Discusses Review of Re Issue 063, Containment Purge & Vent. Installation of Debris Screens to Protect Ventilation Sys Isolation Valves Acceptable & Will Be verified.NUREG-0868,Section 5.3.6.2 Satisfied
ML20128E610
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/24/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
RTR-NUREG-0868, RTR-NUREG-868 LSO5-85-05-029, LSO5-85-5-29, NUDOCS 8505290426
Download: ML20128E610 (2)


Text

. -

jo s May 24, 1985 Docket No. 50-155 DISTRIBUTION LS-05-85-05-029 Docket File HThompson NRC PDR Local PDR ORB #5 Rdg OELD JZwolinski JPartlow Mr. David J. VandeWalle CJamerson EJordan Director, Nuclear Licensing RDudley BGrimes Consumers Power Company EMcKenna ACRS (10) 1945 West Parnall Road RScholl Jackson, Michigan 49201 CGrimes

Dear Mr. VandeWalle:

SUBJECT:

NUREG-0828 (INTEGRATED PLANT SAFETY ASSESSMENT, BIG ROCK POINT)

SECTION 5.3.6.2, CONTAINMENT PURGE AND VENT Re: Big Rock Point Plant The NRC staff has reviewed your letter dated February 12, 1985, regarding Issue No. 063, Containment Purge and Vent. Pending receipt of material, you committed to install debris screens to protect the ventilation system isolation valves. The staff finds this commitment acceptable and will request that Region III personnel verify the. installation of these screens.

NUREG-0828,'Se'ction 5.3.6.2 also requests that Consumers Power Company evaluate alternatives and implement an optimum ventilation valve surveillance testing program to demonstrate valve operability and gross leakage integrity. The staff's risk analysis (NUREG-0828, Appendix D) showed that an increase in

. ventilation valve surveil. lance test frequency from every 18 months to every 6-months would reduce significantly the potential for offsite radiation exposure due to a postulated accident with failure of the isolation valves to close.

However, your February 12, 1985 submittal states that current Big Rock Point Technical Specification 3.7(a) already requires ventilation valve surveillance testing at 6-month intervals. The staff concludes that this 6-month testing interval is adequate; thus, NUREG-0828 Section 5.3.6.2 (Living Schedule Item 63)-

is resolved.

Sincerely, Original signed by:

John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing cc: See next page ORB #5:D DL IAP D IAPB:D C:0 DL CJamerso RDudley EMcKenna CGrimes JZwolinski f/p/85 5/2!/85 5 A 2/85 5gyB5 g /g 85 8505290426 050524 DR ADOCK 0500 5 g Es-af yo

j;

. DE Mr.. David J. VandeWalle Big Rock Point Plant Consumers Power Company cc Mr. Thomas A. McNish, Secretary Consumers Power Ccmpany 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 217 West Michigan Avenue Jackson, Michigan 49201 Big Rock Point Plant ATTN: Mr. Dave Hoffman Plant Superintendent Charlevoix, Michigan 49720 Mr. I. Lee Moerland Chairman,. Board of Commissioners P. O. Box 218. -

Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 49813 Regional Administrator *

. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn,xIllinois 60137 . _ , .

Nuclear Facilities and Environmental

. Monitoring Section Office Division of Radiological Health P. O. Box 30035 -

Lansing, Michigan 48909 Resident Inspector Big Rock Point Plant c/o U.S. NRC RR #3, Box 600 Charlevoix, Michigan 49720 U.S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN: Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604