Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld ML20195G4591999-06-10010 June 1999 Forwards MORs for May 1999 & Revised Repts for Apr 1999 for LGS Units 1 & 2 ML20195H0531999-06-0909 June 1999 Forwards Revised Bases Pages B3/4 10-2 & B3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7701999-06-0707 June 1999 Provides Notification of Change to NPDES Permit PA0052221, for Bradshaw Reservoir Facility Which Supports Operation of Lgs,Units 1 & 2,per EPP Section 3.2 ML20195C7631999-06-0101 June 1999 Notifies NRC That PECO Energy Has Completed Installation of New Large Capacity,Passive Strainers on RHR & Core Spray Sys Pump Suction Lines at Lgs,Unit 2,in Response to Ieb 96-003 ML20195D5381999-05-26026 May 1999 Forwards 1998 Occupational Exposure Tabulation Rept for LGS Units 1 & 2. Encl Is Diskette & Instructions.Rept Is Being re-submitted to Reset 12 Month Time Period.Without Disk ML20195B2821999-05-24024 May 1999 Requests That NRC Distribution Lists for LGS Be Updated. Marked-up Distribution List Showing Changes Is Attached ML20196L2891999-05-20020 May 1999 Provides Status Update of Thermo-Lag 330-1 Fire Barrier Corrective Actions,Iaw Commitments Made in ML20195B2951999-05-20020 May 1999 Forwards Rev 0 to LGS Unit 2 Reload 5,Cycle 6 COLR, IAW TS Section 6.9.1.12.Values Listed Have Been Determined Using NRC-approved Methodology & Are Established Such That All Applicable Limits of Plants Safety Analysis Are Met 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv1999-05-19019 May 1999 Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 9904191999-05-18018 May 1999 Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 ML20206E2001999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept (Non- Radiological) for Limerick Generating Station,Units 1 & 2. Rept Submitted IAW Section 5.4.1 of App B of Fols,Epp (Non- Radiological) & Describes Implementation of EPP for 1998 ML20206D8801999-04-27027 April 1999 Forwards Rev 2 to LGS Unit 1 Reload 7,Cycle 8 COLR, IAW TS Section 6.9.1.12.COLR Provides cycle-specific Parameter Limits for Noted Info ML20206A5461999-04-21021 April 1999 Responds to Conference Call Between Util & NRC on 990420,re TS Change Request 98-07-2,revising TS Section 2.0 to Incorporate Revised MCPR Safety Limits.Attached Ltr Contains Info Requested ML20205T0441999-04-17017 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept 15, IAW TS Section 6.9.1.7.REMP for 1998,confirmed That LGS Environ Effects from Radioactive Release Were Well Below LGS TSs & Other Applicable Regulatory Limits ML20205Q7581999-04-15015 April 1999 Forwards Response to RAI Re ISI Program First & Second 10-Yr Interval Relief Requests.Revs to Identified by Vertical Bar in Right Margin 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K3671990-09-14014 September 1990 Informs of Revised Commitments Re Crud Induced Localized Corrosion Related to Fuel Cladding Failures.Deep Bed Demineralizers Installation Activities Will Be Performed in Unit 1 Subsequent to Third Refueling Outage ML20065D4421990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Proposed Schedules for Operator Licensing Exams, Requalification Exams & Generic Fundamental Exams Encl ML20064A5831990-09-0707 September 1990 Responds to Violations Noted in Insp Repts 50-352/90-17 & 50-353/90-16 Re Differential Pressure for Pumps.Corrective Actions:Licensee Will No Longer Use Expanded Ranges as Acceptance Criteria for Inservice Testing Program Tests ML20064A4821990-08-31031 August 1990 Forwards Rev 20 to Emergency Plan.Changes Necessitated by Annual Emergency Plan Update & Administrative in Nature ML20059E6071990-08-29029 August 1990 Forwards Semiannual Effluent Release Rept,Jan-June 1990 & Rev 8 to Odcm ML20059B0751990-08-24024 August 1990 Forwards Rev 0 to Updated FSAR for Limerick Generating Station,Units 1 & 2,Vols 1-19.W/one Oversize Encl. Proprietary Vol 7A (App 3B) Withheld (Ref 10CFR2.790) ML20064A6471990-08-24024 August 1990 Forwards Public Version of Revised Epips,Consisting of Rev 10 to EP-101,Rev 2 to EP-112,Rev 13 to EP-208,Rev 11 to EP-230 & Rev 22 to EP-291 ML20059E9861990-08-24024 August 1990 Provides Justification for Applicability of Reload Methodology Topical Repts to Facility & Requests NRC Approval for Application of Reload Analysis Methodologies ML20058N9591990-08-13013 August 1990 Forwards Revised Response to Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-13.Corrective Actions:Ltr Issued to All Plant Personnel Providing Instructions on Proper Use & Handling of Controlled Documents in Controlled Locations ML20058N1771990-08-10010 August 1990 Responds to NRC Re Unresolved Items Noted in Insp Repts 50-352/90-80 & 50-353/90-80.Plant-specific Technical Guideline Has Been Revised to Ref Contingency Numbers Rather than Transient Response Implementation Plan Procedures ML20063P9461990-08-10010 August 1990 Provides Plans for Ultimate Disposition of Recirculation Inlet Nozzle to Safe End Weld Indication.Alternative Corrective Actions to Disposition Nozzle to Safe End Weld Indication Include Repair by Weld Overlay W/O Monitoring ML20058N1281990-08-0909 August 1990 Forwards Correction to Rev 10 to EPIP EP-234, Obtaining Containment Gas Samples from Containment Leak Detector During Emergencies ML20058N1991990-08-0909 August 1990 Advises of Change of Address for Correspondence Re Util Operations.All Incoming Correspondence Must Be Directed to One of Listed Addresses ML20058P1261990-08-0909 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Limerick Units 1 & 2 & Rev 1 to June 1990 Rept ML20058M9951990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-352/90-15 & 50-353/90-14.Corrective Actions:Personnel Counseled on Importance of Procedure Compliance & Operations Manual Revised ML18095A3761990-07-26026 July 1990 Forwards Decommissioning Repts & Certification of Financial Assurance for Plants ML20055J0241990-07-26026 July 1990 Forwards Response to NRC Regulatory Effectiveness Review Rept for Plant.Response Withheld Per 10CFR73.21 ML20056A9731990-07-25025 July 1990 Forwards Facility Written Exam Comments for NRC Insp Repts 50-352/90-10 & 50-353/90-11.Written Exam for Reactor Operator & Senior Reactor Operator Considered Comprehensive & Thorough ML20055H8511990-07-24024 July 1990 Responds to NRC 900720 Request for Addl Info Re Util 900516 Request for Exemption from Full Participation During 1990 Onsite/Offsite Emergency Exercise.Nrc Region I & FEMA Support Feb 1991 Exercise,Per 900718 Telcon ML20055H8331990-07-20020 July 1990 Submits Change of Addresses for Correspondence Re Util Nuclear Operations ML20055H0231990-07-12012 July 1990 Forwards Public Version of Revised Epips,Including Rev 10 to EP-210,Rev 19 to EP-231 & Rev 13 to EP-237 ML20044A1041990-06-22022 June 1990 Forwards Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Requests 90-03-0 & 90-04-0, Revising Surveillance Requirement 4.9.6.1 for Section 3.9.6 Refueling Platform Re Main Hoists/Auxiliary Hoists ML20043J0371990-06-20020 June 1990 Forwards Description,Scope,Objectives for Plant 1990 Annual Emergency Exercise Scheduled for 900920,per 890809 Ltr.Util Will Submit Revised Objectives for Exercise to Reflect Limited Participation,If Exemption Request Approved ML20043H6081990-06-19019 June 1990 Corrects 900427 Response to Generic Ltr 87-07, Info Transmittal of Final Rulemaking for Revs to Operator Licensing - 10CFR55 & Conforming Amends. ML20055C7621990-06-18018 June 1990 Informs NRC of Plans Re Licensing of Senior Reactor Operators (Sros) Limited to Fuel Handling at Plants.Util in Process of Implementing New Program for Establishment & Maint of Licensed SROs Limited to Fuel Handling at Plants ML20055C7471990-06-15015 June 1990 Requests That Listed Operator Licenses Be Discontinued ML20043G1331990-06-14014 June 1990 Responds to NRC 900614 Ltr Re Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-12.Corrective Actions:Boxes of Completed Procedures Improperly Stored Shipped to Util Storage Vault by 900406 ML20043G9981990-06-12012 June 1990 Forwards, Core Operating Limits Rept for Unit 1 Reload 2, Cycle 3 & Core Operating Limits Rept for Unit 2,Cycle 1. Repts Submitted in Support of Tech Spec Change Request 89-13 Re Parameter Limits,Per Generic Ltr 88-16 ML20043G7311990-06-0808 June 1990 Provides Addl Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Welds Examined During Last Refueling Outage Addressed ML20043G7501990-06-0808 June 1990 Requests Withdrawal of 900516 Tech Spec Change Request 90-11-1 Re Extension of Snubber Visual Insp Period.Change No Longer Needed Since Unit Shutdown on 900605 & Visual Insp of Three Affected Snubbers Performed on 900607 ML20043F8021990-06-0808 June 1990 Forwards Monthly Operating Repts for May 1990 for Limerick Units 1 & 2 & Revised Pages to Mar 1990 Rept for Unit 2 & Apr 1990 Rept for Units 1 & 2 ML20043D8101990-05-29029 May 1990 Forwards Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Specs Change Request 89-07 to Relocate Radiological Effluent Tech Specs to ODCM or Process Control Program,Per Generic Ltr 89-01 ML20043E6571990-05-25025 May 1990 Forwards Public Version of Rev 135 to Epips,Including Rev 11 to EP-202,Rev 14 to EP-282,Rev 12 to EP-284,Rev 8 to EP-312 & Rev 9 to EP-410.W/DH Grimsley 900607 Release Memo ML20055C5121990-05-18018 May 1990 Provides Info Inadvertently Omitted in Re Property Insurance Coverage for Plants.Limerick Generating Station Unit 2 Should Have Been Ref as Being Included Under Insurance Coverage ML20043A7881990-05-16016 May 1990 Requests Exemption from Requirement to Perform Biennial full-participation Onsite/Offsite Emergency Exercise for Plant During 1990 ML20055C4851990-05-15015 May 1990 Forwards Annual Financial Repts for 1989 for Philadelphia Electric Co,Pse&G,Atlantic Energy,Inc & Delmarva Power & Light Co ML20043B1501990-05-14014 May 1990 Forwards Public Version of Rev 134 to Epips,Consisting of Rev 10 to EP-230,Rev 4 to EP-255,Rev 1 to EP-302,Rev 7 to EP-304 & Rev 3 to EP-314.Release Memo Encl ML20043A2361990-05-14014 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-352/90-07 & 50-353/90-06.Corrective Actions:Sampling Review of Plant Baseline Data Will Be Performed to Ensure Product Code Number Correctness for Components ML20042F4481990-05-0101 May 1990 Advises That Plant Transient Response Implementing Plan Procedures & Related Ref Matls Provided to Dj Florek,Nrc Region I,On 900430.Documents Provided in Response to NRC 900327 Ltr Re Preparation for Planned NRC Insp of Procedure ML20042E8741990-04-27027 April 1990 Responds to Generic Ltr 87-07, Info Transmittal of Final Rulemaking for Revs to Operator Licensing. Certifies That Limerick Operator Requalification Training Program Renewed on 900125 & Peach Bottom Subj Program Renewed on 890622 ML20042E0881990-04-0909 April 1990 Forwards Addl Info Re 891011 Tech Spec Change Request 89-09 to Reduce Number of Suppression chamber-to-drywell Vacuum Breakers Required to Be Operable ML20042E0201990-04-0606 April 1990 Forwards Vols 1-3 to Preservice Insp Summary Rept, & Books 1-3 to Form NIS-2 for Preservice Insp Interval 1985-1990, Per 10CFR50.55a(g) & ASME Code Section Xi,Paragraph IWA-6230 ML20012E2151990-03-20020 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants,' for Peach Bottom.Response for Limerick Generating Station Will Be Provided by 900504 ML20012C2931990-03-12012 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey, Per 900118 Request ML20012D9511990-03-0909 March 1990 Forwards Public Version of Revised Epips,Including Rev 10 to EP-203,Rev 12 to EP-317 & Rev 18 to EP-292.W/DH Grimsley 900322 Release Memo ML20012A3631990-03-0101 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-353/89-32 on 891211-15.Corrective Action:Util Will Document Both Receipt & Shipment of Fuel Loading Chambers on Next Semiannual Doe/Nrc Form 742 ML20012A1151990-02-28028 February 1990 Forwards Semiannual Effluent Release Rept 11,Jul Through Dec 1989 & Annual Tower 1 Joint Frequency Distributions of Wind Direction & Speed by Atmosphere Stability,Rept 5 for 1989. W/O Annual Tower 1 Rept ML20012A2621990-02-16016 February 1990 Forwards Public Version of Revs 124 & 125 to Epips, Consisting of Rev 9 to EP-201,Rev 20 to EP-291 & Rev 21 to EP-291 ML20006E7731990-02-16016 February 1990 Requests Discontinuation of Listed Operator Licenses ML20006E6511990-02-15015 February 1990 Discusses & Forwards Results of Field Verification Testing of Unit Spds,Per Licensee Commitment to Submit Rept within 30 Days After Unit SPDS Declared Operational.No Significant Problems Encountered W/Spds During Power Ascension Testing 1990-09-07
[Table view] |
Text
~ , , ,
a E q.f j.c -
10~CPR 2c201 1 m
r s!
. . . . ~. . . . .
i PHILADELPHIA ELiiCTRIC1 COMPANY kiMERICK GE'NER ATING ST ATION-P. O. BOX A y l S AN ATOG A, PENNSYLV ANI A 19464 F- - (2:s) 327.i200, ext, sooo August 13, 1990 G M AH AM M. LEITCH .,
wica p.a sseau, -
u ... .. ......,. . .'a*a Docket No. 50-352 License No. NPF-39 2
LU.S. Nuclear Regulatory Commission '
~E . ATTN:L Document Control Desk i
- Washington,'DC .20555 m
l
SUBJECT:
Limerick Generating Station, Unit 1 ',
Revised Reply to a Notice of Violation NRC Inspection Report Nos. 50-352/90-13 ,
4 and 50-353/90-12 '
r
Dear Sirs:
Attached is a revised. Philadelphia Electric Company reply
'to a-Notico of-Violation for Limerick Generating Station (LGS)-
Unit'1, which was contained in NRC Inspection Report Nos. ;
50-352/90-13 and;50-353/90-12 for-LGS, Units 1 and 2, dated May 7, 1990.- .This Notice of-Violation pertains to the failure to ;
iproperly control documents affecting quality and was identified i
during . art NRC inspection conducted between March 6 and '
April 9', 1990,r'at LGS Units 1 and 2., -;
' . _ . .The attachment to this letter;provides.a restatement of the violation.followed by our~ revised response. During the performance of-the second audit of procedures.as committed to.in. .
the original response, discrepancies in other; controlled books wererldentified. We then. recognized the need to-revise this j
- violation responce to identify that the initial audit completed ;
- on May 10,~1990,. was not sufficient to identify and correct 4
-deficiencies in the controlled copy procedure books.
Furthermore, during review of the-document. control program by the i new DAC-Supervisor, additional deficiencies in other controlled -
documents (e.g. drawings) were identified. Therefore, this i responseLis also,being. revised to. include all of the corrective ;
actions directed at these additional deficiencies. The changes !
are' indicated by revision bar markers in the right hand margins. :
t 9008150267 900813 n PDR ADOCK 05000332 yi Q PDC k 1
rc' .. ~ ' , c
[j); lq'l,g.g y; , ..
01 i b
y y::(: -1,_
3^ :t;f. ' . ,
~.?
' .->.g sc, > :, , '
1 o7n; .
7 ,
3- _
-2; g./ g- ,
.4 (tiri t t I
,?i c
, s' , .:$ ., t ,
, .. -lIf you have any questions,~or require additional I 1
intormation please contact us.
n'
- u
~
.x
- y A;m
!, - m.
- Very truly yours, j
.t s
}4. ,
aGraham'M. Leitch b .
w".
0-4 s
's Vice President, LGS.
i j
w . ,r n,>
DMS/JLPacah Attachment ,f.; -
c e t -. T. T. Martin ~, Administrator, Region I USNRC -(
T.-Ji' Kenny, USNRC Senior Resident' Inspector,. LGS '
n
'i t.
3
.\ $
t t
1
- p, -i i
+
5 i
1 t
in
, -1' 4 y . . .
-i l
i,
.k i, s J
l , ,
!- ..s, > l
[$ > i' . _ _ ___ __._ _____ _
Attachment' ,
. Page-1 of 6
., Inspection No. 50-352/90 Reply to a Notice of: Violation Restatement-of'the Violation- ;
1 As a-result of an inspection: conducted on March 6 - April 9, i 1990,.and'in accordance-with NRC Enforcement Policy (10 CPR 2, j Appendix C), the following violation was identified: i 10.CFR 50, Appendix B, Criterion VI, " Document C0ntrol,"
requires that measures be' established to control the issuance of procedures, including changes, which prescribe alltactivities affecting quality, and that these procedures, including changes, are distributed to the location where the prescribed activity is-performed. These requirements are implemented by Administrative Procedure A-2, " Control of Procedures and Certain Documents." l Contrary to the above, on March 30, 1990, the Construction !
Building-controlled procedures were'found to not be maintained per A-2 in that there were obsolete procedure revisions, missing-procedures, misfiled procedures'and a missing volume of procedures, i
This is a Severity' Level V violation. (Supplement I)
RESPONSE ;
Admission of Alleged Violation !
i' Philadelphia Electric Company (PECo) acknowledges the violation.
Background
From March 6, 1990, to April 9,.1990, the Limerick Generat! rig Staticn (LGS) NRC Resident Inspectors conducted an inspection of the Document Control ~and Records Re:ention Programs for LGS. During their inspection, they issued one triolation related to the Document Control Program. This violation concerned missing and misfiled controlled procedures, incorrect revisions of controlled procedures, and missing controlled procedure books identified in the Controlled Document Locations (CDL). Additionally, the Inspectors identified discrepancies
-with the. Records Retention Program in that boxes of completed procedures were improperly stored, inspection of the PECo storage vault was not being. properly performed, and periodic testing of the Bechtel storage vault fire protection system was not being performed at the established frequency.
___ _ ____._ __ _... . .. . . _...i
.v R+ ' ,
Attachmsnt
_Pagt 2 of'6
. Inspection No. 50-352/90-17 i 4
, ; Reason forithe-Violation The cause of this violation as well as the identified discrepancies is the result of two principa1 factors. The first principal' factor was insufficient management oversight to_ ensure
'that comprehensive programs existed.in the areas of Document Control and Record Retention. The second principal factor was. ,
that the. administrative controls were inadequate-to ensure an !
effective controlled document usage and handling process. ;
Corrective Actions Taken and Results Achieved After Plant Management was notified on March 30, 1990, by j the NRC Resident Inspectors of the violation and discrepancies
-for the Document Control and Records Retention Programs, the- i following immediate corrective actions were implemented. j o On March 31, 1990, a review of six of the largest CDLs at LGS was initiated.- Approximately one-third of the procedures in-these CDLs were reviewed to determine the extent of_the problem. Discrepancies similar to those cited l-in the violation were identified in each CDL. Therefore, on April 2,.1990, an audit of procedures issued and controlled by LGS Document Administration Center (DAC) was initiated.
L The audit was completed by May 10, 1990,~but discrepancies e L were identified in the master listing indicating that ;
l several CDLs were not audited. _A second' comprehensive audit was initiated and completed by July 31, 1990, to provide the. !
assurance that all procedures controlled by LGS-DAC and the master distribution list are being adequately maintained.
L All discrepancies. identified during the second audit-were ,
b corrected by July 31, 1990. ;
) o .On April 12, 1990,- a letter was issued from the LGS Support Manager, responsible for Document Control, to all LGS personnel providing instructions on_the proper use and j handling of the controlled documents in the CDLs.
o On AprilR23, l'90, a letter was issued from the Support !
Manager to Site Management requesting their assistance to ensure the proper use of all controlled documents within their departments at LGS.
o The boxes of completed procedures which were improperly i stored were shipped to the PECo storage vault by April 6, 1990.
o A complete audit of controlled copies of Technical Specifications (TS) books on site was completed by July 31, 1990. Prior to the audit we reevaluated the number
yn Y 7 , ;- _
4, -
'Attachm3nt;
$s hf . Pagt 3 of 6 Inspectibn1No. 50-352/90 'j h '.
4
(
I ?
ac q _
of_ controlled copies of TS-books, significantlyLreduced the-i e distribution and removed the deleted books.- Obsolete'pages,
- missing pages, and misfiled;pages were discovered and
-immediately corrected. ,
I W
+
o A 100% audit of Technical Specification PORC Positions, a controlled document, is in progress and' expected to be sT complete by~ August 15,.1990.
T'" . o. .A 100% audit of all as-built drawings is in. progress and 7(g expected to be complete:by August 17, 1990.
/mib 1o The distribution of Nuclear Group Administrative Procedures
'at LGS will be reviewed and a 100% audit of all locations 11s si+ expected to be-complete by September 25, 1990..
+- ,
o The Final Safety Analysis Report (FSAR) books at LGS have not been audited; however, distribution of the-initial
]
issuance ~of;the Updated Final Safety Analysis! Report is currently _-being performed- . The distribution'has been significantly; reduced and the DAC will assume responsibility 3 for all future updatss. This eliminates'the need-to audit the FSAR books. ;
o- Review and evaluation of documents including but not.llmited' j to Root Cause Analysis Manual, Industrial Safety and Health Manual, Testing and Laboratories Procedures, and Evaluated
' Chemicals / Materials List is being performed to. determine the ;
required leveliof control and the groups responsible.for.
i maintaining this information. This is expected-to be- t complete by December 31, 1990.
o Administrative Procedure A-6.1, " Control of Vendor Manuals," ,
was issued on July 24, 1990 to define the Vendor Manual Program.
?
t 1
Corrective Actions to Prevent Recurrence L
To assure adequate oversight of all controlled documents at 1
! LGS, the following administrative controls and corrective actions will be implemented and completed. These corrective actions will prevent _ recurrence of the violation as well.as the discrepancies addressed in Section 10 of this Inspection Report.
o .A random sampling methodology is being developed using L~ Military Standard 105, " SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES." This periodic random sampling methodology will be performed on all the CDLs and will l
identify specific deficiencies, potential problem areas, and
- adverse trends in a timely manner. Follow up actions will
p yr; g . ..
g -
^
Attachment' Pago 4 of'6 Inspection.No. 50-352/90 be developed for errors identified during/the: periodic L
. random samplingx based on the number and-the severity of-the.
errors. A procedure will be written to ensure this periodic.
+ random sampling methodology is performedLon-an established frequency. An " Administrative Guideline" (AG)'will be written to' describe how to perform the-periodic random sampling methodology. The AG will be implemented through the above procedure. This random sampling-methodology'will be implemented by October 1, 1990; In the' interim, a.
complete' audit of procedures issued and controlled by LGS
- DAC was completed on July- 31,.1990. This audit was initiated.to provide additional assurance that all procedures controlled by LGS DAC~are being adequately maintained. Another 100% audit-to provide additional-assurance that distribution schedules are correct and all-procedures are accurate is expected to be completed by September 25, 1990.
This random sampling would identify discrepancies of the type identified in a previous Violation, 50-353/89-81-01.
However, the corrective _ actions taken in response to;that violation would not have prevented the discrepancies identified in this violation from occurring.
o On April'2, 1990, the Document Administration Center (DAC) supervisor was reassigned to a staff function outside of the
', Document Control and-Records Retention Program areas. The DAC supervisor was-replaced on an interim basis by the Superintendent-Administration until a permanent-replacement could be established. On May121, 1990, a new DAC supervisor was appointed.to assume the DAC' responsibility. The new DAC' supervisor-previously worked at LGS-as the Bechtel Document Control supervisor and has eleven years experience in2this-field. This individual will provide enhanced management oversight'of the Document Control Program needed to ensure that these discrepancies will not recur.
o General Employee Training (GET) will be revised to include a segment which emphasizes-the responsibilities of all LGS personnel for proper use and handling of controlled procedures.. The administrative guidance provided in the April 12 and April 23, 1990 letters, described previously, will also be addressed in this training. This item will be implemented by August 31, 1990.
o A review of the current Document Control and Record Retention Programs is presently being performed by the new DAC supervisor. After this review is completed, a reference manual describing the DAC functions, responsibilities, and training requirements will be developed and reviewed with all current and future DAC personnel. This manual will be controlled and neriodically reviewed by the DAC supervisor.
ja - t Attachmnnt s vn Pag 3'S ofL6
' Inspection No.150-352/90-13 w,
.This item will be completed and implemented by. December 131,
'1990..
o A revision to. Administrative (A) Procedure!A-46,
" Maintenance of Plant Quality Assurance Records," and a_new
. procedure A-46.1, " Nuclear Records-Management,".was issued
.on June 29,.1990. These procedures provide additional l clarification on the Record Retention Program processes and q defineLthe responsibilities of the DAC personnel and of the personnel-who interface with the DAC personnel regarding the storage of controlled documents.- ,
S o Quarterly inspection of the PECo storage vault was a responsibility of the previous DAC supervisor who was reassigned on April 2, 1990, as a result-of the previous document control problems. This function is now the responsibility of a clerk under the direction of the new DAC E stoervisor. .The issue regarding this Inspection Report-was reviewed and discussed with the new supervisor and' clerk to stress the importance of-performing inspections in accoedance with'all-procedures.
i
.o Control of the Bechtel storage vault-fire protectiou system has been fully assumed by the LGS Fire Protection group.
Procedures RT-2-022-601-0.and RT-7-022-344-0 sere issued on !
July 31, 1990 to assure that the fire protection system for this vault is properly. tested. Functional testing of the ;
detectors is performed on a'six month frequency.
]1 o .The' existing method of distributing information from and to l Nuclear Group Headquarters and Peach-Bottom Atomic Power Station is being revised. . A111 controlled documents will be j distributed to a single point.of accountability at each a location. For LGS, this will be.the DAC supervisor. Direct i distribution to individuals from any of the-three. locations will be discontinued, providing better control and j l
accountability for all documents. We expect this new .
process to be completely in place by December 31, 1990. )
i Previous Violations 50-352/87-05-01, and 50-352/87-19-01, and Section=2.2.of Inspection Report 50-352/90-02, discuss ,
discrepancies with Category I red-lined (as-built) drawings. i
.This sub-group of' drawings is controlled by the Modification
' Coordination Section with procedure A-6, "Contrcl and
, ' Distribution of Drawings, Manuals, and Drawing Logs," rather than the DAC personnel with procedure A-2. Because of this, the L corrective actionsLidentified for these items would not have precluded this violation-from occurring.
p E
H
.* . =
l Tr if ,
.Attcchm2nt Pag 3 6 of 6
. -Inspection No. 50-352/90-13
=Date When Full Compliance Was Achieved, Full' compliance with procedures controlled by. LGS DAC was achieved: by July 31, 1990. Full compliance with onsite r controlled copies of Technical Specifications books was achieved
, lby-July- 31,-1990. ' Full compliance with Technical Specifications ,
PORC, Positions and as-built drawings will be achieved at the [
completion of ongoing audits that are expected to be complete by_
- August- 17, 1990. Full compliance with Nuclear. Group l
-Administrative Procedures at LGS is expected by September 25, ,
1990. Full compliance for other controlled documents will be i k achieved-after determining the required level of. control, the .[
L group responsible for maintaining such documents, and performing audits of these documents. This is expected to be complete by
~
December'31, 1990. ;