MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program Project stage: Approval 2024-08-07
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information IR 05000382/20230042024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection 2024-08-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML19035A5202019-02-0606 February 2019 Correction to Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18275A2152018-12-27027 December 2018 Issuance of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 CAC Nos. MF7492 and MF7493) ML18275A1332018-12-27027 December 2018 Current Renewed Facility Operating License NPF-38 ML18275A2032018-12-27027 December 2018 Current Renewed Facility Operating License NPF-38 Attachment 2 and Tech Specs ML18207A2702018-08-20020 August 2018 Notice of Availability of the Draft Supplement Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3, for Public Comment ML18180A2962018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3, for Public Comment ML18180A1132018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3 for Public Comment ML18180A1122018-08-20020 August 2018 Notice of Availability of the Draft Supplemental Environmental Impact Statement for License Renewal of Waterford Steam Electric Station, Unit 3 for Public Comment ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML15005A1262015-02-23023 February 2015 Issuance of Amendment Multiple Administrative Issues with the Technical Specification ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12244A0592012-12-20020 December 2012 Issuance of Amendment No. 239, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan Implementation Schedule ML12278A3312012-12-20020 December 2012 Issuance of Amendment No. 238, Relocate Technical Specification (TS) 3.4.6, TS 3.7.5, TS 3.7.9, and TS 3.9.5 to the Technical Requirements Manual ML12250A4352012-10-31031 October 2012 Issuance of Amendment No. 237, Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train ML12152A3412012-07-31031 July 2012 Issuance of Amendment No. 236, Revise Technical Specifications Related to Steam Generator Tube Integrity to Support Replacement of Steam Generators ML1209401712012-04-25025 April 2012 Issuance of Amendment No. 235, Revise Technical Specification Applicability and Action Language for Revised Fuel Handling Accident Analysis ML1118000212011-07-20020 July 2011 Issuance of Amendment No. 234, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1106302592011-03-23023 March 2011 Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves ML1104101192011-02-28028 February 2011 Issuance of Amendment No. 232, Approval of Change to Final Safety Analysis Report for Leak-Before-Break of the Pressurizer Surge Line ML1101400262011-02-23023 February 2011 Issuance of Amendment No. 231, Modify Technical Specification 3/4.9.4, Containment Building Penetrations, to Allow Alternative Means of Penetration Closure During Refueling Operations ML1036305222011-01-31031 January 2011 Issuance of Amendment No. 230, Revise TS 3.7.1.2, Emergency Feedwater System, Limiting Condition for Operation to Clarify Acceptability of Transitioning from Mode 4 to Mode 3 2024-08-07
[Table view] Category:Safety Evaluation
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22061A2172022-03-15015 March 2022 Revision of the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21166A1832021-09-15015 September 2021 Issuance of Amendment No. 261 Regarding Removal and Relocation of Boration System Technical Specifications ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20022A2582020-01-28028 January 2020 Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control ML20002A0202020-01-13013 January 2020 Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19282D8922019-10-15015 October 2019 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19247B1972019-09-0909 September 2019 Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination ML19232A0252019-08-27027 August 2019 Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19157A3162019-06-12012 June 2019 Authorization of Proposed Alternative to ASME Code Case N-770-2 ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML18282A0302018-10-18018 October 2018 Proposed Alternative to ASME Code, Section XI, Regarding Charging Pipe Visual Inspection ML18180A2982018-07-23023 July 2018 Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17341A1202017-12-11011 December 2017 Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049) ML17328A8822017-11-29029 November 2017 Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML17069A1872017-03-22022 March 2017 Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024 ML17045A1482017-03-0303 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16235A2282016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16182A2702016-07-0606 July 2016 Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing Program ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15267A7972015-10-0606 October 2015 Safety Evaluation Regarding the Aging Management Program for Reactor Vessel Internals 2024-08-07
[Table view] Category:Technical Specifications
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21148A0522021-06-0808 June 2021 Correction to License Amendment 214 Request to Support Next Generation Fuel; Review and Approval of Revised ECCS Performance Analysis; and Review and Approval of Supplement to the ECCS Performance Analysis ML21116A1432021-04-26026 April 2021 (Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML20148M1062020-06-22022 June 2020 Corrections to Technical Specifications Issued in Amendments Nos. 102 and 225 and with the Renewed License ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule W3F1-2016-0010, Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-03-0303 March 2016 Responses to Request for Additional Information Regarding the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times ML15244B3862015-09-0303 September 2015 Correction to Issuance of Amendment Extension of the Integrated Leak Rate Testing to 15 Years ML15139A4832015-08-31031 August 2015 Issuance of Amendment No. 245 Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power ML15217A1432015-08-24024 August 2015 Issuance of Amendment No. 244 Extension of the Integrated Leak Rate Testing to 15 Years ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-08-14014 August 2015 Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 ML15174A2272015-07-29029 July 2015 Issuance of Amendment of Technical Specifications s 3.9.6 and 3.9.7 to the Technical Requirements Manual ML14321A7132014-12-10010 December 2014 Issuance of Amendment No. 241, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications W3F1-2012-0084, Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink2012-10-0808 October 2012 Technical Specification Change for Dry Cooling Tower Fans Out of Service for Ultimate Heat Sink W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train2012-05-22022 May 2012 Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML1125103192011-09-20020 September 2011 Correction of an Error in Amendment No. 226, Administrative Changes to Technical Specifications 6.9.1.11 and 6.9.1.11.1 Relating to Core Operating Limits Report ML1109501232011-04-0404 April 2011 Attachment 2 to W3F1-2011-0021, Proposed Operating License Change (Mark-up) and Attachment 3, Revised Operating License Page ML1021001582010-09-13013 September 2010 Issuance of Amendment No. 228, Modify Technical Specification Tables 2.2-1 and 3.3-1 to Clarify Notes and Actions ML1021504662010-09-13013 September 2010 Issuance of Amendment No. 227, Modify Technical Specification 3/4.9.7, Crane Travel - Fuel Handling Building to Permit Certain Operations Needed for Dry Cask Storage of Spent Nuclear Fuel W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0047, License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System.2010-07-20020 July 2010 License Amendment Request for Proposed Change to Technical Specification 3.7.1.2, Emergency Feedwater System. 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References ML1011100352010-04-22022 April 2010 Correction to Technical Specification Page 3/4 3-10 Issued with Amendment No. 225 Technical Specification Change to Relocate Steam Generator Level - High Trip Function ML1005504632010-02-22022 February 2010 Request for Amendment to Technical Specification Table 3.4-1 Isolation Valve Addition W3F1-2010-0011, License Amendment Request, Technical Specification Change Regarding Steam Generator Program2010-02-22022 February 2010 License Amendment Request, Technical Specification Change Regarding Steam Generator Program W3F1-2009-0045, License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-12009-10-22022 October 2009 License Amendment Request to Modify Technical Specification Information for Table 2.2-1 and Table 3.3-1 W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-06-0303 June 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 ML0819904722008-07-30030 July 2008 License and Technical Specification Pages, Issuance of Amendment No. 216, Modify Diesel Generator Fuel Oil Testing Surveillance Requirements ML0812700362008-05-0909 May 2008 Tech Spec Page for Correction to Amendment 214 Request to Support Next Generation Fuel; Review & Approval of Revised ECCS Performance Analysis; & Review & Approval of Supplement to ECCS Performance Analysis ML0803800062008-04-16016 April 2008 License Page 4 and Technical Specification Page 5-5, Issuance of Amendment No. 215 Use of Optimized ZIRLO-TM Fuel Rod Cladding ML0808800152008-04-15015 April 2008 Tech Spec Pages for Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis ML0804401272008-02-12012 February 2008 2/12/2008 E-mail from Licensee Enclosing Markup of Technical Specification Page 5-5, Supplement to 4/24/2007 License Amendment Request Use of Optimized ZIRLO-TM Fuel Rod Cladding W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability2007-08-16016 August 2007 License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability ML0711603482007-04-24024 April 2007 License Amendment Request to Allow the Use of Optimized Zirlo Fuel Rod Cladding 2024-08-07
[Table view] |
Text
August 7, 2024
Site Vice President Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OF AMENDMENT NO. 271 RE: TECHNICA L SPECIFICATION CHANGE TO REVISE SURVEILLANCE REQUIREMENTS INCLUDED IN THE SURVEILLANCE FREQUENCY CONTROL PROGRAM (EPID L-2023-LLA-0104)
Dear Site Vice President:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 271 to Renewed Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3). This amendment consists of changes to the technical specifications (TSs) in response to your application dated July 26, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23207A049).
The amendment revises Surveillance Requirement (SR) 4.3.1.3, listed in Technical Specification (TS) 3.3.1, Reactor Protective Instrumentation, and SR 4.3.2.3, listed in TS 3.3.2, Engineered Safety Features Actuation System Instrumentation, to remove conflicting language that should have been removed as part of the Waterford 3 license amendment request (LAR) to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-425 (Package ML15170A121 ), which relocated specific surveillance frequencies to the surveillance frequency control program (SFCP) (a licensee controlled program). Waterford 3 License Amendment No. 249 dated July 26, 2016 (ML16159A419), approved the proposed relocation of the surveillance frequencies and the associated administrative controls in accordance with the new SFCP. The proposed removal of the conflicting language from SR 4.3.1.3 and SR 4.3.2.3 will make the Waterford 3 SRs consistent with the previously approved corresponding Arkansas Nuclear One, Unit 2 SRs (ML19063B948).
A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Jason J. Drake, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-382
Enclosures:
- 1. Amendment No. 271 to NPF-38
- 2. Safety Evaluation
cc: Listserv ENTERGY OPERATIONS, INC.
DOC KET N O. 50-382
WATERFORD STEAM ELECTRIC STATION, UNIT 3
AMENDMENT TO RENEWED FACILITY OPERATING LICENSE
Amendment No. 271 Renewed License No. NPF-38
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (EOI), dated July 26, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I;
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Renewed Facility Operating License No. NPF-38 is hereby amended to read as follows:
- 2. Technical Specifications and Environmental Protection Plan
The Technical Specifications contained in Appendix A, as revised through Amendment No. 271, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Jennivine K. Rankin, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License No. NPF-38 and the Technical Specifications
Date of Issuance: August 7, 2024 AT T ACH ME NT T O L I C E NSE AM EN DME NT NO. 271
TO RENEWED FACILITY OPERATING LICENSE NO. NPF-38
WATERFORD STEAM ELECTRIC STATION, UNIT 3
DOC KET N O. 50-382
Replace the following pages of Renewed Facility Operating License No. NPF-38 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating License
REMOVE INSERT Technical Specifications
REMOVE INSERT 3/4 3-1 3/4 3-1 3/4 3-13 3/4 3-13
the NRC of any action by equity investors or successors in interest to Entergy Louisiana, LLC that may have an effect on the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
- 1. Maximum Power Level
EOI is authorized to operate the facility at reactor core power levels not in excess of 3716 megawatts thermal (100% power) in accordance with the conditions specified herein.
- 2. Technical Specifications and Environmental Protection Plan
The Technical Specifications contained in Appendix A, as revised through Amendment No. 271, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. Antitrust Conditions
(a) Entergy Louisiana, LLC shall comply with the antitrust license conditions in Appendix C to this renewed license.
(b) Entergy Louisiana, LLC is responsible and accountable for the actions of its agents to the extent said agent's actions contravene the antitrust license conditions in Appendix C to this renewed license.
AMENDMENT NO. 271 3/4.3 INSTRUMENTATION
3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION
LIMITING CONDITION FOR OPERATION
3.3.1 As a minimum, the reactor protective instrumentation channels and bypasses of Table 3.3-1 shall be OPERABLE.
APPLICABILITY: As shown in Table 3.3-1.
ACTION:
As shown in Table 3.3-1.
SURVEILLANCE REQUIREMENTS
4.3.1.1 Each reactor protective instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-1.
4.3.1.2 The logic for the bypasses shall be demonstrated OPERABLE prior to each reactor startup unless performed during the preceding 92 days. The total bypass function shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.1.3 The REACTOR TRIP SYSTEM RESPONSE TI ME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Neutron detectors, Core Protection Calculators, and CEACs are exempt from response time testing.
4.3.1.4 DELETED
4.3.1.5 DELETED
4.3.1.6 DELETED
4.3.1.7 Perform a test on the CPC DNBR/LPD trip output through the contact interface to the PPS in accordance with the Surveillance Frequency Control Program.
WATERFORD - UNIT 3 3/4 3-1 AMENDMENT NO. 94, 249, 260, 271 INSTRUMENTATION
3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION
LIMITING CONDITION FOR OPERATION
3.3.2 The Engineered Safety Features Actuation System (ESFAS) instrumentation channels and bypasses shown in Table 3.3-3 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-4.
APPLICABILITY: As shown in Table 3.3-3.
ACTION:
- a. With an ESFAS instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3-4, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-3 until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.
- b. With an ESFAS instrumentation channel inoperable, take the ACTION shown in Table 3.3-3.
SURVEILLANCE REQUIREMENTS
4.3.2.1 Each ESFAS instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-2.
4.3.2.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by bypass operation. The total bypass function shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.2.3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within the limit in accordance with the Surveillance Frequency Control Program.
WATERFORD - UNIT 3 3/4 3-13 AMENDMENT NO. 94, 249, 271 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
RELATED TO AMENDMENT NO. 271 TO
RENEWED FACILITY OPERATING LICENSE NO. NPF-38
ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3
DOC KET N O. 50-382
1.0 INTRODUCTION
By application dated July 26, 2023 (Agencywi de Documents Access and Management System (ADAMS) Accession No. ML23207A049), Entergy Operations Inc. (Entergy, the licensee) requested changes to the technical specifications (TSs) for the Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed change would revise Surveillance Requirement (SR) 4.3.1.3, listed in Technical Specification (TS) 3.3.1, Reactor Protective Instrumentation, and SR 4.3.2.3, listed in TS 3.3.2, Engineered Safety Features Actuation System Instrumentation, to remove conflicting language that should have been removed as part of the Waterford 3 license amendment request (LAR) dated June 17, 2015 (Package ML15170A121), to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-425, which relocated specific surveillance frequencies to the surveillance frequency control program (SFCP) (a licensee-controlled program). Waterford 3 License Amendment No. 249 dated July 26, 2016 (ML16159A419), approved the proposed relocation of the surveillance frequencies and the associated administrative controls in accordance with the new SFCP.
1.1 Proposed Changes to SR 4.3.1.3 and SR 4.3.2.3
The licensee proposed to modify SR 4.3.1.3 by removing the last sentence as indicated in the markup below:
The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be demonstrated to be within its limit in accordance with the Surveillance Frequency Control Program. Neutron detectors, Core Protection Calculators, and CEACs are exempt from response time testing. Each test shall include at least one channel per function such that all channels are tested as shown in the 'Total No. of Channels' column of Table 3.3-1.
Enclosure 2
The licensee proposed to modify SR 4.3.2.3 by removing the last sentence as indicated in the markup below:
The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESFAS function shall be demonstrated to be within the limit in accordance with the Surveillance Frequency Control Program. Each test shall include at least one channel per function such that all channels are tested as shown in the 'Total No.
of Channels' Column of Table 3.3-3.
2.0 REGULATORY EVALUATION
The regulation at Title 10 of the Code of Federal Regulations (10 CFR) 50.36(c)(3) requires that TSs include items in the category of SRs, which are requirements relating to test, calibration, or inspection needed to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Regulatory Guide (RG) 1.177, An Approach for Plant-Specific, Risk-Informed Decisionmaking:
Technical Specifications, Revision 1, May 2011 (ML100910008), provides a framework for evaluating the risk impact of proposed changes to surveillance frequencies, which requires identification of the risk contribution from impacted surveillances, determination of the risk impact from the change to the proposed surveillance frequency, and performance of sensitivity and uncertainty evaluations. The application of Nuclear Energy Institute (NEI) 04-10, Revision 1, Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, April 2007 (ML071360456) in accordance with the SFCP administrative controls in Waterford 3 TS section 6.5.18, Surveillance Frequency Control Program, satisfies the intent of RG 1.177.
3.0 TECHNICAL EVALUATION
The licensee proposed to modify SR 4.3.1.3, listed in TS 3.3.1 and SR 4.3.2.3, listed in TS 3.3.2, to remove site-specific out of context language that conflicts with the application of the SFCP controls on the reactor protective system (RPS) reactor trip system and engineered safety features actuation system (ESFAS) response time testing frequencies.
Waterford 3 SR 4.3.1.3 requires response time testing of the RPS reactor trip system instrumentation and SR 4.3.2.3 requires response time testing of the ESFAS instrumentation.
The test frequencies for these SRs are controlled in accordance with the SFCP.
The licensee stated that, the current SRs, which were approved in License Amendment No. 249 [ML16159A419], are causing confusion when attempting to evaluate risk measures related to the SRs and due to the SRs referring to both the SFCP and TS Tables as providing the controls on the surveillance frequencies for performing the required response time testing.
The licensees LAR to adopt TSTF-425 included the deletion of the text, at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function from the last sentence of SR 4.3.1.3 and the deletion of the text: at least once every N times 18 months where N is the total number of redundant channels in a specific ESFAS function from the last sentence of SR 4.3.2.3. The failure to remove the remaining text in the last sentences of SR 4.3.1.3 and SR 4.3.2.3 introduced out of context and conflicting language that make the controls on RPS reactor trip system and ESFAS instrumentation response time
testing confusing since the SRs now refer to both the SFCP and TS table 3.3-1 and table 3.3-3 as controlling the response time testing frequency.
The guidance in NEI 04-10, Revision 1, states, in part, that NEI 04-10 Revision 1 contains new information to address how Surveillances which are performed on a Staggered Test Basis are modeled in the risk assessment performed to support a change to the Frequency. This will allow licensees to add or remove the requirement to perform Surveillances on a Staggered Test Basis under the Surveillance Frequency Control Program.
The licensee stated that the SFCP will continue to be used to assess proposed changes to the SR 4.3.1.3 and SR 4.3.2.3 surveillance test intervals consistent with TSTF-425 and the intent of NEI 04-10.
The NRC staff reviewed the proposed changes to SRs 4.3.1.3 and 4.3.2.3 and found them acceptable because removing the conflicting language from the last sentences of SRs 4.3.1.3 and 4.3.2.3 is intended to eliminate the current uncertainty regarding application of the SFCP controls to the RPS reactor trip system and ESFAS instrumentation response time tests and will continue to meet the intent of the SFCP (consistent with TSTF-425 and the intent of NEI 04-10) and the requirements of 10 CFR 50.36(c).
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Louisiana State official was notified of the proposed issuance of the amendment on June 12, 2024. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, published in the Federal Register on December 26, 2023 (88 FR 88983), and there has been no public comment on such finding.
Accordingly, the amendment meets the eligibility cr iteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Tarico Sweat, NRR
Date: August 7, 2024
ML24164A251 *concurrence via email OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC*
NAME JDrake PBlechman SMehta DATE 6/12/2024 6/13/2024 6/7/2024 OFFICE OGC* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME MCarpentier JRankin JDrake DATE 6/27/2024 8/7/2024 8/7/2024