W3F1-2013-0024, Pages 820 - 1014 of 1014 ML13120A4612013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Revision 1, Wateford, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Enclosure to W3F1-2013-0024, Pages 1 - 311 of 1014 CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments W3F1-2012-0100, WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 22012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 2 ML12333A2772012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 ML12333A2752012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 5 ML12333A2742012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 4 2023-12-19 Category:Miscellaneous MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023
[Table view]Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 W3F1-2018-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20172018-06-0707 June 2018 Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2017 W3F1-2017-0042, Focused Evaluation of External Flooding2017-05-17017 May 2017 Focused Evaluation of External Flooding ML17023A2822017-02-27027 February 2017 Flood Hazard Mitigating Strategies Assessment ML16308A4472016-10-19019 October 2016 Final ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007) W3F1-2015-0042, Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End2015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End ML15204A3242015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146 ML15204A3232015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 1 Through 3-61 ML14129A3502014-04-29029 April 2014 Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2014 W3F1-2013-0054, CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B2013-09-0909 September 2013 CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B W3F1-2013-0027, Closure Option for Generic Safety Issue - 1912013-05-16016 May 2013 Closure Option for Generic Safety Issue - 191 W3F1-2012-0079, Special Report SR-12-002-00, Containment High Range Radiation Monitor ARMIRE5400 a Inoperable for Greater than 7 Days2012-09-20020 September 2012 Special Report SR-12-002-00, Containment High Range Radiation Monitor ARMIRE5400 a Inoperable for Greater than 7 Days ML12157A4262012-05-23023 May 2012 Attachment 38 to GNRO-2012/00039 - Ensr. 2007, Impingement Mortality and Entrainment Characterization Study (Imecs), Entergy -Waterford 3. December 2007 W3F1-2012-0034, Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 20122012-04-30030 April 2012 Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2012 W3F1-2011-0074, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2011-11-17017 November 2011 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) ML1017302002010-06-17017 June 2010 Chemical Effects Summary Related to RAI Response to GL-2004-02 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants W3F1-2010-0003, License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line2010-02-22022 February 2010 License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line W3F1-2009-0033, Blind Sample Investigation Report2009-07-15015 July 2009 Blind Sample Investigation Report W3F1-2008-0049, Day Report for Reactor Pressure Vessel Head and Pressurizer Inspection/Repair for the Spring 2008 Refueling Outage2008-07-24024 July 2008 Day Report for Reactor Pressure Vessel Head and Pressurizer Inspection/Repair for the Spring 2008 Refueling Outage W3F1-2007-0030, Day Steam Generator Tube Inspection Report for the 14th Refueling Outage2007-06-21021 June 2007 Day Steam Generator Tube Inspection Report for the 14th Refueling Outage ML0705902052007-02-21021 February 2007 Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds W3F1-2006-0059, Core Operating Limits Report - Cycle 14 Revision 0 Change 12006-11-0707 November 2006 Core Operating Limits Report - Cycle 14 Revision 0 Change 1 CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee W3F1-2006-0012, Report of Facility Changes, Tests and Experiments and Commitment Changes2006-05-0101 May 2006 Report of Facility Changes, Tests and Experiments and Commitment Changes CNRO-2006-00023, Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests2006-04-24024 April 2006 Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests W3F1-2006-0008, Supplement to Amendment Request NPF-38-260 Tubesheet Inspection Depth for Steam Generator Tube Inspections for Waterford, Unit 32006-03-22022 March 2006 Supplement to Amendment Request NPF-38-260 Tubesheet Inspection Depth for Steam Generator Tube Inspections for Waterford, Unit 3 W3F1-2005-0067, Supplemental Startup and Power Report for Cycle 14 Waterford, Unit 32005-12-0808 December 2005 Supplemental Startup and Power Report for Cycle 14 Waterford, Unit 3 ML0612801172005-12-0101 December 2005 ER-W3-2000-0334-000, Heating Ventilation and Air Conditioning Equipment Room and Component Cooling Heat Exchanger Room Calculations Correction ML0612801142005-10-19019 October 2005 ER-W3-2005-0334-001, Temporary Alteration for Reactor Vessel Gasket Leak-off Pressure High Annunciator ML0612801122005-09-14014 September 2005 ER-W3-2005-0378-000, Outside Containment Leak Reduction Program Test Medium Change ML0612801132005-09-14014 September 2005 ER-W3-2005-0396-000, Confirmatory Criticality Calculation Correction for Spent Fuel Racks ML0520901582005-08-0202 August 2005 2004 External Stakeholder Response; 2004 Reactor Oversight Process External Survey - Attachment ML0612801082005-06-0606 June 2005 ER-W3-2004-0276-002, Steam Generator Tube Rupture Impacts Due to Alternate Source Term Methodology with Revised Assumptions ML0612801112005-06-0606 June 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeve and Instrument Nozzle Repair 2023-12-19 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23325A144&oldid=3649046"