ML20058Q405

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Response Procedures,Including Rev 12 to ERP-140,App 2,Rev 13 to ERP-140,App 3,Rev 4 to ERP-230,Rev 3 to ERP-305 & Rev 3 to ERP-660
ML20058Q405
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/06/1990
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058Q407 List:
References
NUDOCS 9008220070
Download: ML20058Q405 (3)


Text

.

<k;. ~,.

17. ? < *: 10CFR50.54(q)

[. 10 CFR 50, Appendix E ..

, PHILADELPHIA ELECTRIC COMPANY 1

.i 4

NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.

WAYNE, PA 19087 5691-

> (zis) eso sooo j 1

August 6 ~1990 i 1

Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 i

U. S. Nuclear Regulatory Commission  !

Attn: Document Control Desk- l Washington, DC 20555 i

SUBJECT:

Peach Botton Atomic Power Station Units 2 and 3 l

' Emergency Plan Implementing Procedures  ;

i

Dear Sir:

Enclosed is revision number 41 to the Emergency Response Procedures'for )

o Peach Botton Atomic Power Station, Units 2 and 3. These procedures are being l

submitted in accordance with.10 CFR 50.54(q), 10 CFR;50 - Appendix E, and 10 CFR  ;

50.4. The following revised procedures are enclosed. '?

l Lo ERP-140, App. 2, Rev. 12 - " Technical Support Team Leader" (TSTL)-

o ERP-140, App. 3. Rev. 13 -

" Dose Assessment Team Leader" (0ATL) o ERP-230 Rev. 04 -

" Operations Support Center (OSC) Activation"

~

o ERP-305 Rev. 03 -

" Dose Assessment Group Leader" (DAGL) v ' -1 l .o ERP-660 Rev. 03 -

" Entry for Emergency. Repair and Operations" l b  ;

S\)

g.

/o

/

i

^

u 9008220070'900806

~PDR

, ADOCK 05000277 eoC

\'

i f.

.., c j

f ', U *- ,

'U.S'.. Nuclear.Regulattry Commission- August 6. 1990-(  ;(E,mergency Plan. Implementing Procedures Page 2.of 2-l

.):

-1

-In accordance with 10 CFR 2.790(a)(6), we request that' names and- telephone' d Leumbers in the above procedures be withheld from public disclosure since such i j

' 'd'sclosures would constitute an unwarranted = invasion of-the personal privacy of the.

i.)dividuals involved. I If you have any questions or require additional information, please do not hesitate'to contact us..

Sincerely, l a d!f e4

/ G. A." Hunger, Jr. .

Manager-Licensing j Nuclear Engineering & Services q l

Enclosure ,1 l

cc: . :J. J. Lyash, USNRC Senior Resident Inspector, PBAPS  !

T. T. 14artin, Administrator, Region I, USNRC (2 copies). '

i a

l l

l l

)

J l.

hv. 1 L

l'

.J

6 uiu,,

/g

\f UNITED STATES NUCLEAR REGULATORY COMMISSION

[ WASHINGTON,0. C. 20666 -

L' k [ August 16.'1990 50-277/278 Peach bottom MEMORANDUM FOR: Chief, Document Control Branch, IRM

, 'FROM: Director, Division of Freedom of Information and Publications Services . ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may now be made publicly available.

//* m<~ W // 6, Donnie H. Grimsley, Director -

Division of Freedom of Information and Publications Services' ,

Office of-Administration 44 0 0 "' "'

DFoa.

m