ML20064A717 | 18 September 1990 | Comments on SALP Board Repts 50-277/89-99 & 50-278/89-99. Author Pledges Continued Mgt Support of & Attention to Rate of Improvement,Achievement of Goals & Performance of Routine Activities | |
ML20065D442 | 14 September 1990 | Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Proposed Schedules for Operator Licensing Exams, Requalification Exams & Generic Fundamental Exams Encl | |
ML20059K367 | 14 September 1990 | Informs of Revised Commitments Re Crud Induced Localized Corrosion Related to Fuel Cladding Failures.Deep Bed Demineralizers Installation Activities Will Be Performed in Unit 1 Subsequent to Third Refueling Outage | Fuel cladding |
ML20064A775 | 13 September 1990 | Advises That Ba Stambauth No Longer Maintains Need to Hold Senior Operator License | |
ML20065D374 | 11 September 1990 | Forwards Rev to Relief Request 10-VRR-2 Re RHR stay-fill Supply Check Valves,Per | |
ML20064A583 | 7 September 1990 | Responds to Violations Noted in Insp Repts 50-352/90-17 & 50-353/90-16 Re Differential Pressure for Pumps.Corrective Actions:Licensee Will No Longer Use Expanded Ranges as Acceptance Criteria for Inservice Testing Program Tests | |
ML20064A482 | 31 August 1990 | Forwards Rev 20 to Emergency Plan.Changes Necessitated by Annual Emergency Plan Update & Administrative in Nature | |
ML20059F054 | 31 August 1990 | Responds to NRC Re Violations Noted in Safety Insp Repts 50-277/90-13 & 50-278/90-13.Corrective Actions: Training Will Be Provided for Personnel Re Requirements of Drawing E1317 & Administrative Procedures A-2 & A-6 | |
ML20059E607 | 29 August 1990 | Forwards Semiannual Effluent Release Rept,Jan-June 1990 & Rev 8 to Odcm | |
ML20028G818 | 27 August 1990 | Forwards Peach Bottom Atomic Power Station Semiannual Effluent Release Rept,Jan-June 1990. No Revs Made to ODCM During Rept Period | |
ML20064A647 | 24 August 1990 | Forwards Public Version of Revised Epips,Consisting of Rev 10 to EP-101,Rev 2 to EP-112,Rev 13 to EP-208,Rev 11 to EP-230 & Rev 22 to EP-291 | |
ML20059E986 | 24 August 1990 | Provides Justification for Applicability of Reload Methodology Topical Repts to Facility & Requests NRC Approval for Application of Reload Analysis Methodologies | |
ML20059B075 | 24 August 1990 | Forwards Rev 0 to Updated FSAR for Limerick Generating Station,Units 1 & 2,Vols 1-19.W/one Oversize Encl. Proprietary Vol 7A (App 3B) Withheld (Ref 10CFR2.790) | Safe Shutdown Loop seal |
ML20059A646 | 15 August 1990 | Responds to Violation Noted in Insp Repts 50-277/90-200, 50-278/90-200,50-277/90-06 & 50-278/90-06 & Payment of Civil Penalty in Amount of $75,000.Corrective Actions:Emergency Svc Water Sys Restored to Operable Status | Unanalyzed Condition Condition Adverse to Quality |
ML20058N959 | 13 August 1990 | Forwards Revised Response to Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-13.Corrective Actions:Ltr Issued to All Plant Personnel Providing Instructions on Proper Use & Handling of Controlled Documents in Controlled Locations | |
ML20058N177 | 10 August 1990 | Responds to NRC Re Unresolved Items Noted in Insp Repts 50-352/90-80 & 50-353/90-80.Plant-specific Technical Guideline Has Been Revised to Ref Contingency Numbers Rather than Transient Response Implementation Plan Procedures | Boric Acid |
ML20063P946 | 10 August 1990 | Provides Plans for Ultimate Disposition of Recirculation Inlet Nozzle to Safe End Weld Indication.Alternative Corrective Actions to Disposition Nozzle to Safe End Weld Indication Include Repair by Weld Overlay W/O Monitoring | Weld Overlay Finite Element Analysis |
ML20058N199 | 9 August 1990 | Advises of Change of Address for Correspondence Re Util Operations.All Incoming Correspondence Must Be Directed to One of Listed Addresses | |
ML20058P126 | 9 August 1990 | Forwards Monthly Operating Repts for Jul 1990 for Limerick Units 1 & 2 & Rev 1 to June 1990 Rept | |
ML20058N128 | 9 August 1990 | Forwards Correction to Rev 10 to EPIP EP-234, Obtaining Containment Gas Samples from Containment Leak Detector During Emergencies | |
ML20058M995 | 8 August 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-352/90-15 & 50-353/90-14.Corrective Actions:Personnel Counseled on Importance of Procedure Compliance & Operations Manual Revised | |
ML20058Q405 | 6 August 1990 | Forwards Public Version of Revised Emergency Response Procedures,Including Rev 12 to ERP-140,App 2,Rev 13 to ERP-140,App 3,Rev 4 to ERP-230,Rev 3 to ERP-305 & Rev 3 to ERP-660 | |
ML20058M663 | 3 August 1990 | Responds to NRC 890406 Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81.Based on Encl Schedule,Overall Projected Implementation Date Will Be 901119 | |
ML20056A961 | 3 August 1990 | Notifies That Be Saxman Terminated Employment & Operating Responsibilities W/Util on 900706 | |
ML20081E158 | 30 July 1990 | Forwards List of 1990 QA Program Changes for Plant.List Identifies Page & Paragraph Number,Brief Description & Type of Change | |
ML20056A042 | 27 July 1990 | Forwards Updated Human Resource Status Rept for Jan-Jul 1990 for Areas Identified in Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81 | |
ML18095A366 | 26 July 1990 | Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations | |
ML18095A376 | 26 July 1990 | Forwards Decommissioning Repts & Certification of Financial Assurance for Plants | |
ML20055J024 | 26 July 1990 | Forwards Response to NRC Regulatory Effectiveness Review Rept for Plant.Response Withheld Per 10CFR73.21 | |
ML20056A973 | 25 July 1990 | Forwards Facility Written Exam Comments for NRC Insp Repts 50-352/90-10 & 50-353/90-11.Written Exam for Reactor Operator & Senior Reactor Operator Considered Comprehensive & Thorough | |
ML18095A372 | 24 July 1990 | Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 | |
ML20055H851 | 24 July 1990 | Responds to NRC 900720 Request for Addl Info Re Util 900516 Request for Exemption from Full Participation During 1990 Onsite/Offsite Emergency Exercise.Nrc Region I & FEMA Support Feb 1991 Exercise,Per 900718 Telcon | Exemption Request |
ML20055H833 | 20 July 1990 | Submits Change of Addresses for Correspondence Re Util Nuclear Operations | |
ML20055H023 | 12 July 1990 | Forwards Public Version of Revised Epips,Including Rev 10 to EP-210,Rev 19 to EP-231 & Rev 13 to EP-237 | |
ML20044B262 | 12 July 1990 | Forwards Annual Progress Rept on Implementation of Control Room Enhancements,Per NUREG-0737.Corrective Actions for All Priority 1 Human Engineering Discrepancies Completed for Unit.Remaining Priority 2 Discrepancies Under Reevaluation | |
ML20055G548 | 11 July 1990 | Forwards Public Version of Revised Epips,Including Rev 12 to ERP-140,App 3 & Revs 3 to ERP-310 & ERP-317 | |
ML20044A104 | 22 June 1990 | Forwards Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Requests 90-03-0 & 90-04-0, Revising Surveillance Requirement 4.9.6.1 for Section 3.9.6 Refueling Platform Re Main Hoists/Auxiliary Hoists | |
ML20043H704 | 21 June 1990 | Forwards Endorsements 143-146 to Nelia Policy NF-140 & Endorsements 93-96 to Maelu Policy MF-67 | |
ML20044A296 | 21 June 1990 | Submits Revised Response to NRC Bulletin 89-002 Re safety- Related Swing Check Valves to Be Installed on Emergency Diesel Generator.Bolts Will Not Be Replaced Because Valves W/Original Internal Bolts Meet Requirements of Bulletin | Anchor Darling |
ML20043J037 | 20 June 1990 | Forwards Description,Scope,Objectives for Plant 1990 Annual Emergency Exercise Scheduled for 900920,per 890809 Ltr.Util Will Submit Revised Objectives for Exercise to Reflect Limited Participation,If Exemption Request Approved | Exemption Request |
ML20043H608 | 19 June 1990 | Corrects 900427 Response to Generic Ltr 87-07, Info Transmittal of Final Rulemaking for Revs to Operator Licensing - 10CFR55 & Conforming Amends. | |
ML20055C762 | 18 June 1990 | Informs NRC of Plans Re Licensing of Senior Reactor Operators (Sros) Limited to Fuel Handling at Plants.Util in Process of Implementing New Program for Establishment & Maint of Licensed SROs Limited to Fuel Handling at Plants | |
ML20055C747 | 15 June 1990 | Requests That Listed Operator Licenses Be Discontinued | |
ML20043G133 | 14 June 1990 | Responds to NRC 900614 Ltr Re Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-12.Corrective Actions:Boxes of Completed Procedures Improperly Stored Shipped to Util Storage Vault by 900406 | |
ML20043G813 | 13 June 1990 | Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-277/90-06 & 50-278/90-06.Corrective Actions:Surveillance Test 6.16, Motor Driven Fire Pump Operability Test, Will Be Revised | High Radiation Area |
ML20043G998 | 12 June 1990 | Forwards, Core Operating Limits Rept for Unit 1 Reload 2, Cycle 3 & Core Operating Limits Rept for Unit 2,Cycle 1. Repts Submitted in Support of Tech Spec Change Request 89-13 Re Parameter Limits,Per Generic Ltr 88-16 | |
ML20043H011 | 12 June 1990 | Advises That AR Wargo Reassigned from Operating Shift Responsibilities & Will Be Resigning License,Effective on 900514 | |
ML20043G731 | 8 June 1990 | Provides Addl Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Welds Examined During Last Refueling Outage Addressed | High Radiation Area Weld Overlay VT-2 |
ML20043F802 | 8 June 1990 | Forwards Monthly Operating Repts for May 1990 for Limerick Units 1 & 2 & Revised Pages to Mar 1990 Rept for Unit 2 & Apr 1990 Rept for Units 1 & 2 | |
ML20055D114 | 8 June 1990 | Forwards Public Version of Revs to Emergency Response Procedures,Including Rev 9 to ERP-140 & Rev 3 to ERP-315 |