Integrated Inspection Report 05000382/2022003
ML22300A103
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/01/2022
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Ferrick J
Entergy Operations
Dixon J
References
IR 2022003
Download: ML22300A103 (14)


See also: IR 05000382/2022003

Text

November 01, 2022

John Ferrick

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 INTEGRATED INSPECTION

REPORT 05000382/2022003

Dear John Ferrick:

On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at Waterford Steam Electric Station, Unit 3. On October 18, 2022, the NRC

inspectors discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

John L. Dixon, Jr., Chief

Projects Branch D

Division of Operating Reactor Safety

Docket No. 05000382

License No. NPF-38

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

Signed by Dixon, John

on 11/01/22

ML22300A103

SUNSI Review

ASanchez

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

SRI:DORS/D

RI:DORS/D

SPE:DORS/D

BC:DORS/D

NAME

APatz

AChilds

ASanchez

JDixon

DATE

10/27/2022

11/01/2022

10/31/2022

11/01/2022

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2022003

Enterprise Identifier:

I-2022-003-0007

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, LA 70057

Inspection Dates:

July 1, 2022, to September 30, 2022

Inspectors:

D. Childs, Resident Inspector

T. Farina, Senior Operations Engineer

A. Patz, Senior Resident Inspector

Approved By:

John L. Dixon, Jr., Chief

Projects Branch D

Division of Operating Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Waterford Steam Electric Station, Unit 3,

in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the

NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer

to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

3

PLANT STATUS

Unit 3 began the inspection period at rated thermal power and remained at or near rated

thermal power for the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of

IPs. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission rules

and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1)

The inspectors evaluated the adequacy of the overall preparations to protect

risk-significant systems from seasonal heavy rains and severe weather due to

potential for hurricane development on August 31, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

emergency feedwater system trains A, B, and AB during and following maintenance

on emergency feedwater pump B on July 28, 2022

(2)

emergency diesel generator system train B while train A was inoperable during

surveillance testing on September 6, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

4

(1)

fire area RAB 2-002, elevation +46.00' reactor auxiliary building main steam isolation

valve passage and fire area RAB 3A-003, elevation +21.00' reactor auxiliary building

vestibule on July 6, 2022

(2)

fire area RAB 32-001, elevation -35.00' auxiliary component cooling water room and

pipe penetration area on July 18, 2022

(3)

fire area RAB 8B-001, elevation +21.00' reactor auxiliary building switchgear room B

on August 12, 2022

(4)

fire area RAB 17-001, elevation +21.00' reactor auxiliary building component cooling

water pump B room, and fire area RAB 21-001, elevation +21.00' reactor auxiliary

building component cooling water heat exchanger B room, on September 1, 2022

(5)

fire area RAB 8A-001, elevation +21.00' reactor auxiliary building switchgear room A

on September 2, 2022

(6)

fire area RAB 25-001, elevation +21.00' reactor auxiliary building decon area on

September 27, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1)

elevation +21.00' component cooling water pump and heat exchanger areas on

September 1, 2022

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1)

The inspectors reviewed and evaluated the licensed operator examination failure

rates for the requalification annual operating exams administered on August 30,

2022.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1)

The inspectors observed and evaluated licensed operator simulator training on

September 20, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components (SSCs) remain capable of performing their intended

function:

(1)

engineered safety features actuation system train B following auxiliary component

cooling water pump B failure to start during testing on September 21, 2022

(2)

control room air handling system train B following failure of an electric relay on

September 30, 2022

5

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1)

elevated green risk for motor-driven emergency feedwater pump B outage during the

week of July 25, 2022

(2)

planned yellow risk due to low-pressure safety injection and containment spray

train B outages during the week of August 8, 2022

(3)

elevated green risk due to unexpected plant protection system power supply failure

during the week of September 6, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1)

component cooling water system following identification of inleakage on July 28, 2022

(2)

reactor trip circuit breakers following surveillance failure on August 5, 2022

(3)

feedwater ultrasonic flow meter following erratic indication and repair difficulties on

September 8, 2022

(4)

containment fan cooler train B following loss of motor control center 317B on

September 22, 2022

(5)

offsite power following automatic isolation of west switchyard bus on

September 29, 2022

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system

operability and/or functionality:

(1)

emergency feedwater pump A after planned maintenance on the motor on

July 6, 2022

(2)

emergency feedwater pump B after planned maintenance on July 28, 2022

(3)

low-pressure safety injection train A header to reactor coolant loop 2A flow control

valve SI-139A following planned maintenance on August 9, 2022

(4)

containment spray train A header isolation valve CS-125A following planned solenoid

replacements on August 11, 2022

(5)

component cooling water pump B following corrective maintenance on

August 18, 2022

(6)

plant stack wide range radiation monitors following identification of incorrect reference

values on September 9, 2022

6

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability

and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1)

dry cooling tower A diesel driven sump pump surveillance testing on August 31, 2022

(2)

containment spray pump surveillance testing on September 29, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1)

steam generator 2 atmospheric dump valve inservice testing on July 21, 2022

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1)

a full site integrated drill for a simulated site area emergency on September 13, 2022

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1)

Unit 3 (July 1, 2021, through June 30, 2022)

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1)

Unit 3 (July 1, 2021, through June 30, 2022)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1)

Unit 3 (July 1, 2021, through June 30, 2022)

71152S - Semiannual Trend Problem Identification and Resolution

Semiannual Trend Review (Section 03.02) (1 Sample)

(1)

The inspectors reviewed the licensees corrective action program and maintenance

rule tracking program for potential adverse trends in radiation monitor equipment

performance and corrective actions that might be indicative of a more significant

safety issue.

7

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 30, 2022, the inspectors presented the annual requalification exam

inspection results to Van Ford, Superintendent, Operations Training, and other members

of the licensee staff.

On October 18, 2022, the inspectors presented the integrated inspection results to

John Ferrick and other members of the licensee staff.

8

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Engineering

Evaluations

W3F1-2015-0042

Flood Hazard Reevaluation Report

07/21/2015

71111.01

Procedures

OP-901-521

Severe Weather and Flooding

340

71111.04

Procedures

OP-009-002

Emergency Diesel Generator

360

71111.04

Procedures

OP-009-003

Emergency Feedwater

312

71111.05

Calculations

ECF91-010

Combustible Loading Calculation for Fire Area RAB 8

4

71111.05

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

2022-05705

71111.05

Fire Plans

RAB 17-001

Component Cooling Water Heat Exchanger B Fire Plan

9

71111.05

Fire Plans

RAB 2-002

Main Steam Isolation Valve Passage

7

71111.05

Fire Plans

RAB 21-001

Component Cooling Water Pump B Fire Plan

9

71111.05

Fire Plans

RAB 25-001

RAB +21 Decon Area

9

71111.05

Fire Plans

RAB 32-001

Auxiliary Component Cooling Water Room & Pipe

Penetration Area

11

71111.05

Fire Plans

RAB 3A-003

Vestibule

4

71111.05

Fire Plans

RAB 8A-001

Switchgear Room A

13

71111.05

Fire Plans

RAB 8B-001

Reactor Auxiliary Building +21.00' elevation

14

71111.05

Miscellaneous

TCP 22-110

Transient Combustible Permit for Fire Area RAB 8

04/11/2022

71111.05

Miscellaneous

TCP 22-116

Transient Combustible Permit for Fire Zone RAB 8A

04/18/2022

71111.05

Procedures

EN-DC-161

Control of Combustibles

24

71111.05

Procedures

EN-DC-161

Control of Combustibles

25

71111.05

Procedures

MM-006-106

Plant Door Maintenance

335

71111.05

Work Orders

52969317

71111.06

Calculations

MNQ3-5

Flooding Analysis Outside Containment

6

71111.11A

Miscellaneous

N/A

2022 Annual NRC Operating Test Results

08/29/2022

71111.11Q

Procedures

EN-TQ-100

Operations Training Program Description

3

71111.11Q

Procedures

OP-902-000

Standard Post Trip Actions

17

71111.11Q

Procedures

OP-902-003

Loss of Offsite Power / Loss of Forced Circulation

11

71111.12

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

2022-1562, 2022-3627, 2022-04666

71111.12

Miscellaneous

SD-CC

Component Cooling Water

25

9

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Miscellaneous

SD-PPS

Plant Protection System

22

71111.12

Miscellaneous

W3-DBD-38

Safety Related HVAC - Control Room

302

71111.12

Procedures

EN-FAP-LI-001

Performance Improvement Review Group (PRG) Process

19

71111.12

Procedures

EN-LI-102

Corrective Action Program

47

71111.12

Procedures

EN-LI-118

Causal Evaluation Process

35

71111.12

Procedures

OP-903-068

Emergency Diesel Generator and Subgroup Relay

Operability Verification

326

71111.13

Corrective Action

Documents

CR-WF3-YYYY-

XXXXX

2022-06304

09/06/2022

71111.13

Miscellaneous

Tagout : 2022-0106-LPSI Pump A

08/09/2022

71111.13

Miscellaneous

Tagout: 2022-0107-CS Train A

08/09/2022

71111.13

Miscellaneous

Tagout: 2022-0108-

0809/2022

71111.13

Procedures

EN-OP-119

Protected Equipment Postings

16

71111.13

Work Orders

52980548, 52988875

71111.13

Work Orders

53000802

09/06/2022

71111.15

Corrective Action

Documents

CR-WF3-YYYY-

XXXXX

2022-5674

08/05/2022

71111.15

Engineering

Changes

ER-W3-2002-

0519-000

Install Software to Improve Path Reliability on LEFM

10/31/2002

71111.15

Miscellaneous

DES-I-018

Feedwater Flow Measurement Instrumentation Specification

for Main Feedwater System

0

71111.15

Miscellaneous

DES-I-018

Feedwater Flow Measurement Instrumentation Specification

for Main Feedwater System

0

71111.15

Miscellaneous

Technical

Requirements

Manual 0

Technical Requirements Manual - Amendment 17

177

71111.19

Procedures

ME-004-330

4kV Induction Motor Maintenance

304

71111.19

Procedures

ME-007-008

Motor Operated Valves

20

71111.19

Procedures

MI-004-644

Testing of Solenoid Valves

1

71111.19

Procedures

OP-903-050

Component Cooling Water and Auxiliary Component Cooling

Water Pump and Valve Operability Test

44

71111.19

Procedures

OP-903-121

Safety Systems Quarterly IST Valve Tests

35

71111.19

Work Orders

52988875, 52952762, 52980548, 52946634, 52953000,

10

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

52946634, 53006370

71111.22

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

2019-3025, 2019-3164, 2020-5920, 2020-6021, 2020-7200,

2021-0344, 2022-1819, 2022-4487

71111.22

Engineering

Changes

EC 88384

Operability Input to CR-WF3-2020-6021

10/25/2020

71111.22

Engineering

Changes

EC 88921

Rebaseline MS-116B

01/25/2021

71111.22

Engineering

Changes

ECM97-059

Design Basis Review for Atmospheric Dump Valves MS-

116A and MS-116B

001

71111.22

Procedures

CEP-IST-4

Standard on Inservice Testing

311

71111.22

Procedures

ECS09-005

Air Operated Valves - Design Basis Accident Times

001

71111.22

Procedures

OP-100-014

Technical Specification and Technical Requirements

Compliance

364

71111.22

Procedures

OP-903-035

Containment Spray Pump Operability Check

34

71111.22

Procedures

OP-903-120

Containment and Miscellaneous Systems Quarterly IST

Valve Tests

035

71111.22

Procedures

SEP-WF3-IST-1

WF3 Inservice Testing Bases Document

010

71111.22

Procedures

SEP-WF3-IST-2

WF3 Inservice Testing Plan

011

71111.22

Procedures

W4-DBD-6

Main Steam System - design basis document

302

71111.22

Work Orders

52894192, 52955201, 52860841, 53002488, 552605,