PHILADELPHIA ELECTRIC COMPANY PEACil BOTIOM ATOMIC POWI:R STATION R. D.1, llox 208 -
, ;-J
- Delta, Pennsylvania 17314 h
- PSEtt 50rroes. net MMS of excmavs 1 (717)456-7014 D. B. Miller, Jr.
vice Freeni.
l
_ August 3, 1990 I
Docket Nos. 50-277 "i
50-278
- )
U.-S.-Nuclear Regulatory Commission ATTN:. Document Control Desk 9
- Washington, DC 20555-i i
L
SUBJECT:
Peach Bottom Atomic Power Station - Units 2 & 3 Response to NRC Integrated Assessment. Team Inspection Report
'(50-277/89-81,-50-278/89-81)- Dated April 6, 1989
REFERENCE:
Letter from D. M.' Smith to USHRC dated August 18, 1989
Dear Sir:
'In the subject letter dated April 6, 1989,. Philadelphia Electric Company; (PECo)' committed to revising the PBAPS Emergency Operating Procedures (EOPs).-
1
-In the referenced letter dated August 18 1989,'PECo provided a projected date of July'30, 1990 for'the implementation of revision 4-to the E0Ps.
Due to the-
~
extensive 3 review cycle ~which has been adopted to ensure the. adequacy and
- l operator useability.for each E0P revision, it has been determined that the L
original projected implementation date cannot be met'.
q A revised schedule which reflects-both work completed to date, as well as the; steps remaining for implementation of Rev 4 of the E0Ps is attached.
L ased on this schedule, the overall' projected implementation date is November B
i 119, 1990.
1 Sincerely,
[ib L
cc:
R. A. Burricelli, Public Service Electric & Gas T.',M.'Gerusky, Commonwealth of Pennsylvania-J. J. Lyash, USNRC Senior Resident inspector
[
T. T._ Martin, Administrator, Region I, USNRC l
R; I. McLean, State of Maryland H. Ci Schwemm, Atlantic Electric u
L
.J.' Urban, Delmarva Power 8
9008100263 900803
' :ll PDR ADOCK 05000277 Q
- l
I?_~
.n.-
PBAPS~ REVISED SCHEDULE FOR IMPLEMENTATION OF REVISION 4
[
OF THE BWROG EMERGENCY PROCEDURE GUIDELINES (EPGs) 4 8
12 16 20 24 28 32 36 40 44 48 52 56 60'64-68 PROGRAM COMPONENT pg g
- g. ]
.g.
g.
p g.
I S
"i V&V UPGRADE E'""'
'I E
APP C CALC /NED ISSUES I
PSTG l
PSTG APP A M
i h
T-100s DRAFTS T-100s VALIDATION
~ ',
TRAINING T-100s PROCEDURE REVS nummmmmmmmmmme m
7 T-100s BASES m
'T 1G~0s TECTFVERTFFCATFOIT~
I num
._T-100s PSWG VE RIFICATION PSTG APP B T-200s VALIDATION T-200s DR AFTS f
T-200s TECH VERIFICATION EMEEEEEEEE T-200s PROCEDURE REVS EE"M" T-200s PSWG VERIFICATION
- MEEEEE,
- IEEE ASSOCIATED PROC. REVS pig R C i
MB P R ESTAG E i
mas i
l I
I I
I I
l-1 I
I I
I I
I I
.I O
4 :: 8. 12 16'20 24 28 32 36 40 44 48 52 56-60 64 68 i
-7/31/89 WEEKS' 11/19/90' NGAP: Nuclear Group Administrative Procedure 7/30/90 PSWG: Plant Specific Writer's Guide PSTG:
Plant Specific Technical Guidelines V&V : Verification and Validation
^