Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000382/20223012022-03-28028 March 2022 NRC Examination Report 05000382/2022301 ML20307A1752020-10-19019 October 2020 NRC Examination Report 05000382/202008, ML20293A178 IR 05000382/20203012020-10-19019 October 2020 NRC Examination Report 05000382/2020301 IR 05000382/20183012018-12-14014 December 2018 NRC Examination Report 05000382/2018301 IR 05000382/20173012017-05-16016 May 2017 NRC Examination Report 05000382/2017301 IR 05000382/20153012015-11-0202 November 2015 Er 05000382/2015301; on 09/14/2015, 10/05/2015; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report IR 05000382/20143012014-05-15015 May 2014 Er 05000382-14-301; 04/02/2014 - 04/22/2014; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report IR 05000382/20123012013-01-0303 January 2013 Er 05000382-12-301, on October 1-November 19, 2012, Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report W3F1-2011-0062, Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 32011-07-24024 July 2011 Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 3 IR 05000382/20113012011-05-13013 May 2011 NRC Examination Report 05000382-11-301 IR 05000382/20103022010-11-23023 November 2010 Er 05000382/10-302, on 10/04/10 - 10/21/10; Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report IR 05000382/20103012010-05-0606 May 2010 Er 05000382-10-301 on March 16-24, 2010, Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report IR 05000382/20093012009-11-16016 November 2009 Er 05000382-09-301 on 10/05/2009 - 10/27/09 for Waterford Steam Electric Station, Unit 3 IR 05000382/20083012008-05-0101 May 2008 Er 05000382-08-301 on 03/24/08 - 04/16/08 for Waterford, Unit 3; Initial Operator Licensing Examination Report ML0808102172008-03-21021 March 2008 NRC Initial Operator Licensing Operating Test) Examination Approval (05000382/08/301) W3F1-2005-0076, Preparation and Scheduling of Operator Licensing Examinations2005-10-27027 October 2005 Preparation and Scheduling of Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000382/20033012003-09-16016 September 2003 Er 05000382-03-301, on 8/22/03 Through 28/2003, for Waterford 3, Entergy Operation Inc.; Initial Operator Licensing Examinations W3F1-2002-0014, WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations2002-01-30030 January 2002 WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations 2022-03-28
[Table view] |
Text
ber 14, 2018
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC EXAMINATION REPORT 05000382/2018301
Dear Mr. Dinelli:
On November 14, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 9, 2018, with Mr. Rob Simpson, Training Manager, and other members of your staff. A telephonic exit meeting was conducted on December 4, 2018, with Mr. John Signorelli, Regulatory Assurance Manager (Acting), who was provided the NRC licensing decisions.
The examination included the evaluation of three applicants for reactor operator licenses, two applicants for instant senior reactor operator licenses, and five applicants for upgrade senior reactor operator licenses. The license examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (CFR) Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff.
The Enclosure contains details of this report.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No.: 50-382 License No.: NPF-38 Enclosures:
1. Examination Report 05000382/2018301 w/Attachment: Supplemental Information 2. Simulator Fidelity Report
ML18348B239 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: TFarina Yes No Publicly Available Sensitive OFFICE OE:OB SOE:OB OE:OB HP: FCDB C:PBE C:OB NAME TFarina JKirkland MHayes CSteely NOKeefe VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA by email/ /RA/ /RA/
DATE 12/10/18 12/11/18 12/10/18 12/13/18 12/14/18 12/14/18
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Docket No.: 05000382 License No.: NPF-38 Report No.: 05000382/2018301 Licensee: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, LA 70057 Dates: November 5 - December 4, 2018 T. Farina, Chief Examiner, Operations Engineer J. Kirkland, Senior Operations Engineer Inspectors:
M. Hayes, Operations Engineer C. Steely, Health Physicist Vincent G. Gaddy, Chief Approved By: Operations Branch Division of Reactor Safety Enclosure
SUMMARY
ER 05000382/2018301; November 5 - December 4, 2018; Waterford Steam Electric Station,
Unit 3; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of three applicants for reactor operator licenses, two applicants for instant senior reactor operator licenses, and five applicants for upgrade senior reactor operator licenses at Waterford Steam Electric Station, Unit 3.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on November 14, 2018. NRC examiners administered the operating tests on November 5-9, 2018.
The examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On November 14, 2018, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on November 28, 2018.
The NRC examination team administered the various portions of the operating tests to all applicants on November 5-9, 2018.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating test. The final written examinations and post examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
The examination team noted one generic weaknesses associated with applicant performance on the simulator JPM section of the operating test. The applicants displayed a weakness responding to an unrecoverable loss of Component Cooling Water (CCW) to Reactor Coolant Pumps while at power, caused by an inadvertent Containment Spray Actuation Signal (CSAS). Specifically, three applicants tripped Reactor Coolant Pumps without first tripping the reactor while at 100% power, resulting in an automatic reactor trip. Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training. This weakness was entered into the licensees corrective action program as Condition Report WT-WTWF3-2018-00099, Corrective Action 196.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified. During one scenario run, High Pressure Safety Injection (HPSI) Pump B tripped unexpectedly during a large break LOCA. This did not affect the success path of the scenario however. The licensee has entered this into their corrective action program as Simulator Deficiency Report 18-0147.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
Exit Meeting Summary
The chief examiner presented the preliminary examination results to Mr. Rob Simpson, Training Manager, and other members of the staff on November 9, 2018. A telephonic exit was conducted on December 4, 2018, between Mr. Thomas Farina, Chief Examiner, and Mr. John Signorelli, Regulatory Assurance Manager (Acting).
The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Simpson, Training Manager
- D. Constance, Facility Reviewer
- J. Mendoza, Lead Examination Writer
NRC Personnel
- F. Ramirez, Senior Resident Inspector
- C. Speer, Resident Inspector
ADAMS DOCUMENTS REFERENCED