Responds to NRC 890406 Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81.Based on Encl Schedule,Overall Projected Implementation Date Will Be 901119
ML20058M663
Person / Time
Site: Peach Bottom  
Issue date: 08/03/1990
From: Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008100263
Download: ML20058M663 (2)


Text

.-.. ~.

?: -

t O *'CCN 90-14142 7

% - 4.l --. '

A V.

f'.

j?>

PHILADELPHIA ELECTRIC COMPANY PEACil BOTIOM ATOMIC POWI:R STATION R. D.1, llox 208 -

, ;-J

- Delta, Pennsylvania 17314 h

PSEtt 50rroes. net MMS of excmavs 1 (717)456-7014 D. B. Miller, Jr.

vice Freeni.

l

_ August 3, 1990 I

Docket Nos. 50-277 "i

50-278

)

U.-S.-Nuclear Regulatory Commission ATTN:. Document Control Desk 9

- Washington, DC 20555-i i

L

SUBJECT:

Peach Bottom Atomic Power Station - Units 2 & 3 Response to NRC Integrated Assessment. Team Inspection Report

'(50-277/89-81,-50-278/89-81)- Dated April 6, 1989

REFERENCE:

Letter from D. M.' Smith to USHRC dated August 18, 1989

Dear Sir:

'In the subject letter dated April 6, 1989,. Philadelphia Electric Company; (PECo)' committed to revising the PBAPS Emergency Operating Procedures (EOPs).-

1

-In the referenced letter dated August 18 1989,'PECo provided a projected date of July'30, 1990 for'the implementation of revision 4-to the E0Ps.

Due to the-

~

extensive 3 review cycle ~which has been adopted to ensure the. adequacy and

l operator useability.for each E0P revision, it has been determined that the L

original projected implementation date cannot be met'.

q A revised schedule which reflects-both work completed to date, as well as the; steps remaining for implementation of Rev 4 of the E0Ps is attached.

L ased on this schedule, the overall' projected implementation date is November B

i 119, 1990.

1 Sincerely,

[ib L

cc:

R. A. Burricelli, Public Service Electric & Gas T.',M.'Gerusky, Commonwealth of Pennsylvania-J. J. Lyash, USNRC Senior Resident inspector

[

T. T._ Martin, Administrator, Region I, USNRC l

R; I. McLean, State of Maryland H. Ci Schwemm, Atlantic Electric u

L

.J.' Urban, Delmarva Power 8

9008100263 900803

' :ll PDR ADOCK 05000277 Q

PDC

l

I?_~

.n.-

PBAPS~ REVISED SCHEDULE FOR IMPLEMENTATION OF REVISION 4

[

OF THE BWROG EMERGENCY PROCEDURE GUIDELINES (EPGs) 4 8

12 16 20 24 28 32 36 40 44 48 52 56 60'64-68 PROGRAM COMPONENT pg g

g. ]

.g.

g.

p g.

I S

"i V&V UPGRADE E'""'

'I E

APP C CALC /NED ISSUES I

PSTG l

PSTG APP A M

i h

T-100s DRAFTS T-100s VALIDATION

~ ',

TRAINING T-100s PROCEDURE REVS nummmmmmmmmmme m

7 T-100s BASES m

'T 1G~0s TECTFVERTFFCATFOIT~

I num

._T-100s PSWG VE RIFICATION PSTG APP B T-200s VALIDATION T-200s DR AFTS f

T-200s TECH VERIFICATION EMEEEEEEEE T-200s PROCEDURE REVS EE"M" T-200s PSWG VERIFICATION

MEEEEE,
IEEE ASSOCIATED PROC. REVS pig R C i

MB P R ESTAG E i

mas i

l I

I I

I I

l-1 I

I I

I I

I I

.I O

4 :: 8. 12 16'20 24 28 32 36 40 44 48 52 56-60 64 68 i

-7/31/89 WEEKS' 11/19/90' NGAP: Nuclear Group Administrative Procedure 7/30/90 PSWG: Plant Specific Writer's Guide PSTG:

Plant Specific Technical Guidelines V&V : Verification and Validation

^