August 24, 2022

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000382/2022010

Dear Mr. Ferrick:

On July 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with Mr. Matt Lewis and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations problem identification and resolution program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for problem identification and resolution programs.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Overall, the team concluded that all work groups at the Waterford Steam Electric Station, Unit 3, maintained a healthy safety-conscious work environment. Having said this, the team found some work environment challenges in the security department. Through interviews with the staff members, the team identified that an environment exists where morale among officers is low due to continued staffing issues and high levels of overtime. This has led to fatigue and work/life balance issues. If left uncorrected, the team posited that continued degradation of staff morale due to fatigue, could negatively impact staff performance and potentially plant safety. No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ami N. Agrawal, Team Lead Inspection Program & Assessment Team Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2022010

Enterprise Identifier:

I-2022-010-0005

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, LA

Inspection Dates:

July 03, 2022, to July 28, 2022

Inspectors:

R. Azua, Senior Reactor Inspector

D. Childs, Resident Inspector

B. Correll, Reactor Inspector

N. Makris, Senior Emergency Response Coordinator

Approved By:

Ami N. Agrawal, Team Lead

Inspection Program & Assessment Team

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Waterford Steam Electric Station, Unit 3, in accordance with the Reactor Oversight Process.

The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 03.04)

(1) The inspectors performed a biennial assessment of the effectiveness of the licensees Problem Identification and Resolution program, use of operating experience, self-assessments and audits, and safety conscious work environment.

Problem Identification and Resolution Effectiveness: The inspectors assessed the effectiveness of the licensees Problem Identification and Resolution program in identifying, prioritizing, evaluating, and correcting problems. The inspectors also conducted a five-year review of the Auxiliary Component Cooling Water (ACCW)system.

Operating Experience: The inspectors assessed the effectiveness of the licensees processes for use of operating experience,

Self-Assessments and Audits: The inspectors assessed the effectiveness of the licensees identification and correction of problems identified through audits and self-assessments.

Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.

INSPECTION RESULTS

Assessment 71152B Effectiveness of Problem Identification: Based on the samples reviewed, the team determined that the licensee's performance in this area adequately supported nuclear safety. Overall, the team found that the licensee was identifying and documenting problems at an appropriately low threshold that supported nuclear safety.

Effectiveness of Prioritization and Evaluation of Issues: Overall, the team found that the licensee was appropriately prioritizing and evaluating issues to support nuclear safety. Of the samples reviewed, the team found that the licensee, in general, correctly characterized condition reports as to whether they represented conditions adverse to quality, and then prioritized the evaluation and corrective actions in accordance with program guidance.

Effectiveness of Corrective Actions: Overall, the team concluded that the licensee's corrective actions supported nuclear safety. Specifically, the staff at the Waterford Steam Electric Station, Unit 3 developed effective corrective actions for the problems evaluated in the corrective action program and generally implemented these corrective actions in a timely manner commensurate with their safety significance. Having said this, two examples were identified where this was not the case. The team informed the licensee of these errors, and they addressed them through the corrective action program. The team determined these were isolated instances and did not represent a programmatic issue.

As part of this inspection, the team selected the Auxiliary Component Cooling Water (ACCW) system for a focused review within the corrective action program. For this system, the team performed sample selections of condition reports, looking at the adequacy of the licensee's evaluation process for determining which items are placed in the corrective actions process, and the corrective actions taken. The team also reviewed the licensee's use of operational experience and the 10 CFR Part 21 process with respect to this system. No problems were noted.

Corrective Action Program Assessment: Based on the samples reviewed, the team determined the licensee's corrective action program complied with regulatory requirements and self-imposed standards, and the licensee's implementation of the corrective action program adequately supported nuclear safety. The team found that management's oversight of the corrective action program process was effective.

Assessment 71152B Operating Experience: The team reviewed a variety of sources of Operating Experience including 10 CFR Part 21 notifications and other vendor correspondence, NRC generic communications, and publications from various industry groups including INPO and EPRI. The team determined that the Waterford Steam Electric Station, Unit 3 is adequately screening and addressing issues identified through Operational Experience that apply to the station and that this information is evaluated in a timely manner once it is received. Having said this, a couple of minor examples of process errors regarding 10 CFR Part 21s were identified and entered into the licensee's corrective action program.

Self-Assessments and Audit Assessment: The team reviewed a sample of the licensee's departmental self-assessments and audits to assess whether they regularly identified performance trends and effectively addressed them. The team also reviewed audit reports to assess the effectiveness of assessments in specific areas. Overall, the team concluded that the licensee had an effective departmental self-assessment and audit process. The audits that the team reviewed were very detailed, thorough, and identified issues.

Assessment 71152B Safety-Conscious Work Environment: The team interviewed approximately 30 individuals in group sessions of varying sizes, plus some one-on-one interviews. The interviews were conducted in person. The purpose of these interviews was

(1) to evaluate the willingness of your staff to raise nuclear safety issues, either by initiating a condition report or by another method,
(2) to evaluate the perceived effectiveness of the corrective action program at resolving identified problems, and
(3) to evaluate the Waterford Steam Electric Station, Unit 3's safety-conscious work environment (SCWE). The focus group participants included personnel from Security, Engineering, and Production. Overall, the Waterford Steam Electric Station, Unit 3, was found to have an adequate SCWE.

Willingness to Raise Nuclear Safety Issues: In all the interviews, the team found no evidence of challenges to SCWE. Individuals in these groups expressed a willingness to raise nuclear safety concerns and other issues through at least one of the several means available.

However, the team found some work environment challenges in the security department. Through interviews with the staff members, it was identified that an environment exists where morale among officers is low due to continued staffing issues and high levels of overtime, leading to fatigue and work/life balance issues. The team posited that continued degradation of staff morale due to fatigue, could negatively impact staff performance.

Specifically, tired, and distracted people make mistakes. Plus, low morale may ultimately have a negative impact on SCWE.

Overall, the team concluded that all work groups at the Waterford Steam Electric Station, Unit 3, maintained a healthy safety-conscious work environment. However, morale issues may have a deleterious effect on staff performance and potentially on plant safety.

Employee Concerns Program: The team looked at the Waterford Steam Electric Station, Unit 3's Employee Concerns Program (ECP). The team interviewed the ECP manager and reviewed a number of investigations. Overall, the team determined that the investigation packages were of excellent quality, clearly demonstrating steps taken and basis for conclusions. In addition, the ECP manager demonstrated detailed knowledge of all the cases that were reviewed.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 28, 2022, the inspectors presented the biennial problem identification and resolution inspection results to Mr. Matt Lewis and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ECF14-046

WF3 Fire Safety Analysis - Fire Area RCB

Calculations

FP-CLC-01

Combustible Loading Calculation for Fire Area RCB

005

71152B

Corrective Action

Documents

CR-WF3-

2013-00445, 2015-05234, 2016-07183, 2018-04804, 2019-

01751, 2019-02349, 2019-03153, 2019-04695, 2019-06297,

2019-07175, 2020-00191, 2020-01109, 2020-02178, 2020-

2188, 2020-02316, 2020-02649, 2020-02945, 2020-05569,

20-05600, 2020-05607, 2020-05692, 2020-05855, 2020-

05982, 2020-06067, 2020-06110, 2020-06312, 2020-06336,

20-06462, 2020-06650, 2020-06722, 2020-06814, 2020-

06904, 2020-06924, 2020-06930, 2020-06939, 2020-06980,

20-07058, 2020-07178, 2020-07211, 2020-07215, 2020-

254, 2020-07255, 2020-07294, 2020-07328, 2020-07394,

21-00040, 2021-00062, 2021-00195, 2021-00198, 2021-

00199, 2021-00220, 2021-00226, 2021-00299, 2021-00300,

21-00326, 2021-00404, 2021-00469, 2021-00496, 2021-

00608, 2021-00836, 2021-00853, 2021-00895, 2021-00903,

21-00908, 2021-00912, 2021-00918, 2021-00922, 2021-

00924, 2021-00948, 2021-01116, 2021-01254, 2021-01268,

21-01299, 2021-01386, 2021-01492, 2021-01630, 2021-

01662, 2021-01784, 2021-01797, 2021-01835, 2021-01837,

21-02059, 2021-02251, 2021-02262, 2021-02290, 2021-

2312, 2021-02391, 2021-02466, 2021-02901, 2021-02993,

21-03036, 2021-03065, 2021-03671, 2021-03677, 2021-

03683, 2021-03832, 2021-03864, 2021-03868, 2021-03873,

21-04001, 2021-04165, 2021-04184, 2021-04236, 2021-

279, 2021-04614, 2021-04905, 2021-04911, 2021-04912,

21-04950, 2021-04974, 2021-04976, 2021-05004, 2021-

284, 2021-05322, 2021-05945, 2021-05242, 2021-05244,

21-06020, 2021-06180, 2021-06244, 2021-06466, 2021-

06554, 2021-06728, 2021-06774, 2022-00284, 2022-00342,

22-00546, 2022-00814, 2022-00854, 2022-01167, 2022-

01302, 2022-01503, 2022-01695, 2022-01837, 2022-01953,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

22-02217, 2022-02336, 2022-02475, 2022-02484, 2022-

2647, 2022-02746, 2022-02885, 2022-03125, 2022-03362,

22-03430, 2022-03513, 2022-03529, 2022-03552, 2022-

03575, 2022-03598, 2022-03704, 2022-03735, 2022-03963,

22-03999, 2022-04052, 2022-04112, 2022-04164, 2022-

283, 2022-04351, 2022-04699, 2022-05424, 2022-05531

EC 87009

Operability Input to CR-WF3-2020-02316 - Failure to Test

CCW Surge Tank LOLO Level Relays

000

EC-0068122

Operability Input for Cut Rebar Documented in CR-WF3-

2016-07183

EC-0086935

Operability Input for CR-WF3-2020-2178 CC

MPMP0001A(B)(AB)

EC-C94-015

Structural Design of ACCW Equipment Platforms

A

Engineering

Changes

ENGCHG-WF3-

EC-0000087009

Operability Input to CR-WF3-2020-02316 - Failure to Test

CCW Surge Tank LOLO Level Relays

000

Engineering

Evaluations

WF3-PE-

217881

Procurement Engineering Evaluation 00217881

05/19/2022

AR-21003222

Molded Case Circuit Breaker PM Classification Update

03/29/2021

LO-WLO-2020-

00058

Effectiveness review for CR-WF3-2020-6336

N/A

OBS-2020-

117987, 118055

N/A

OBS-2021-

0184, 3066, 3069, 3073, 3202, 3204, 7405, 7410, 8035,

8131, 8134, 9604, 9975, 9977, 14920, 17040, 21221, 21292

N/A

Performance

Review Meeting

(DPRM/APRM)

Radiation Protection - 4/22/2021, 7/27/2021, 10/28/2021,

2/31/2021

Performance

Review Meeting

(DPRM/APRM)

Maintenance (Electrical and I&C) - 4/28/2021, 7/14/2021,

10/27/2021, 1/25/2022

Miscellaneous

WLP-ESPC-

TRBLREFESH

Trouble Shooting Refresher

EN-AD-103

Document Control and Records Management Programs

EN-DC-141

Design Inputs

Procedures

EN-DC-161

Control of Combustibles

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EN-DC-206

Maintenance Rule (a)(1) Process

EN-EC-100

Employee Concerns Program

EN-EC-100-01

Employee Concerns Program Coordinator Training

EN-EC-101

Differing Professional Opinion Resolution Process

EN-EP-202

Equipment Important to Emergency Response

EN-EP-202

Equipment Important to Emergency Response

EN-FAP-DC-014

Engineering Change Stakeholder Engagement

EN-IS-124

Industrial Safety Planning & Job Safety Hazard Analysis

EN-LI-102

Corrective Action Program

EN-LI-118

Causal Analysis Process

EN-MA-106

Planning

EN-OE-100

Operating Experience Program

EN-OE-100-01

IER Level 1 and Level 2 Evaluations and Effectiveness

Reviews

EN-PL-100

Nuclear Excellence Model

EN-PL-187

Safety Conscious Work Environment (SCWE) Policy

EN-PL-190

Maintaining a Strong Safety Culture

EN-QV-136

Nuclear Safety Culture Monitoring

JA-PI-03

OE Screening

MI-004-300

Guidelines for Rework of Electronic Equipment

303

MI-004-300

Guidelines for Rework of Electronic Equipment

305

OP-006-010

TEDG Operations

OP-006-010

TEDG Operations

OP-010-003

Plant Startup

356

OP-010-003

Plant Startup

357

OP-010-003

Plant Startup

358

OP-010-003

Plant Startup

359

OP-010-003

Plant Startup

360

OP-010-003

Plant Startup

361

OP-100-014

Technical Specification and Technical Requirements

Compliance

355

Self-Assessments LO-WLO-2020-

00058

Effectiveness Review for CR-WF3-2020-06336

N/A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

QA-04-2022-W3-

Engineering (Design Control) Audit

4/18/2022

QA-12/18-2021-

W3-1

Combined Operations and Technical Specifications Audit

7/12/2021

QA-14/15-2021-

W3-01

Quality Assurance Audit Report - Combined Radiation

Protection and Radwaste Audit

10/25/2021

QA-3-2021-W3-1

Quality Assurance Audit Report - Corrective Action Program

(CAP)

06/29/2021

QS-2022-WF3-

2

22 Corrective Action Program (CAP) Surveillance

05/05/2022

216288

(OD) BMSR-416 - Type I Snubber Functional Test

N/A

518880

QSPDS #2 NODE BOX DOES NOT PRESENT DATA TO

REGULAR

DISPLAY

N/A

2776774

NG IPIS0945-B, NG IPS0935-B, NG MVAAA812, Calibrate

2796992

SI IF0390-B, Calibrate Flow Loop IAW MI Procedures

2824939

SM IYR6040-V, Calibrate Spectrum Recorder IAW MI-003-

345

545054

CC EREL701-Relay Perform Functional Test of LSX (CR 20-

2316)

550262

CC EREL702-Relay Perform Functional Test of LSX (CR 20-

2316)

554762

RC IHTE0221-B, REPLACE QSPDS 2 HJTC ASSEMBLY

N/A

554774

TROUBLESHOOT RC IUTE0221 B 20-6814

N/A

PMID

494, 533, 599, 616, 3618

Work Orders

WO-00524923

Replace Mechanical Seal on ACCMPMP0001 B Pump CR-