|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error 05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER1999-07-12012 July 1999 Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20209D9781999-07-0808 July 1999 Forwards Addl Info to Support EA of Proposed 990212 License Application ECR 98-01675,correcting Minor Administrative Errors in TS Figure Showing Site & Exclusion Areas Boundaries & Two TS SRs ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209C1201999-06-30030 June 1999 Informs of Util Intent to Request Renewed License for PBAPS, Units 2 & 3,IAW 10CFR54.Licensee Anticipates That License Renewal Application Will Be Submitted in Second Half of 2001 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7171990-09-18018 September 1990 Comments on SALP Board Repts 50-277/89-99 & 50-278/89-99. Author Pledges Continued Mgt Support of & Attention to Rate of Improvement,Achievement of Goals & Performance of Routine Activities ML20065D4421990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Proposed Schedules for Operator Licensing Exams, Requalification Exams & Generic Fundamental Exams Encl ML20059K3671990-09-14014 September 1990 Informs of Revised Commitments Re Crud Induced Localized Corrosion Related to Fuel Cladding Failures.Deep Bed Demineralizers Installation Activities Will Be Performed in Unit 1 Subsequent to Third Refueling Outage ML20064A7751990-09-13013 September 1990 Advises That Ba Stambauth No Longer Maintains Need to Hold Senior Operator License ML20065D3741990-09-11011 September 1990 Forwards Rev to Relief Request 10-VRR-2 Re RHR stay-fill Supply Check Valves,Per ML20064A5831990-09-0707 September 1990 Responds to Violations Noted in Insp Repts 50-352/90-17 & 50-353/90-16 Re Differential Pressure for Pumps.Corrective Actions:Licensee Will No Longer Use Expanded Ranges as Acceptance Criteria for Inservice Testing Program Tests ML20059F0541990-08-31031 August 1990 Responds to NRC Re Violations Noted in Safety Insp Repts 50-277/90-13 & 50-278/90-13.Corrective Actions: Training Will Be Provided for Personnel Re Requirements of Drawing E1317 & Administrative Procedures A-2 & A-6 ML20064A4821990-08-31031 August 1990 Forwards Rev 20 to Emergency Plan.Changes Necessitated by Annual Emergency Plan Update & Administrative in Nature ML20059E6071990-08-29029 August 1990 Forwards Semiannual Effluent Release Rept,Jan-June 1990 & Rev 8 to Odcm ML20028G8181990-08-27027 August 1990 Forwards Peach Bottom Atomic Power Station Semiannual Effluent Release Rept,Jan-June 1990. No Revs Made to ODCM During Rept Period ML20059B0751990-08-24024 August 1990 Forwards Rev 0 to Updated FSAR for Limerick Generating Station,Units 1 & 2,Vols 1-19.W/one Oversize Encl. Proprietary Vol 7A (App 3B) Withheld (Ref 10CFR2.790) ML20059E9861990-08-24024 August 1990 Provides Justification for Applicability of Reload Methodology Topical Repts to Facility & Requests NRC Approval for Application of Reload Analysis Methodologies ML20064A6471990-08-24024 August 1990 Forwards Public Version of Revised Epips,Consisting of Rev 10 to EP-101,Rev 2 to EP-112,Rev 13 to EP-208,Rev 11 to EP-230 & Rev 22 to EP-291 ML20059A6461990-08-15015 August 1990 Responds to Violation Noted in Insp Repts 50-277/90-200, 50-278/90-200,50-277/90-06 & 50-278/90-06 & Payment of Civil Penalty in Amount of $75,000.Corrective Actions:Emergency Svc Water Sys Restored to Operable Status ML20058N9591990-08-13013 August 1990 Forwards Revised Response to Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-13.Corrective Actions:Ltr Issued to All Plant Personnel Providing Instructions on Proper Use & Handling of Controlled Documents in Controlled Locations ML20058N1771990-08-10010 August 1990 Responds to NRC Re Unresolved Items Noted in Insp Repts 50-352/90-80 & 50-353/90-80.Plant-specific Technical Guideline Has Been Revised to Ref Contingency Numbers Rather than Transient Response Implementation Plan Procedures ML20063P9461990-08-10010 August 1990 Provides Plans for Ultimate Disposition of Recirculation Inlet Nozzle to Safe End Weld Indication.Alternative Corrective Actions to Disposition Nozzle to Safe End Weld Indication Include Repair by Weld Overlay W/O Monitoring ML20058N1991990-08-0909 August 1990 Advises of Change of Address for Correspondence Re Util Operations.All Incoming Correspondence Must Be Directed to One of Listed Addresses ML20058N1281990-08-0909 August 1990 Forwards Correction to Rev 10 to EPIP EP-234, Obtaining Containment Gas Samples from Containment Leak Detector During Emergencies ML20058P1261990-08-0909 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Limerick Units 1 & 2 & Rev 1 to June 1990 Rept ML20058M9951990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-352/90-15 & 50-353/90-14.Corrective Actions:Personnel Counseled on Importance of Procedure Compliance & Operations Manual Revised ML20058Q4051990-08-0606 August 1990 Forwards Public Version of Revised Emergency Response Procedures,Including Rev 12 to ERP-140,App 2,Rev 13 to ERP-140,App 3,Rev 4 to ERP-230,Rev 3 to ERP-305 & Rev 3 to ERP-660 ML20058M6631990-08-0303 August 1990 Responds to NRC 890406 Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81.Based on Encl Schedule,Overall Projected Implementation Date Will Be 901119 ML20056A9611990-08-0303 August 1990 Notifies That Be Saxman Terminated Employment & Operating Responsibilities W/Util on 900706 ML20081E1581990-07-30030 July 1990 Forwards List of 1990 QA Program Changes for Plant.List Identifies Page & Paragraph Number,Brief Description & Type of Change ML20056A0421990-07-27027 July 1990 Forwards Updated Human Resource Status Rept for Jan-Jul 1990 for Areas Identified in Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81 ML18095A3661990-07-26026 July 1990 Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations ML18095A3761990-07-26026 July 1990 Forwards Decommissioning Repts & Certification of Financial Assurance for Plants ML20055J0241990-07-26026 July 1990 Forwards Response to NRC Regulatory Effectiveness Review Rept for Plant.Response Withheld Per 10CFR73.21 ML20056A9731990-07-25025 July 1990 Forwards Facility Written Exam Comments for NRC Insp Repts 50-352/90-10 & 50-353/90-11.Written Exam for Reactor Operator & Senior Reactor Operator Considered Comprehensive & Thorough ML20055H8511990-07-24024 July 1990 Responds to NRC 900720 Request for Addl Info Re Util 900516 Request for Exemption from Full Participation During 1990 Onsite/Offsite Emergency Exercise.Nrc Region I & FEMA Support Feb 1991 Exercise,Per 900718 Telcon ML18095A3721990-07-24024 July 1990 Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 ML20055H8331990-07-20020 July 1990 Submits Change of Addresses for Correspondence Re Util Nuclear Operations ML20044B2621990-07-12012 July 1990 Forwards Annual Progress Rept on Implementation of Control Room Enhancements,Per NUREG-0737.Corrective Actions for All Priority 1 Human Engineering Discrepancies Completed for Unit.Remaining Priority 2 Discrepancies Under Reevaluation ML20055H0231990-07-12012 July 1990 Forwards Public Version of Revised Epips,Including Rev 10 to EP-210,Rev 19 to EP-231 & Rev 13 to EP-237 ML20055G5481990-07-11011 July 1990 Forwards Public Version of Revised Epips,Including Rev 12 to ERP-140,App 3 & Revs 3 to ERP-310 & ERP-317 ML20044A1041990-06-22022 June 1990 Forwards Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Requests 90-03-0 & 90-04-0, Revising Surveillance Requirement 4.9.6.1 for Section 3.9.6 Refueling Platform Re Main Hoists/Auxiliary Hoists ML20043H7041990-06-21021 June 1990 Forwards Endorsements 143-146 to Nelia Policy NF-140 & Endorsements 93-96 to Maelu Policy MF-67 ML20044A2961990-06-21021 June 1990 Submits Revised Response to NRC Bulletin 89-002 Re safety- Related Swing Check Valves to Be Installed on Emergency Diesel Generator.Bolts Will Not Be Replaced Because Valves W/Original Internal Bolts Meet Requirements of Bulletin ML20043J0371990-06-20020 June 1990 Forwards Description,Scope,Objectives for Plant 1990 Annual Emergency Exercise Scheduled for 900920,per 890809 Ltr.Util Will Submit Revised Objectives for Exercise to Reflect Limited Participation,If Exemption Request Approved ML20043H6081990-06-19019 June 1990 Corrects 900427 Response to Generic Ltr 87-07, Info Transmittal of Final Rulemaking for Revs to Operator Licensing - 10CFR55 & Conforming Amends. ML20055C7621990-06-18018 June 1990 Informs NRC of Plans Re Licensing of Senior Reactor Operators (Sros) Limited to Fuel Handling at Plants.Util in Process of Implementing New Program for Establishment & Maint of Licensed SROs Limited to Fuel Handling at Plants ML20055C7471990-06-15015 June 1990 Requests That Listed Operator Licenses Be Discontinued ML20043G1331990-06-14014 June 1990 Responds to NRC 900614 Ltr Re Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-12.Corrective Actions:Boxes of Completed Procedures Improperly Stored Shipped to Util Storage Vault by 900406 ML20043G8131990-06-13013 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-277/90-06 & 50-278/90-06.Corrective Actions:Surveillance Test 6.16, Motor Driven Fire Pump Operability Test, Will Be Revised ML20043G9981990-06-12012 June 1990 Forwards, Core Operating Limits Rept for Unit 1 Reload 2, Cycle 3 & Core Operating Limits Rept for Unit 2,Cycle 1. Repts Submitted in Support of Tech Spec Change Request 89-13 Re Parameter Limits,Per Generic Ltr 88-16 ML20043H0111990-06-12012 June 1990 Advises That AR Wargo Reassigned from Operating Shift Responsibilities & Will Be Resigning License,Effective on 900514 ML20043G7501990-06-0808 June 1990 Requests Withdrawal of 900516 Tech Spec Change Request 90-11-1 Re Extension of Snubber Visual Insp Period.Change No Longer Needed Since Unit Shutdown on 900605 & Visual Insp of Three Affected Snubbers Performed on 900607 ML20043G7311990-06-0808 June 1990 Provides Addl Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Welds Examined During Last Refueling Outage Addressed ML20043F8021990-06-0808 June 1990 Forwards Monthly Operating Repts for May 1990 for Limerick Units 1 & 2 & Revised Pages to Mar 1990 Rept for Unit 2 & Apr 1990 Rept for Units 1 & 2 1990-09-07
[Table view] |
Text
, . - . _ ._ , _ _ _ _ - ,_-
PHILADELPHIA ELECTRIC COMPANY
' 2301 MARKET STREET P.O. BOX 8699 PHIL ADELPHI A. PA 19101 (as sl e41.sooi JOSEPH W. G Al.L A GH ER September _16, 1988 VIC E PRE SIDE NT avess a a ==avic==
Docket Nos. 50-277 50-278 50-352 50-353 ,
3 Mr. C. E. Rossi, Director I i U.S. Nuclear Regulatory Commission 1 Attn: Document Control Desk -
- Washington, DC 20555
Subject:
NRC Bulletin No. 88-08, dated June 22, 1988, "Thermal Stresses in Piping Connected to Reactor -
Coolant Systems", Peach Bottom Atomic Power Station.
i Units 2 and 3 and Limerick Generating Station i Units 1 and 2 '
4 Dear Mr. Rossi Philadelphia Electric Company's response to Bulletin 88-08, I l
"Thermal Stresses in Piping Connected to Reactor Coolant Systems" is ;
provided in the Attachment. This response is for Peach Bottom Atomic
' Power Station, Units 2 and 3, and Limerick Generating Station Units 1 and 2.
2 .
' If you have any questions or require additional information, j please do not hesitate to contact us. i l
Very truly yours, i i
l 4
Attachment '
I
- cc: Addressee j
W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, USNRC Senior Resident Inspector j '
T. E. Magette, State of Maryland
- 1. T. J. Kenny, Limerick NRC Senior Resident Inspector
} J. Urban, Delmarva Power
! J. T. Boettger, Public Service Electric & Gas H. C. Schwemm, Atlantic Electric gl$
880921ogp2 880916 + i I gDR ADOCK 05000277 l-PDC
.o .
COMMONWEALTH OF PENNSYLVANIA :
- Ss.
COUNTY OF PIIILADELPHI A :
J. W. Gallagher, being first culy sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company, the Licensee herein; that he has read the foregoing response to NRC Bulletin 88-08 relative to Peach Bottom Atomic Power Station Units 2 and 3, and Limerick Generating Station Units 1 and 2, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best Of his knowledge, information and belief.
% h. 0Ao.M u
Vice President subscribed and sworn to before me this /[F day of September, 1988.
,k e.sU -
W /
Q w Notary Public WELANit M. CAMPANELEA Notary Public. PlniedeleNs, Pieledelphis Co.
Wy Comrmssion Empirte Fdrwy 12. IMJ I
l
' BulJetin 88-08 Attachment
, Page 1 of 4 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS INTRODUCTION:
Bulletin 88-06, "Thermal Stresses in Piping Connected to Reactor Coolant Systems", describes the propogation of a circumferential crack through the wall of an unisolable section of emergency core cooling system piping due to high-cycle thermal fatigue.
NRC Bulletin 88-08 directs licensees to review systems connected to the RCS to determine whether unisolable sections of piping could be subjected to stresses from temperature stratification or temperature oscillations. These conditions could be induced by cold water leaking into the RCS via leaking isolation valves.
Additionally, such a condition may not have been evaluated in the design analysis of the piping.
The appropriate system piping reviews have been conducted for both Peach Ecttom Atomic Power Station (PDAPS), and Limerick Generating Station (LGS). It has been determined that neither plant contains unisolable sections of RCS piping that can be subjected tc stresses of the type defined in the Bulletin. I A restatement of the required action and our response is stated below.
Required Action:
The Bulletin includes the following action that must be taken:
"Review systems connected to the Reactor Coolant Systems (RCS) to determine whether unisolable sections of piping connected to the RCS can be subjected to stresses from temperature stratification or temperature oscillations that could be induced by leaking valves and that were not evaluated in the design analysis of the piping. For those )
addressees who determine that there are no unisolable i sections of piping that can be subjected to such stresses, no additional actions are requested except for the report required below."
RESPONSEr PEACH BOTTOM AND LIMERICK Philadelphia Electric Company (PECo) has reviewed the potential for cold water to leak into the Reactor Coolant System (RCS) via the isolation valves at LGS and PBAPS, and has determined that the BWR designs of these stations do not contain any unisolable
ulletin 88-08 Attachment
, Page 2 of 4 sections of piping that are potentially. subject to thermal cycling fatigue from cold water leaks into the RCS during normal operation.
With the exception of the difference identified in the High Pressure Coolant Injection (HPCI) section of this response, the following discussions are applicable to both PBAPS and LGS.
During normal operation, the following systems contain relatively l colder water than the reactor coolant and are connected to, but l isolated from, the reactor coolant system via isolation valves:
1
\
High Pressure Coolant Injection The HPCI system is capable of injecting cold water into the RCS while it is at normal operating pressure, via the feedwater system at Peach Bottom, or the feedwater and core spray systems at Limerick; however, this can only occur when the HPCI system is operating, such as during system surveillance testing. Normally, the HPCI pump is not operating and the system is below RCS operating pressure.
Even if the isolation valves were to leak during high f pressure surveillance testing, the duration and frequency of the testing is insufficient to be a cause of thermal cycling fatigue stress to the RCS piping.
HPCI water leaking into the RCS via core spray at LGS would require leakage past multiple isolation valves and at a sufficient rate so that the relatively colder fluid would not be heated via heat conduction in the pipe. Leakage from HPCI l into the RCS via the feedwater system at PBAPS or LGS would not result in any thermal stresses in the unisolable portion of feedwater piping, as there would be considerable mixing with the feedwater.
t l Reactor Core Isolation Cooling l
l Like HPC1, Reactor Core Isolation Cooling (RCIC) at PBAPS and LGS is capable of injecting cold water into the RCS through
! leaking valves while it is at normal operating pressure via the feedwater system, but only when the RCIC system is in operation. The system is normally below RCS operating pressure, and it operates only during high pressure surveillance testing. As discussed for HPCI, any leakage into the feedwater system is not expected to result in thermal stresses due to the mixing effect with the feedwater.
'Bulletin 88-08 Attcchment Pego 3 of 4 Standby Liquid Control System While in operation during surveillance testing, the Standby Liquid Control System (SLCS) at PBAPS and LGS would have the capability to inject cold water into the RCS through the core spray injection line except for the squib valves that isolate the system and prevent leakage to the RCS. These are explosive-actuated valves and no leakage past them is possible. Inadvertent actuation of the SLCS and firing of the squib valves resulting in SLCS injection to the reactor would not contribute to thermal cycling fatigue.
Residual Heat Removal Leakage past the Residual Heat Removal (RHR) system injection valves into the RCS system could only occur when reacter pressure is below the shutoff head of the RHR pumps for PBAPS and LGS, and then only when the pumps are operating.
Normally, the RHR pumps are not in oper'ation while the '
Reactor is at operating pressure except for testing or when auxiliary cooling is required for the suppression pool. The Low Pressure Coolant Injection (LPCI) portion of the RCS piping is designed for the injection temperature transient that occurs when the RHR system is actuated and the injection valves open, with the reactor at low pressure.
Core Spray Like RHR, leakage past the Core Spray (CS) injection valves at PBAPS and LGS could only occur when the system is in operation and when reactor pressure is below the CS pump shutoff nead. Normally, the CS system is only in operation for testing purposes and otherwise is at a lower pressure than that of the RCS. The CS injection portion of the RCS piping is also designed for the injection temperature transient that occurs when the CS system is actuated and the injection valves open with the reactor at low pressure.
l'eedwa t e r The Feecuater (FW) system is normally in operation and continuously injects relatively cold water into the RCS system. The RCS piping is designed for this, and no abnormal temperature transients or stratification that could contribute to thermal cycling fatigue have been observed during normal FW operation.
~ ~
Bulletin 88-08 Attachment
, Page.4 of 4 Stayfill System The;PBAPS and LGS stayfill system employs condensate jockey pumps to keep the ECCS systems filled with relatively cold water to alleviate the effects of water hammer upon ECCS actuation. However, the jockey pumps' shutoff head is considerably Scicw normal operating RCS pressure and is insufficient to cause' water to be injected into the RCS through any leaking isolation valves.
Since the BWR designs of LGS and PB do not contain any normally isolated cold water systems connected to the RCS that are continuously pressurized to a level above the RCS normal operating pressure, it is not possible for any potentially leaking isolation valves to allow cold water to be injected into the RCS and cause thermal cycling fatigue in unisolable RCS piping.
CONCLUSION:
As explained in the analyses presented above, neither LGS nor PB contain unisclable sections of RCS piping that can be subjected to stresses of the type defined in the Bulletin. Therefore, in accordance with action il of Bulletin No. 88-08, no further actions are necessary except for the required report. The transmittal of this report fulfills the requirements of this Bulletin.
___