ML20044B262
| ML20044B262 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/12/1990 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 9007180237 | |
| Download: ML20044B262 (10) | |
Text
77 I
.NUREG 0737-
':D
,2 j
PHILADELPHI A ELECTRIC COM PANY-l NUCLEAR ' GROUP HEADQUARTERS -
955 65 CHESTERBROOK BLVD, WAYNE, PA 19087 5691 l'
(mis) ado sooo
=1 4
July 12, 1990 Docket No. 50-277 U.S.. Nuclear Regulatory Commission Attn Document' Control Desk 4
L iWashington, DC 20555 q
SUBJECT l Annual' Progress Report for Implementation of Control Room Enhancements Pursuant to NUREG-0737 i
Peach Bottom Atomic Power Station, Unit 2
REFERENCE:
- 1) Letter,.S. L. Daltroff, PEco, to D. R. Muller, USNRC, dated February 26, 1986;
Subject:
Control Room Design Review
- 2) Letter, E. P. Fogarty, PECo to USNRC dated June 30, 1989 i
In.the' reference-1 letter,..which transmitted the' Control
' Room Design Review (CRDR) Report, we stated that a progress' report Lonithe, implementation of the control room' enhancements.would be
. submitted to the-NRC within two months following completion of the inext: refueling outage for Peach Bottom Units 2 andL3 and. annually L
thereafter.
Reference 2 letter provided the status of the control l-'
. room enhancements as of the end of the 7th' refueling outage for Unit H
- 2. 'This' letter submits.the annual progress report for Peach Bottom Unitn2.
/,
The two week delay in submitting this report was discussed-with the NRC Project Manager on June 29 1990.
We are currently taking measures to ensure timely submittal of future progress reports.
lt t
c i
9007180237 900712 k g\\ t ll,
DR ADOCK 0500 7
lLs :
N L'
. Document C ntrol Deck July 12, 1990 Page 2
-In the'CRDR Report, 262 Human Engineering Discrepancies
.(HEDs).were identified.
Each HED was assigned a priority with respect to safety using a significance _ scale of 1 to 6.
_Three (3)
HEDs were assigned dual priorities.
The HED' priority _ categories and-numbers of HEDs assigned to each were:
u L
Priority Number of Unit 2 HEDs Identified Resolved 1
High Safety Significance 10-10 2
-Low Safety Significance 44 38 i
3 Operational Reliability 26' 16 L
4
.No Significant Improvement 94 74 5
-Previously Corrected 52 NA l
6 Not A Discrepancy 39 NA i
The subject, schedule, and status of each identified Priority 1 and 2 HEDs are provided in Tables 1 and 2 of Attachment 1 i
- to this letter.
The status is presented as the actual outage or date-the HED was resolved or the forecasted (F) date when the HED i
will be resolved.
In summary, the corrective actions for all the
>j Priority 1 HEDs have been completed for Unit 2.
The corrective i
actions for.38 Priority 2 HEDs have been completed.
The tcmaining 6 i
L Priority 2 HEDs, DS-09, TAl-01, TAl-06,'TAl-16, SPl-02, and VW-12 0
and their implementation schedules.are being re-evaluated in conjunction with the unresolved Unit 3 UEDs.
The revised forecast i
for implementation _of the remaining Unit 2 Priority 2 HED
]
- resolutions will be provided with the Unit 3 annual progress report 1
in February, 1991.
In addition to resolving-the last Priority 1 HED (El-02),
j the corrective actions for three' Priority 4 HEDs (Al-01, D3-02,'and j
15-01) were completed.
The Priority 3 and 4 HEDs resolved to date J
-are listed'in Table'3 of Attachment 1.
l If_you have any questions regarding this progress report,
- please-doLnot hesitate to. contact us.
Very truly yours,
)
G. A.
Hunger, Jr.
Manager-Licensing Section 1
Nuclear Engineering & Services Attachment cc:
J. J. Lyash, USNRC Senior Resident Inspector T. Martin, Administrator, Region I, USNRC t
t
i <
m..
W 1
1
- .t.
]
3 1
f
.}
i
. I ' i.
s ATTACHMENT 1 sj i
i.
p Schedule and Status of c,.'~
Human Engineering DiscrepanciesL(HED).
u~
g_ v.
. Table;.1'- Priority 1~HEDs L
Table'2 - Priority 2 HEDs-f Table Priority 3 and 4 HEDs 1
i' d:
lI
((l{
't j:
i.
l g
l
- l. '
r,
[*-
l)b l
+
at:
j1i k
.l F-
!} '
r L
e
~ '
TIRI 14RIIRITY 1 IElk ED Priority-Schedule Actual / Forecast-' B EV -
A14 Annunciator Silence Centrol PRI1 7th Refuel 7thRefuel D245.NisicFlowDirection PRI1 8thRefuel 7thRefuel D343 - Cosponent String and PRI 1 8th Refuel 7thRefuel
'I Matrix Arrangesent El-42 P. A. Systes Access PRI 1 8th Refuel Nid1909 1341 Recorder Values PRI1 8th Refuel 7thRefuel 7
13-05 Nultipsint Recorder Speed PRIB11 8th Refuel 7thRefuel 5: Replace Recorder THE-2-349 l
SD243' Containsent Isolation PRI1 8th Refuel 7thRefuel
+
Misie Arrangesent 803-23 ~ Control / Display Relationships PRI 1 7th Refuel 7thRefuel TA144 ' Isolation Sussary Display PRI1 8th Refuel.
7th Refuel.
TA147 Reacter Level - 172 inches PRI All 7thRefuel-7thAsfuel Yes As Add Caution Tag l,
L o
i i
4 e
.Pcgo 1 of 2 l
T E E t - pt! W TY 2 M Ds B
-Priority Schedule Retual/ Forecast: E E Al-12.
'Alare Clear
See TA B s 7th Refuel 05-42 HierarchalLabeling PRI 2.
4thRefuel-7thRefuel f
D54 Redundant Label Inforsation PRI 2 8thRefuel 7th Refuel 3
L
. D549 IncompleteLabels PRI 2 2 ICTE 1 d
1241 Indicator Zone Markings PRI 2 See TA B 7th Refuel 1343 Recorder Alars Points, PRI 2 See TA B 7th Refuel j
t="
1347 RecorderPenColors PRI 2 4thRefuel 7th Refuel 13-11 Recorder Zone Markings PRI2 See TA E 7th Refuel 15-45 Inadvertent Control PRI 2 8th Refuel 7th Refuel l
Activation
{
l-P441 Feedback to operator PRI 2 Dec1987' 7th Refuel SD3-14 E l Indications PRI2 8th Refuel 7th Refuel SD3-18 ControlGrouping PRI2 8th Refuel 7th Refuel S03-19 CentrolGrouping PRI 2 8thRefuel
.7th Refuel 803-21 IHRIndicatorArrangesents PRI 2 8th Refuel 7thRefuel
\\,
.SD3-28 Reactor Mode Switch Location PRI2 8thRefuel 7th Refuel-Spl-42 ProcedureTersinologyUpdate PRI 2 2 NOTE 1 NRC2-!! Torus Level Zone Marking PRI 2 Cosplete 7th Refuel l
NRC2-12 Reactor Level Accuracy PRI 2 Complete 7th Refuel LER4 Diesel Generator Restart PRI 2 8th Refuel 7th Refuel Procedural Requiresent LER-48 Valve Alignsent Procedural PRI 2 8thRefuel 7th Refuel Requiresents LER-14 Reactor Yessel Heat-up Rate PRI 2 8th Refuel 7th Refuel LER-18
!sproper Switch Position
- PRI 2 7th Refuel 7th Refuel
_ _. _ _ _ _ _ _ _ _. _.... _. _ _ _ _ _ _ ~
Pcgp~2'of'2.
l m n T M.E 2 - PRIR ITY 2 m s l
2
' Priority Schedule Actual / Forecast E LEV -
LER-19 leproper Valve Operation PRI2 8th Refuel 7th Refuel TAl-41. Reactor Cooldoen Rate PRI2 With Ceeptter June,1992(F)
Ned 9551 TAl 42. Reactor Level - 48 inches PRI2 sth Refuel 7th Refuel TA145 E l-Initiation Signal PRI2 8th Refuel 7th Refuel Yes TA14 LPCI Flea Resolution PRI2 SEE M)TE 1 TAl-87 ReactorLevel-172 inches PRI 8 2 8th Refuel ithRefuel Yes B:2eneMarkScales L
TA14 E l 4 RCIC Nanual Initiation PRI2 8th Refuel 7th Refuel TA149 CS Manual initiation PRI2 8th Refuel 7th Refuel y
L' f
TAl-18 ~LPCI Manul initiation, PR!2 8th Refuel 7th Refuel TAl-11 AD6 Tiser Reset PRI2 8th Cefuel 7th Refuel TAl-16 S*" Instrueent N2 Alare PRI2 CCE NOTE 1 j
a
- TAl-17 TuRUS Level Range
"! 2 8thRefuel 7th Reful
]
TAl-28 TORUS Level 18.5 fut PRI2 8th Refuel 7thRefuel TA1-21 TORUS Air Space Teeperature PRI 2 8th Refuel 7th Refuel-Yes TRl-22 TORUS Pressure Range PRI2 8th Refuel 7th Refuel YW-81 ADS Nuebers PRI2 8thRefuel-7thRefuel YW44.OrificetypassYalveTag PRI 2 8th Refuel 7thRefuel YW4 Torus Pressure Instrueent No.
PRI 2 8th Refuel 7th Refuel YW-11 ECCS Instrueent Color Pads PRI 2 8th Refuel 7th Refuel i
YW-12 T-288 Series Nosenclature PRI 2 CCE NOTE 1 YW-15 T-221 Yalves Not Found PRI 2 8th Refuel 7th Refuel K)TE 1: The subject E is being reevaluated with respect to its
' resolution and forcasted schedule for cospletion. PEco will provide an updated status of this E (as it relates to P8APS Unit 2) as part of, cur next annual progress report to be subsitted for P8APS Unit 3 in February 1991.
-+mt r-9
[-i) c.
PCge 1 cf 4 j
(i TABLE 3 - COMPLETED PRIORITY i
3 AND 4 HEDs HED PRIORITY j
j Al-01 Annunciator Color / Location coding 4
Al-03 Annunicator Type Stylo 4
Al-06 Multi-Choice Alarms 4
1 l
Al-07 Annunciator Priority Coding 4
I Al-08 Annunciator Identification 4
1 Al-10 Annunciator control Arranger.cnt 3
J D1-02 Consolo control Reach Dist 4
i D1-04 Mirror Imaging of Pancis 4
L Di-05 Uncovered Panel Holes 4
l
~
l
\\
D2-01 Control Distinction 4
D2-02 Demarcation and Mimic Lines 3
]
E l
D2-03 Demarcation Lines Contrast 4
j 1
l-D2-04 Mimic Flowpaths
'3 l
L t.-06 Mimic consistency 4
D3 Control / Display Grouping 4
D3-02 Component Arrangement 4
.D3-04 color coding Consistency 3
J l
D3 Control Display Height 4
D4-01 Color Standards 4
L D5-03 Panel Identification 4
j D5-05 Label Type and Style 4
i i
D7-01.
Control Panel Access 4
j l
D7-03 Movable Obstructions 4
i D7-04 Low Control / Display Visibility 4
j I
i 1
I Pag] 2 cf 4
.v.
TABLE 3 - COMPLETED PRIORITY 3 AND 4 HEDs
- HED PRIORITY r
D7-06' Annunciator Location 4
f E3-02 Protective Clothing 4
E4-02 Telephone Cords 4
f 11 Controller Height Low 4
12-03 Scale Units 4
I2-04
' Pointers Obscure Markings 4
l I2-06A Display Grouping 3
12-08 Excessive Scalo Graduations 4
13-08 Recorder Marking Procedurc 4
I I5-01 Control Sequence 4
15-02 Position Indication Labels 3
15-03' Position Markings 3
15-04 Control Height 4
15-06 Label & Indicator Visibility 4
15-07 Control shapo Coding 4
3 15-08' Label & Pointer Visibility 4
15-09 Emerg Control Identification 4
. ?
Pl-04 Annunciator Responso Card Identification 4
.SDl-01 Opposing Surfaces close 4
SD2-02 Containment Purgo Mimic Arrangement 3
t
~SD3-01 Control / Display Grouping 3
SD3-03 Air. Ejector Indications 4
SD3-04 Air Ejector Controls 4
SD3-05' Air Ejector Controls 3
SD3-06 Condensate Panel Control Grouping 4
w r -.
m s
i Pag] 3 ef 4
. e -.
o.
e>
\\
TABLE 3 - COMPLETED PRIORITY 3 AND 4 HEDs HED PRIORITT SD3-08 Turbine Drain Controls 4
'SD3-09 Drain Tank Dump Indications.
4 SD3-10 Drain Tank Drains 4
SD3-11 Rocirc Indications Not Grouped 4
SD3-12 CRD Indications 4
SD3-13 HPCI Controls 4
SD3-15 Controls Arrangement 4
SD3-16 Display Arrangement 3
SD3-17 Display Arrangement 3
l l
SD3-20 Containment Ventilation Cotrol Arrangement 4
SD3-22 Drywell Pressure Indicator Arrangement 4
SD3-25 Indicator Arrangement 3
SD3-26 Control.orouping 4
'SD3-27 Control Color coding 4
SD4-01 Label Location 4
SD5-02 Control Position Escutcheons 3
SIl-01 High Modulo Location / Readability 4
SI2-01 Recorder Location Low-4 SI2-05 Selector Light Color 4
SI3-01 Recorder Pen Colors 4
SP1-01 Remote Shutdown Panel Proceduros 4
ST1-01 Training Update on Enhancements 3
NRC2-01 Torus Recorder Scales 4
NRC2-02 Extra Scale on Chart 4
.NRC2 Label Scrminology 4
P g] 4 Cf 4 J*
e g
d TABLE 3 - COMPLETED PRIORITY 3 AND 4 HEDs HED PRIORITT NRC2-05 Scale Increments Too Large 3
TAl-25 Reactor Pressurc 330 PSIG 4
TAl-27 Reactor Pressure 150 PSIG 4
TAl-28 Reactor Torus Delta P 4
TAl-30 Procedural Reference 4
L TAl-31 Procedural Reference 4
TAl Generator Load 5%
4 TAl-33 Coro Map Green Light 4
LVW-03 Turbino Speed Label 4
VW-07 Torus instrument-Color Pads 4
VW-09 HPCI Turbine PB Color 4
VW-10 Location of Rx Instruments 4
~VW-13 T-200 Series Information 4
VW-14.
T-200 Step Not Cicar 4
l 2
9 i