ML20081E158
| ML20081E158 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/30/1990 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9008060240 | |
| Download: ML20081E158 (4) | |
Text
I 10 CPR'50.71, 50.54(a)(3) l PHILADELPHIA ELECTRIC COMPANY.
NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.
WAYNE. PA 19087 5691 (sisi sso sooo July 30, 1990 Docket Nos.
50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear-Regulatory Commission Attn: Document Control Desk Washington, DC 20555 j
SUBJECT -Quality Assurance Program Changes for Peach Bottom Atomic Power Station
REFERENCE:
Letter from D. M. Smith, PEco, to USNRC dated July.20, 1990 Dear Sirs On July 20, 1990, in accordance with 10 CPR Section 50.71, Philadelphia Electric Company filed revision 8 of the Peach Bottom Atomic Power Station Updated Final Safety Analysis Report (UPSAR).
The annual update of the Quality Assurance (QA) Program description, in accordance with 10 CPR Section 50.54(a)(3), was included in revision 8 of the UFSAR.
Changes to the QA Program description were indicated by vertical bars in the left hand margin.
The submittal' provided certification that the changes to the QA Program-description did not reduce the commitments in the previously NRC
. accepted program description.
To aid in your review of the revised QALProgram-description infthe UPSAR, Appendix D.ll, Section 17.2, we-have enclosed a. list of changes.
This list identifies the following for each change 1)-
page number, 2) paragraph number, 3) brief description,;and 4) type of change.
- 008060240 900730 PDR ADOCK 05000277 P
FDC q
$0
D6cumsnt Control Dask July 30, 1990 Odality Accurenco Progrcm Chongos Page 2 for Peach Bottom Atomic Power Station If you have any questions or comments on these changes, please contact Mr. W. J. Anderson (215) 640-5646.
Very truly yours, h,
if <d 1
i G. A. Ilunger, Jr.
Manager-Licensing Nuclear Engineering and Services 1
Enclosure cc:
T. T. Martin, administrator, Region I, USNRC J. J. Lyash, USNRC Senior Residerit Inspector 1
vb l
l
=umwe r.wm--gye w
4 wrWg
+F-At---
y Tu
-= -
1
+
Page 1 of 2
)
PillLADELPill A ELECTRIC COMPANY J
1990 QA PkOGitAM CHANGES INCORPORATED INTO THE FBAPS OFSAR REVISION 8 i
PAGE PARACHAPH DESCR.1PTION OF CHANGE CLASSIFICATION
-NUMBEft NUMBER OF CHANGE D.11-1 17.2.1 Changed " fourteen" vice presidents Organizational to " twelve" Changed " Personnel and Industrial Organizational helations" to " Human kesources" D.11-1 17.2.1.1 Hevised office of Chief Organizational Executive D.11-1 17.2.1.2 Deleted " Nuclear Construction" -
Organizational D.11-2 17.2.1.2.1 Para, number changed due Editorial to above deletion D.11-2 17.2.1.2.2-lievised para 6raph.
Was 17.2.1.2.3 organizational D.11-2 17.2.1.2 2.1 Changed " Maintenance Services Organization and Planning and Coordination" to Maintenance Support and Haintenanco Programs D.11-3 17.2.1.2.2.1.2 Changed name of-section Organizational Was paragraph 17.2.1.2.3.1.3 D.11-3 17.2.1.2.2.1.3 hevised paragraph.
Deleted Organizational NDE Services and responsibilities D.11-3 17.2.1.2.2.1.4 Changed " Planning and Coordination" Organizational to " Maintenance Support" D.11-4 17.2.1.2.2.4 Added description of Nuclear Organizational Information Resource Division D.11-5 17.2.1.2.2.5 Hovised paragraph.
Deleted Organizational three subparagraphs describing Sections now included in Nuclear s
information Resource Division D.11-5 17.2.1.2,2.6 Added paragraph describing Organizational the Licensing Section D.11-5 17.2.1.2.3 Was 17.2.1.2.4 Editorial D.11-6&7 17.2.1.2.3 (7&12)
Deleted " Quality control" Clarification D.11-9 17.2.1.2.3.1.2(2)
Deleted " housekeeping" Organizational D.11-10 17.2.1.2.3.1.4 Revised paragraph' Editorial D.11-11 17.2.1.2.3.4 Deleted " Procedure" section, Organizational added "NDE" section D.11-12 17.2.1.2 3 4.1 Deleted " Procedure Section" Organizational Added " Nuclear Fuel QA-Program" to Quality EngineciIng Sectton D.11-12 17.2.1.2.3.4.2 Deleted responsibility for Nuclear Organizational-Fuel QA Program from Audit Section Was 17.2.1.2.4.4.3 D.11 12 17.2.1.2.3.4.3 Added new paragraph Organizational D.11-13 17.2.1.2.3.4.4 Revised paragraph Clarification-Was 17.2.1.2.4.4.4 D.11-13 17.2.1.2.4 Revised paragraph Organizational D.11-15 17.2.1.3.1.1 Revised paragraph Organizational D-11-15 17.2.1.3.1.1.1 Changed " Superintendent, Organizational Fossil / Hydro Generation Division" to "Hanager, Services Division"
. - ~,
e Page 2 of 2 l
PHILADELPHIA ELECTRIC COMPANY 1990 QA PROGRAM CHANGES INC0ftPORA7ED INTO THE PBAPS UFSAR REVISION 8 i
PACE PAHAGitAPH PESCRIPTION OF CHANGE CLASSIFICATION NtjMBEk NUMBEft OF CHANGE D.11 16 17.2.1.3.1.1.2 Same as noove Organizational D.11-17 17.2.1.4 Changed "Pe.'sonnel and Industrial Organizational Industrial helations" to " Human kesources." Revised paragraph D.11-17 17.2.1.4.1 Changed " Industrial fielations" Organizational 4
To " Employee Services" D.11-17 17 2.1.4.1.1.1 Same as above Organizational D.11-18 17.2.1.4.2 Changed " Purchasing and Editorial General Servicco" to "Information Systems and General Services" D.11-19 17.2.1.5 Added " Senior Vice President" Organizational and Cencral Council.
D.11-21 17.2.2.1.3 Added new paragraph
" Enhancement D.11-24 17.2.2.14 Added " managing"
- Enhancement D.11-25 17.2.3.2 Added " performance requirements
" Enhancement between " design bases" and
" regulatory requirermnts" D 11-25 17.2.3.2.1 Nu Paragraph 8 Enhancement D.11-26 17.2 3.2.2 New Paragraph
- Enhancement D.11-26 17.2.3.2.3 Was 17.2.3.2.1 Editorial D.11-30 17.2.4.8 Deleted "QD" items Clarification D.11-30 17.2.5.2 Changed "hcid points and Clarification and witness points to " verification points" D.11-37 17.2.9.1.2 hevised paragraph Clarification D.11-38 17.2.10.2.1 Change " hold points or Clarification inspection points" to " inspection /
verification points" D.11-39 17.2.10.5.1 Revised paragraph Clarification D 11-40 17.2.10.7 Added new paragraph
- Enhancement D.11-41 17.2.11.7.1 Added new paragraph
- Enhancement D.11-41 17.2.11.7.2 Was 17.2.11.7.1 Editorial D.11-46 17.2.15.1.4 New paragraph
- Enhancement D.11-46 17.2.15.1.5 Was 17.2.15.1.4 Editorial D.11-52 17.2.18.13 Added new paragraph Commitment to NRC D.II-54 17,2A.3.b Changed " Stores Diviolon" Organizational to " Plant Staff" D.11-60 17.2A.17 Changed various exceptions Compliance to " comply" Changes classified as enhancements are the adoption of NCA-1-1986 standards which have been evaluated and can reasonably be considered as enhancements to the PBAPS QA program. The evaluation was undertaken in accordance with a 1989 agreement between Phliadelphia Electric Company and the Commonwealth of Pennsylvania.
.