September 14, 2022

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - SECURITY BASELINE INSPECTION REPORT 05000382/2022403

Dear Mr. Ferrick:

On August 11, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2022403

Enterprise Identifier:

I-2022-403-0009

Licensee:

Entergy Operations, Inc

Facility:

Waterford 3

Location:

Killona, LA

Inspection Dates:

August 08, 2022 to August 12, 2022

Inspectors:

C. Jewett, Physical Security Inspector

A. Meyen, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Waterford Steam Electric Station,

Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

(2) Performance Evaluation Program: Inspectors observed a licensee conducted annual FOF on August 10,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 11, 2022, the inspectors presented the security baseline inspection results to John Ferrick and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR

22-03952 2022-03342 2022-03720 2022-02853 2022-

00759 2022-03037 2021-01127 2021-02432 2021-02429

21-01669 2021-00759

Corrective Action

Documents

Resulting from

Inspection

CR

22-01665 2022-05753 2022-05754 2022-05791 2022-

05802 2022-05803 2022-05813 2022-05814 2022-05816

Quarterly Drills

10/01/19 -

08/01/22

Annual Exercises

10/01/19 -

08/01/22

LLEA

Local Law Enforcement Liaison Plan (MOU)

03/09/22

PSP

Physical Security Plan

SCP

Safeguards Contingency Plan

Miscellaneous

T&Q

Training and Qualification Plan

EN-NS-215-01

Tactical Response Drills

EN-NS-215-02

Annual Force on Force Exercises

EN-NS-215-03

Triennial Force on Force Exercises

EN-NS-216

Controller Responsibilities Guideline

EN-NS-225

Multiple Integrated Laser Engagement System

EN-NS-234

Force on Force Mock Adversary Program

Procedures

PS-015-101

Security Patrols

310

71130.05

Self-Assessments

16-2021-W3-01

Security-Cyber Security Audit Report

2/13/21