ber 7, 2018

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000382/2018007 and CONFIRMATORY ORDER (EA-15-100) FOLLOW-UP INSPECTION REPORT

Dear Mr. Dinelli:

On August 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the triennial fire protection program at your Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with Mr. S. Vazquez, General Manager Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

This inspection also assessed activities related to the implementation of the commitments described in Confirmatory Order NRC Inspection Report 05000382/2016007 and NRC Investigation Report 4-2014-017, dated April 6, 2016 (ADAMS Accession Number ML16096A474). The inspectors reviewed the action items associated with the subject commitments to determine the status of those commitments and the enclosed inspection report describes the results of those reviews. This report documents the NRCs conclusion that the requirements of the Confirmatory Order have been met.

No findings or violations of NRC requirements of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-382 License No. NPF-38 Enclosure:

Inspection Report 05000382/2018007 w/Attachment: Documents Reviewed

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number: 05000382 License Number: NPF-38 Report Number: 05000382/2018007 Enterprise Identifier: I-2018-007-0003 Licensee: Entergy Operations, Inc.

Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, Louisiana Inspection Dates: July 30, 2018, to August 16, 2018 Inspectors: J. Mateychick, Senior Reactor Inspector (Team Lead)

S. Alferink, Reactor Inspector B. Correll, Reactor Inspector S. Makor, Reactor Inspector N. Okonkwo, Reactor Inspector Approved By: G. Werner, Chief Engineering Branch 2 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting a triennial fire protection inspection and a confirmatory order follow-up inspection at Waterford Steam Electric Station, Unit 3 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. No licensee-identified non-cited violations are documented in the report.

List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.

Additional Tracking Items Type Issue number Title Report Status Section CO Confirmatory Order Waterford Steam Electric 1 Reviewed EA-15-100 Station - Confirmatory Order NRC Inspection Report 05000382/2016007 and NRC Investigation Report 4-2014-017

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.05XT - Fire Protection - NFPA 805 (Triennial)

The inspectors evaluated the following from July 30, 2018, to August 16, 2018.

Fire Protection Inspection Requirements ===

The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

Fire Area Description RAB 7 Relay Rooms (+35' Elevation)

RAB 8 Switchgear Rooms RAB 15 Diesel Generator B Room

B.5.b Inspection Activities (2 Samples)

The inspectors evaluated feasibility of the following B.5.b mitigating strategies contained in Procedure S-SAMG-01, Supplemental SAMG Loss of Large Areas of the Plant Due to Fire/Explosion, Revision 020:

(1) Section 9.0, Reactor Coolant System (RCS) Heat Removal Via Steam Generators
(2) Section 10.0, Containment Flooding and RCS Injection

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 92702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders The inspectors reviewed the licensee response to Confirmatory Order EA-15-100 by specifically reviewing the actions taken in association with Section V of the Order.

INSPECTION RESULTS

Confirmatory Waterford Steam Electric Station - Confirmatory Order NRC 92702 Order Inspection Report 05000382/2016007 and NRC Investigation EA 15-100 Report 4-2014-017

Description:

To ensure the effectiveness and completeness of the implementation of the Confirmatory Order commitments, the inspectors reviewed the root cause analysis; Condition Report CR-WF2-2014-063, and the associated corrective actions; reviewed documents and records produced to meet the specific items in the Confirmatory Order; performed follow-up interviews of some security and fire watch personnel who have been assigned with the fire watch responsibilities following the implementation of Confirmatory Order; and reviewed the licensees effectiveness reviews of actions taken to address the Confirmatory Order commitments.

The inspectors concluded that the individual Confirmatory Order Section V items and the associated action plans were adequately completed and were effective in achieving the associated performance improvement objectives of the Order.

Corrective Action Reference(s): The licensee still had a small number of open corrective actions associated with the Order, including Condition Reports CR-WF3-2018-04337, CR-WF3-2018-04338, and CR-WF3-2018-04335.

EXIT MEETINGS AND DEBRIEFS

On August 2, 2018, the inspectors presented the Confirmatory Order follow-up inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.

On August 16, 2018, the inspectors presented the triennial fire protection inspection results to Mr. S. Vazquez, General Manager Plant Operations, and other members of the licensee staff.

The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.05XT - Fire Protection - NFPA 805 (Triennial)

Cable Routing Data Components

ACC-139A BAM-113A CVC-101 CVC-103 CVC-109

ACC-139B BAM-113B

Calculations

Number Title Revision

ECE91-056 Relay Settings and Coordination Curves for 6.9kV, 4

4.16kV, and 480V Buses

ECE94-005 Low Voltage Coordination Study 1

EE5-32-2 Appendix R - Associated Circuit Analysis - Coordination 2

Study

EC-F00-009 Hydraulic Calculation of Suppression System FPM-25B 2

EC-F00-013 Hydraulic Calculation of Suppression System FPM-29 2

EC-F00-014 Hydraulic Calculation of Suppression System FPM-30A 1

EC-F09-005 NFPA-805 Transition, Non-Power Operating Mode 3

(NPO)

EC-F10-021 WF3 NFPA 805 Fire Risk Evaluation - Fire Area RAB-15 1

EC-F13-001 WF3 Post-Fire NSCA (NFPA-805) 2

EC-F13-002 WF3 NFPA 805 Fire Risk Evaluation - Fire Area RAB-7 0

EC-F13-003 WF3 NFPA 805 Fire Risk Evaluation - Fire Area RAB-8 0

EC-F99-002 Supply System Hydraulic Calculation Data File 1

EC-F99-009 Hydraulic Calculation of Suppression System FPM-4B 2

EC 1617 B.5.b Phase 2 and 3 Mitigation Strategy Portable Pump 0

and Line Loss Evaluation

ECF13-001 Post-Fire NSCA (NFPA-805) 2

ECF14-006 WF3 Fire Safety Analysis - Fire Area RAB 1 2

ECF14-008 WF3 Fire Safety Analysis - Fire Area RAB 2 1

ECF14-013 WF3 Fire Safety Analysis - Fire Area RAB 7 2

ECF14-014 WF3 Fire Safety Analysis - Fire Area RAB 8 2

ECF14-019 WF3 Fire Safety Analysis - Fire Area RAB 15 2

Calculations

Number Title Revision

ECF14-039 WF3 Fire Safety Analysis - Fire Area RAB 35 1

ECF14-041 WF3 Fire Safety Analysis - Fire Area RAB 37 1

ECF14-043 WF3 Fire Safety Analysis - Fire Area RAB 39 1

MMNQ3-5 Flooding Analysis Outside Containment 5

PRA-W3-05-005 Waterford 3 Fire PRA Multi-Compartment Analysis and 3

Hot Gas Layer Impact Evaluation

PRA-W3-05-006F Waterford 3 Fixed Ignition Source Zone of Influence 1

Methods

PRA-W3-05-007 Waterford 3 Fire PRA Summary Report 3

PRA-W3-05-100 Waterford 3 Fire Risk Evaluation Quantification and 0

Analysis Report

Condition Reports (CR-WF3-xxxx-xxxxx)

2015-00540 2015-03501 2018-00573 2016-07759 2018-04276

2018-04286 2018-04287 2018-02055 2018-02112 2018-04289

2016-07759 2018-04360* 2018-04362* 2018-04354* 2018-04362*

2018-04357* 2018-04412* 2018-04664* 2018-04359* 2018-00617

2015-03502 2018-00573 2018-04497* 2018-04601* 2018-04453*

2017-08611 2017-08737 2018-00053 2006-04460 2006-04054

2018-04276 2018-04296 2018-04356* 2015-00859 2018-04336*

2018-04497* 2017-00134 2018-02089 2018-04628* HQN-2018-01769

  • Issued as a result of inspection activities.

Drawings Number Title Revision

B424 Sheet 2388 4.16kV Bus 3B3-S Undervoltage Relays Sheet 2 13

B424 Sheet 2390 480V Bus 3B31-S Undervoltage Relays Sheet 2 17

B424 Sheet 2391 Sequencer B Sheet 1 18

B424 Sheet 2939 Isolation Switch Dev - Aux Pnl 2B 4

B424 Sheet 2937 Isolation Switch Dev - Aux Pnl 1B 2

B424 Sheet 2942 Transfer Switch Development Aux Panel - 2 16

B289 Sheet 15A 4.16kV Switchgear 3A3-S Protective Relay Settings 9

B289 Sheet 15-1 4.16kV Swgr 3A3-S One-Line Diagram 4

B289 Sheet 15 Power Distribution and Motor Data 4.16kV Swgr 3A3-S 11

One-Line Diagram

B424 Sheet 2335 4.16kV Bus 3AB3-S Tie to Bus 3A3-S 12

Drawings Number Title Revision

B424 Sheet 2334 4.16kV Bus 3A3-S Tie to Bus 3AB3-S 12

B424 Sheet 2527 480V Bus 3AB31-S Tie to Bus 3A31-S 8

B424 Sheet 2477 480V Bus 3A31-S Tie to Bus 3AB31-S 10

B424 Sheet 300 Letdown Stop Valve 1CH-FI516 A/B 17

B424 Sheet 301 Letdown Containment Isolation Valve 1CH-F2501 A/B 17

B424 Sheet 302 Letdown Containment Isolation Valve 2CH-F1518 A/B 13

B424 Sheet 709 Component Cooling Water Pump B 14

B424 Sheet 848 Shutdown Heat Exchanger Outlet Valve 3CC-F131B 12

B424 Sheet 292 Pressurizer Proportional Heater Bank - 2 18

B424 Sheet 2978 Diverse Emergency Feedwater Actuation System 03

(DEFAS) - Sheet 1

B424 Sheet 2979 Diverse Emergency Feedwater Actuation System 02

(DEFAS) - Sheet 2

B424 Sheet 2980 Diverse Emergency Feedwater Actuation System 02

(DEFAS) - Sheet 3

B424 Sheet 2976 Control Wiring Diagram Diverse Reactor Trip System 02

B424 Sheet 1565 Steam Generator No. 2 Blowdown Containment 13

Isolation Valve 2BD-F605 and 2BD-F606

G153, Sheet 4 Flow Diagram Feedwater, Condensate and Air 49

Evacuation Systems

G161, Sheet 1 Flow Diagram Fire, Make-Up and Domestic Water 39

Systems

G161, Sheet 3 Flow Diagram Fire, Make-Up and Domestic Water 31

Systems

G161, Sheet 5 Flow Diagram Fire, Make-Up and Domestic Water 5

Systems

G168, Sheet 2 Flow Diagram Chemical and Volume Control System 55

Engineering

Reports Number Title Revision

WF3-FP-15-00002 NFPA 805 Monitoring Program Phase 1: Scoping 0

WF3-FP-15-00003 NFPA 805 Monitoring Program Phase 2/3: Quantitative 1

Screening and Risk Target Values

Engineering

Reports Number Title Revision

WF3-FP-15-00004 NFPA 805 Monitoring Program Phase 2: Qualitative 0

Screening Results

WF3-FP-15-00006 NFPA 805 Monitoring Program: Expert Panel 0

Documentation

WF3-FP-11-00001 NFPA 805 Table G-1 and Section 4.4 of the Transition 2

Report on Radioactive Release

Fire Impairments17-094 17-127P 17-158 17-287 18-058P 18-065P 18-113P 18-135P

Miscellaneous

Documents Revision

Number Title or Date

Audit Report Fire Protection February 26,

QA-9-2018-W3-1 2018

EN-DC-330 Fire Protection Program 5

EN-SA-G-001 Identification and Documentation of Time Critical Actions 1

FAQ 07-0030 Establishing Recovery Actions 5

Lesson Plan Fire Field Refresher Training 0

WGATT-AOR-

17HITFFR04

Lesson Plan WLP- Fire Brigade Site Specific Training and Biennial

AOR-17HITIFB01 Refresher

Lesson Plan WLP- Severe Accident Management Guidelines 0

AOR-166SAMG

Lesson Plan WLP- Fire Brigade Leader Incident Commander 0

AOR-184FBL02

Lesson Plan WLP- Severe Accident Management Guidelines 16

EP-SAM00

Lesson Plan WLP- Fire Brigade Site Specific Training and Biennial

FPFB-IFB01 Refresher

Lesson Plan WLP- Severe Accident Management Guidelines 0

LOR-166SAM00

Lesson Plan WLP- Fire Protection System 19

OPS-FP00

Letter W3F1- Response Providing Information Regarding January 11,

2006-0064 Implementation Details for the Phase 2 and Phase 3 2007

Mitigation Strategies

Miscellaneous

Documents Revision

Number Title or Date

Letter W3F1- Supplemental Response Regarding Implementation April 26, 2007

2007-0016 Details for the Phase 2 and Phase 3 Mitigation

Strategies

LO-WLO-2017- Pre-NRC Triennial Fire Protection Inspection Focused May 6, 2018

00073 Self-Assessment

OE-NOE-2016- RIS 2015-017 Review and Submission of Updates to 0

00008 CA-19 Final Safety Analysis Reports, Emergency

Preparedness Documents, and Fire Protection

Documents

OE-NOE-2016- OE-2016-00194 0

00124 CA-17

OE-NOE-2016- PSSB 20161010A - Use of Non-Phosphate Ester EHC 0

00345 CA-18 Fluid in GE Steam Turbines

OE-NOE-2017- OE-2016-00077 - Plant Personnel Do Not Plan, 0

00016 CA-14 Schedule, and Coordinate Work Effectively at Times

OE-NOE-2017- CR-ANO-C-2016-03405 0

00049 CA-15

OE-NOE-2017- CR-ANO-S-2017-4836 - Control of Flammable Materials 0

00389 CA-11

PSA-W3-03-01 Waterford 3 Methodology for Addressing VFDRs in the 1

Fire PRA and NFPA-805

Permit ID 18-124 Transient Combustible Permit

Permit ID 18-126 Transient Combustible Permit

Permit ID 18-127 Transient Combustible Permit

Permit ID 18-128 Transient Combustible Permit

Permit ID 18-129 Transient Combustible Permit

Pre-Fire Strategy Elevation +35.00 RAB Relay Room 12

RAB 7-001

Pre-Fire Strategy Switchgear Room A 11

RAB 08A-001

Pre-Fire Strategy Switchgear Room B 12

RAB 08B-001

Pre-Fire Strategy Switchgear Room A/B 11

RAB 08C-001

Miscellaneous

Documents Revision

Number Title or Date

Pre-Fire Strategy Emergency Diesel Generator 3B 8

RAB 15-001

TRM 3/4.3.3.8 Fire Detection Instrumentation 138

TRM 3/4.7.10 Fire Suppression Water Systems 138

TRM 3/4.7.10.2 Spray and/or Sprinkler Systems 146

TRM 3/4.7.10.4 Fire Hose Stations 138

TRM 3/4.7.10.5 Yard Fire Hydrants and Hydrant Hose Houses 138

TRM 3/4.7.10.11 Fire-Rated Assemblies 138

TRM 3/4.3.3.8 Fire Detection Instrumentation 138

W3-DBD-018 10 CFR 50.48 (a) and (c)/NFPA 805/Fire Protection 3

Upper Level DBD

WF3-FP-08 One hour rated 3-M Interam E-54A Support and Heat 0

Transfer Items - Deviation to thermocouple placement

requirements Generic Letter 86019, Supplement 1, as

tested in Fire Test CTP 1199 and Supplementary Item in

2019

WF3-FP-10-00006 WF3 Code Compliance Report for NFPA 72D Standard 1

for the Installation, Maintenance and Use of Proprietary

Signaling Systems for Watchmen, Fire Alarm and

Supervisory Service, 1975 Edition

WF3-FP-10-00007 WF3 Code Compliance Report for NFPA 72E 2

Automatic Fire Detectors, 1974 Edition

WF3-FP-10-00013 WF3 Code Compliance Report for NFPA 13, Standard 1

for Installation of Sprinkler Systems,

1976 Edition

WF3-FP-10-00015 WF3 Code Compliance Report for NFPA 20 Centrifugal 1

Fire Pumps, 1972 Edition

WF3-FP-10-00019 NFPA 805 Chapter 3: Fundamental Fire Protection 2

Program and Design Elements Review (Table B-1)

WF3-FP-11-00017 W3 NFPA 805 Fire Area Transition Evaluation 2

(Table B-3)

WF3-FP-13-00001 IN 92-18 Motor Operated Valve Failure Evaluation 2

WF3-FP-13-00003 Recovery Action Feasibility and Reliability Review 1

Miscellaneous

Documents Revision

Number Title or Date

WF3-FP-17-00001 Risk Assessment of WF3 SUPS EC-43927 2

WF3-FP-18-00001 Evaluation of Fire Damper FD-76 and FD-77 0

WSES-FSAR- Fire Protection 310

UNIT-3,

Section 9.5.1

Modification

Number Title

AR 259964259964 Delete PM Requirement for FR Test Switches

Procedures

Number Title Revision

EN-DC-115 Engineering Change Process 25

EN-DC-127 Control of Hot Work and Ignition Sources 18

EN-DC-128 Fire Protection Impact Reviews 11

EN-DC-324 Preventive Maintenance Program 21

EN-DC-161 Control of Combustibles 17

EN-DC-186 Fuse Control 2

EN-DC-357 NFPA 805 Monitoring Program 2

EN-DC-359 Fire Risk Management During Non-Power Operations 1

for NFPA 805 Plants

EN-OP-123 Time Critical Action/Time Sensitive Action Program 000

Standard

FP-001-014 Duties of a Firewatch 21

FP-001-015 Fire Protection System Impairments 321

FP-001-019 Fire Brigade Equipment 309

FP-001-020 Fire Emergency/Fire Report 312

FP-001-024 Fire Prevention Inspection 1

ME-003-002 Fire Detector Supervisory Circuit Functional Test 319

ME-003-004 Fire Dampers 10

ME-003-006 Fire Barrier Penetration Seals 311

Procedures

Number Title Revision

ME-003-009 Fire-Rated Walls, Floors, and Ceilings 307

ME-003-012 Cerberus Pyrotronics ID-60 Series Intelligent Detector 316

Testing

ME-003-017 Cerberus Pyrotronics Thermal Detector Testing 312

ME-003-301 480 VAC Overcurrent Protective Integrated Device 008

Functional Test

ME-004-121 4.16kV Switchgear Maintenance 017

ME-004-463 Paging System 011

OP-006-001 Plant Distribution (7kV, 4kV, and SSD) System 331

OP-009-004 Fire Protection 321

OP-901-502 Evaluation of Control Room and Subsequent Plant

Shutdown

OP-901-502 Evaluation of Control Room and Subsequent Plant

Shutdown

OP-901-502 Evaluation of Control Room and Subsequent Plant 035

Shutdown

OP-901-524 Fire Areas Affecting Safe Shutdown 17

OP-903-053 Fire Protection System Pump Operability Test 20

OP-903-054 Fire Protection Valve Lineup Check 11

OP-903-055 Fire Main Flush and Hydrant Inspection 11

OP-903-056 Fire Protection Functional Test 309

OP-903-057 Fire Protection System Flow Test 023

PLG-009-014 Conduct of Planned Outages 315

S-SAMG-01 Loss of Large Areas of the Plant Due to Fire/Explosion 020

UNT-005-013 Fire Protection Program 14

UNT-005-034 Communication Affecting Plant Operation 007

UNT-006-033 Technical Specifications Surveillance Frequency List 1

Vendor

Documents

Number Title Revision

GEH-1802 Types M26 and M36 for Magne-Blast Air Circuit Breaker X

Types AM-4.16 and AM-13.8

Tech Pub 24-1 Series 24 Instrument and Control Switches 2/98

GEH-2636 Armor-Clad Indoor Feeder Busway 6-75

Work Orders

2321112 00099542 52283342 52700943 52816894 52822026 52748895

2709413 52709412 52709411 52603247 52606298 52610650 52821792

2757271 52757271 52831291 52515208 52735558 52755814 52769009

2587397 52649177 52728394 52803417 00033196 52570142 52600440

2358489 00040986 00047412

2702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations,

Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution

Confirmatory Orders

Condition Reports (CR-WF3-xxxx-xxxxx)

2013-06073 2014-00631 2014-00695 2014-05660 2014-00631

2015-07022 2015-07707 2016-00201 2016-00202 2018-04337*

2018-04335* 2018-04338*

  • Issued as a result of inspection activities.

Miscellaneous

Documents Revision

Number Title or Date

FFAM-SUPV- Supervisor Training Program Familiarization Guide 13

00001

FCBT-SUPV- 10 CFR 50.5/7/9 Compliance CBT 0

CFR-Compliance

FCBT-SUPV- 10 CFR 50.5/7/9 Compliance CBT 0

CFR-Compliance

QS-2014-W3-010 Quality Assurance Surveillance Report December 9,

2014

ADI Fleet-Wide Assessment of Integrity Events December 10,

(2011-2016) 2016

Talisman Report Effectiveness Assessment EN-OM-126 September 26,

2016

CR-WF3-2014- Root Cause Analysis for Failure to Complete Required March 16, 2014

0631 Hourly Watch Inspection

Procedures

Number Title Revision

FP-001-014 Duties of a Firewatch 21

FP-001-014 Duties of a Firewatch 17

FP-001-014 Duties of a Firewatch 08

EN-MA-126 Control of Supplemental Personnel 16

EN-NS-101-04 Processing Potentially Disqualifying Information 1

EN-OM-126 Management and Oversight of Supplemental Personnel 6

EN-MP-106 Contract Management 1

EN-NS-101 Unescorted Access Authorization Program 25

EN-OP-139 Fire Watch Program 0

EN-OP-139 Fire Watch Program 2

ML18253A135

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002

By: JMM Yes No Publicly Available Sensitive

OFFICE RI:EB2 RI:EB2 RI:EB2 RI:EB2 SRI:EB2 BC:ACES BC:DRPD

NAME BCorrell SMakor SAlferink NOkonkwo JMateychick MVasquez NOKeefe

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 9/4/2018 8/23/2018 9/4/2018 9/4/2018 9/5/2018 9/6/2018 9/7/2018

OFFICE BC:EB2

NAME GWerner

SIGNATURE /RA/

DATE 9/7/2018